Document critical applications and ensure a backup plan
3
Schedule a downtime for the transition with all related stakeholders
4
Approval: Downtime schedule
5
Prepare the new data center site
6
Disconnect and pack all equipment
7
Coordinate transportation of equipment to the new location
8
Approval: Transportation Coordination
9
Install and reconnect equipment at the new site
10
Test all connections and applications
11
Approval: Connection and Application Testing Results
12
Backup all data and applications
13
Reconnect and test all network connections
14
Inform all stakeholders about successful data center relocation
15
Perform a final walkthrough and check of old Data Center site
16
Approval: Final Walkthrough Check
17
Begin operations in new location
18
Secure a certificate of destruction for obsolete equipment
19
Return leased equipment
20
Finalize the data center exit documentation
Document the physical infrastructure
This task involves documenting the physical infrastructure of the current data center. It is important to create a comprehensive inventory of all the equipment, racks, cables, and other infrastructure components. This will serve as a reference for future planning and troubleshooting. Make sure to include details such as serial numbers, locations, and specifications of each item. Take photographs to visually capture the layout of the data center. Be thorough and meticulous in your documentation to ensure accuracy and ease of reference.
1
Servers
2
Switches
3
Routers
4
Firewalls
5
Storage devices
1
Photographs
2
Written descriptions
3
Serial number records
4
Cable diagrams
5
Rack layout plans
Document critical applications and ensure a backup plan
In this task, you need to document all critical applications running in the current data center and develop a backup plan for each. Identify the applications that are vital for the organization's operations and assess their dependencies on infrastructure components. Determine the potential impact of downtime on each application and devise a strategy for minimizing disruptions during the data center transition. Make sure to include contact information for application owners and support teams. This documentation will serve as a reference for troubleshooting issues during the relocation process.
1
High
2
Medium
3
Low
1
Back up to local storage
2
Replicate to alternate data center
3
Utilize cloud storage
4
Test restore process
5
Ensure offsite backups
Schedule a downtime for the transition with all related stakeholders
This task involves coordinating with all stakeholders to schedule a planned downtime for the data center transition. The purpose of the downtime is to minimize the impact of the transition on ongoing operations. Consult with the IT team, application owners, and other key stakeholders to identify a suitable date and time for the downtime. Communicate the planned downtime to all relevant parties and ensure their agreement and availability during the transition. This will help ensure a smooth relocation process and minimize disruptions to business operations.
1
High
2
Medium
3
Low
1
IT team
2
Application owners
3
Infrastructure team
4
Network team
5
Management
Approval: Downtime schedule
Will be submitted for approval:
Schedule a downtime for the transition with all related stakeholders
Will be submitted
Prepare the new data center site
In this task, you need to prepare the new data center site for the equipment transfer. Ensure that the new site meets the required specifications for housing the data center infrastructure. Check for proper power supply, cooling systems, and physical security measures. Verify that the racks, cabinets, and network connectivity are installed and configured correctly. This will ensure a smooth and efficient transition of the equipment from the old data center to the new location.
1
Single-phase
2
Three-phase
3
Redundant power supply
1
Precision air conditioning
2
Chilled water system
3
Free cooling
4
Hot aisle/cold aisle containment
5
Row-based cooling
1
Racks and cabinets
2
Power distribution units
3
Cooling units
4
Network equipment
5
Security systems
1
Fiber optic
2
Ethernet
3
Wireless
4
VPN
5
Backup connectivity
Disconnect and pack all equipment
This task involves safely disconnecting and packing all equipment at the old data center site. Ensure that all equipment is powered off properly and all connections are properly labeled for easy reinstallation. Use appropriate protective measures such as anti-static packaging, padding, and secure fastening to prevent damage during transportation. Take inventory of the packed equipment to verify completeness and avoid any loss or misplacement during the relocation process.
1
Servers
2
Switches
3
Routers
4
Firewalls
5
Storage devices
1
Anti-static packaging
2
Padding material
3
Secure fastening
4
Labeling for easy identification
5
Inventory list for verification
Coordinate transportation of equipment to the new location
In this task, you need to coordinate the transportation of all packed equipment from the old data center to the new location. Arrange for reliable transportation services that can handle the delicate nature of the equipment. Coordinate with the transportation team to ensure a smooth and timely transfer of the equipment. Communicate the schedule and any special handling instructions to the transportation team to minimize the risk of damage during transportation.
1
Yes
2
No
Approval: Transportation Coordination
Will be submitted for approval:
Coordinate transportation of equipment to the new location
Will be submitted
Install and reconnect equipment at the new site
This task involves installing and reconnecting all equipment at the new data center site. Set up the racks, cabinets, and other infrastructure components according to the pre-planned layout. Make sure to follow manufacturer's guidelines and best practices for installation to ensure optimal performance and reliability. Reconnect all cables and wires, ensuring proper labeling for easy identification. Consult the equipment documentation or contact the manufacturer for any specific installation instructions.
