Select and verify appropriate location for data center
3
Design data center layout
4
Secure power sources and backup options
5
Set up server racks and hardware
6
Install data center cooling systems
7
Configure network infrastructure
8
Install and configure server software
9
Set up security measures (firewalls, access controls, etc.)
10
Approval: Security Measures
11
Test systems for performance and reliability
12
Create and implement disaster recovery plan
13
Set up data backup solutions
14
Implement system monitoring tools
15
Identify and fix any possible Single-Point-of-Failure
16
Test disaster recovery plan for effectiveness
17
Operational readiness test
18
Approval: Operational Readiness Test
19
Documentation of data center setup and operations
20
Plan for future expansions and upgrades
Identify objectives and requirements
This task involves identifying the objectives and requirements for the data center. It is important to have a clear understanding of what the data center needs to achieve and what resources are required. Consider questions such as: What are the specific goals and objectives of the data center? What are the performance requirements? What are the storage requirements? What are the security requirements? The result of this task should be a clear list of objectives and requirements that will guide the rest of the data center setup process.
Select and verify appropriate location for data center
This task involves selecting and verifying the appropriate location for the data center. Consider factors such as proximity to users, accessibility, security, and potential risks. Some questions to ask include: Is the location secure? Is it easily accessible for maintenance and repairs? Is it located in an area with low risk of natural disasters? Is there adequate space for expansion? Verify the chosen location by conducting physical inspections and reviewing relevant documentation. The result of this task should be a verified and appropriate location for the data center.
Design data center layout
This task involves designing the layout of the data center. Consider factors such as space utilization, equipment placement, and traffic flow. Some questions to ask include: What is the optimal layout for the data center? How should the server racks be arranged? Where should the cooling systems be installed? How should the network infrastructure be configured? The result of this task should be a detailed layout plan for the data center.
Secure power sources and backup options
This task involves securing power sources and backup options for the data center. Consider factors such as power capacity, redundancy, and backup systems. Some questions to ask include: What is the power capacity required for the data center? Are there redundant power sources available? What backup options are necessary? The result of this task should be a secure and reliable power source, as well as backup options in case of power failures.
1
Generator
2
UPS
3
Battery backup
1
Cloud backup
2
Offsite backup
3
Tape backup
Set up server racks and hardware
This task involves setting up server racks and hardware in the data center. Consider factors such as rack placement, cable management, and equipment installation. Some questions to ask include: Where should the server racks be placed? How should the cables be organized and managed? How should the hardware be installed? The result of this task should be properly installed server racks and hardware.
1
Rack placement
2
Cable management
3
Hardware installation
Install data center cooling systems
This task involves installing cooling systems in the data center. Consider factors such as cooling capacity, airflow management, and temperature control. Some questions to ask include: What is the cooling capacity required for the data center? How should the airflow be managed to ensure efficient cooling? How should the temperature be controlled? The result of this task should be properly installed and functioning cooling systems.
1
Air conditioning
2
Ventilation
3
Hot aisle/cold aisle arrangement
Configure network infrastructure
This task involves configuring the network infrastructure in the data center. Consider factors such as network topology, IP addressing, and routing. Some questions to ask include: What is the optimal network topology for the data center? How should IP addressing be configured? How should routing be set up? The result of this task should be properly configured network infrastructure.
1
Star
2
Mesh
3
Ring
1
DHCP
2
Static IP
Install and configure server software
This task involves installing and configuring server software in the data center. Consider factors such as operating systems, virtualization platforms, and software updates. Some questions to ask include: What operating system should be installed on the servers? Should virtualization be used? How should software updates be managed? The result of this task should be properly installed and configured server software.
1
Windows Server
2
Linux
3
Unix
1
VMware
2
Hyper-V
3
Proxmox
1
Automatic updates
2
Manual updates
3
Scheduled updates
Set up security measures (firewalls, access controls, etc.)
This task involves setting up security measures in the data center. Consider factors such as firewalls, access controls, and intrusion detection systems. Some questions to ask include: What firewalls should be installed? How should access controls be configured? What intrusion detection systems should be used? The result of this task should be a secure data center with proper security measures in place.
1
Hardware firewall
2
Software firewall
3
Cloud firewall
1
Biometric authentication
2
Usernames and passwords
3
Two-factor authentication
1
Snort
2
Suricata
3
Cisco IDS
Approval: Security Measures
Will be submitted for approval:
Set up security measures (firewalls, access controls, etc.)