1
Servers
2
Switches
3
Routers
4
Firewalls
5
Storage devices
1
Standard
2
Hot aisle/cold aisle
3
Open rack
1
Labeling for easy identification
2
Separate power and data cables
3
Use cable management accessories
4
Follow cable routing guides
5
Ensure proper grounding
Test all connections and applications
In this task, you need to perform testing of all connections and applications in the new data center to ensure proper functionality. Test network connections, ensuring proper data transfer rates and stability. Test the connectivity and performance of critical applications to validate their functionality. Identify and troubleshoot any issues that arise during the testing process. Document the results of the testing for future reference and as a validation of a successful transition to the new data center.
1
Network cables
2
Fiber optic links
3
VPN connectivity
4
Remote access systems
5
Backup connectivity
1
Email service
2
Database system
3
File storage and sharing
4
Web applications
5
Customer relationship management
1
Successful
2
Partial success
3
Failure
4
Pending
5
Not applicable
Approval: Connection and Application Testing Results
Will be submitted for approval:
Test all connections and applications
Will be submitted
Backup all data and applications
This task involves backing up all data and applications in the new data center to ensure data integrity and availability. Set up backup mechanisms and schedules for all critical data and applications. Use reliable backup solutions that provide encryption, deduplication, and remote storage capabilities for data protection. Test the restore process to verify the integrity of the backups and ensure a smooth recovery in case of any unforeseen incidents. Regularly monitor and maintain the backup systems to ensure their effectiveness over time.
1
Databases
2
User files
3
Configuration files
4
Log files
5
Application data
1
On-premise backup server
2
Cloud-based backup service
3
Tape backup system
4
Disk-to-disk backup
5
Incremental backups
1
Daily
2
Weekly
3
Monthly
4
Real-time
5
Custom schedule
1
Test full restore
2
Test partial restore
3
Verify data integrity
4
Verify recovery time
5
Document backup procedures
Reconnect and test all network connections
In this task, you need to reconnect and test all network connections in the new data center to ensure proper communication and data transfer. Verify the physical connectivity of switches, routers, and other network equipment. Test network links and ensure proper routing and VLAN configurations. Monitor network traffic and verify the bandwidth utilization. Troubleshoot and resolve any connectivity issues that arise during the testing process.
1
LAN connections
2
WAN connections
3
Internet connectivity
4
Virtual private networks
5
Firewall rules
1
Static routes
2
Dynamic routing protocols
3
VLAN tagging
4
VLAN trunking
5
Quality of Service (QoS) settings
1
Low
2
Medium
3
High
4
Exceeding capacity
5
Not applicable
Inform all stakeholders about successful data center relocation
This task involves communicating the successful relocation of the data center to all stakeholders. Notify the IT team, application owners, management, and other key stakeholders about the completion of the transition and the availability of services in the new data center. Provide any necessary instructions or changes in procedures that may be required as a result of the relocation. Acknowledge the efforts of the team involved in the process and express gratitude for their cooperation and support.
Perform a final walkthrough and check of old Data Center site
In this task, you need to perform a final walkthrough and check of the old data center site to ensure that it has been properly decommissioned. Verify that all equipment has been removed and all connections have been disconnected. Check for any remaining data or sensitive information that needs to be securely wiped or destroyed. Inspect the physical infrastructure for any damages or issues that need to be addressed. Document the final condition of the old data center site for future reference.
1
Verified
2
Pending
3
Not applicable
1
Completed
2
Pending
3
Not applicable
Approval: Final Walkthrough Check
Will be submitted for approval:
Perform a final walkthrough and check of old Data Center site
Will be submitted
Begin operations in new location
This task involves initiating operations in the new data center location. Ensure that all necessary services have been successfully migrated and that all systems are functioning as expected. Coordinate with the IT team, application owners, and end-users to verify the availability and performance of critical services. Monitor the systems closely during the initial period to identify and address any issues that may arise. Celebrate the successful transition and communicate the new contact details and procedures to all stakeholders.
1
Network monitoring
2
Server monitoring
3
Application monitoring
4
User experience monitoring
5
Capacity planning
1
24 hours
2
48 hours
3
72 hours
4
1 week
5
2 weeks
Secure a certificate of destruction for obsolete equipment
This task involves securing a certificate of destruction for all obsolete equipment that has been decommissioned. Contact a certified disposal service provider or electronics recycling company to handle the proper disposal of the equipment. Ensure that the disposal process follows environmentally friendly practices and complies with relevant regulations. Obtain a certificate of destruction as proof that the equipment has been disposed of properly and in accordance with data security and environmental standards.
1
Certified disposal service provider
2
Electronics recycling company
Return leased equipment
In this task, you need to return any leased equipment that is no longer required after the data center relocation. Identify all leased equipment and check the terms of the leasing agreements for return instructions and timelines. Coordinate with the leasing provider to schedule the return and ensure that the equipment is properly packaged and labeled. Inspect the returned equipment for any damages or missing components before completing the return process.
1
Servers
2
Switches
3
Routers
4
Firewalls
5
Storage devices
1
No damages or missing components
2
Damages found
3
Missing components
4
Pending inspection
Finalize the data center exit documentation
This task involves finalizing the documentation related to the data center exit process. Review all the documentation created throughout the process and ensure that it is complete and accurate. Compile the documentation into a comprehensive report that includes details such as equipment inventory, applications and their backup plans, transition schedule, testing results, and any other relevant information. Store the documentation in a secure and accessible location for future reference and audits.