Will be submitted
Test systems for performance and reliability
This task involves testing the systems in the data center for performance and reliability. Consider factors such as load testing, stress testing, and failover testing. Some questions to ask include: How should the systems be tested for performance under different load conditions? How should the systems be tested for reliability in case of failures? The result of this task should be systems that are tested and proven to perform reliably under expected conditions.
1
Simulated user load
2
Stress testing
1
Active-passive
2
Active-active
3
Cold standby
Create and implement disaster recovery plan
This task involves creating and implementing a disaster recovery plan for the data center. Consider factors such as backup strategies, data replication, and emergency response procedures. Some questions to ask include: What backup strategies should be used? How should data replication be implemented? What emergency response procedures should be in place? The result of this task should be a comprehensive disaster recovery plan that ensures business continuity in case of disasters.
1
Full backup
2
Incremental backup
3
Differential backup
1
Synchronous replication
2
Asynchronous replication
3
Snapshots
Set up data backup solutions
This task involves setting up data backup solutions in the data center. Consider factors such as backup frequency, retention period, and backup storage. Some questions to ask include: How often should data backups be performed? How long should the backups be retained? Where should the backups be stored? The result of this task should be properly set up data backup solutions that ensure data protection and availability.
1
Daily
2
Weekly
3
Monthly
1
7 days
2
30 days
3
6 months
Implement system monitoring tools
This task involves implementing system monitoring tools in the data center. Consider factors such as performance monitoring, resource utilization monitoring, and alerting capabilities. Some questions to ask include: What system monitoring tools should be used? How should performance be monitored? How should resource utilization be monitored? The result of this task should be a well-implemented system monitoring solution that provides timely insights into the performance and health of the data center.
1
Nagios
2
Zabbix
3
SolarWinds
1
CPU usage
2
Memory usage
3
Network traffic
1
Storage capacity
2
Bandwidth usage
3
Power consumption
Identify and fix any possible Single-Point-of-Failure
This task involves identifying and fixing any possible single points of failure in the data center. Consider factors such as redundant systems, backup solutions, and fault-tolerant configurations. Some questions to ask include: Are there any single points of failure in the current setup? How can redundant systems be implemented? What fault-tolerant configurations should be considered? The result of this task should be a data center with minimized single points of failure and increased availability.
1
Power supply
2
Network connectivity
3
Storage systems
1
Redundant power supplies
2
Network load balancing
3
RAID configurations
Test disaster recovery plan for effectiveness
This task involves testing the disaster recovery plan for its effectiveness in the data center. Consider factors such as scenario-based testing, failover testing, and data restoration. Some questions to ask include: How should the disaster recovery plan be tested in different scenarios? How should failover testing be conducted? How should data restoration be tested? The result of this task should be a well-tested and effective disaster recovery plan.
1
Natural disaster scenario
2
Hardware failure scenario
3
Data corruption scenario
1
Active-passive
2
Active-active
3
Cold standby
1
Full data restore
2
Partial data restore
3
Point-in-time restore
Operational readiness test
This task involves conducting an operational readiness test for the data center. Consider factors such as operations procedures, competency of staff, and system functionality. Some questions to ask include: Are the operations procedures well-documented and understood by the staff? Is the staff competent in performing their roles? Is the system functioning as expected? The result of this task should be a data center that is operationally ready and capable of meeting its objectives.
1
Documentation review
2
Staff training assessment
3
Procedure walkthrough
Approval: Operational Readiness Test
Will be submitted for approval:
Operational readiness test
Will be submitted
Documentation of data center setup and operations
This task involves documenting the setup and operations of the data center. Consider factors such as network diagrams, equipment inventories, and operational procedures. Some questions to ask include: What documentation is required for the data center setup? How should the equipment inventory be documented? What operational procedures should be documented? The result of this task should be comprehensive documentation that provides a clear understanding of the data center setup and operations.
1
Physical network diagram
2
Logical network diagram
1
Server inventory
2
Networking equipment inventory
3
Storage system inventory
Plan for future expansions and upgrades
This task involves planning for future expansions and upgrades of the data center. Consider factors such as scalability, technology trends, and business growth projections. Some questions to ask include: What are the future expansion plans for the data center? What technological trends should be considered for future upgrade planning? What are the business growth projections and how do they impact the data center? The result of this task should be a well-defined plan for future expansions and upgrades of the data center.