Below is the Application Survey. This is a mandated survey that must be completed before even being considered for the role. You must complete this within the next 72 hours or your resume will be discarded.
If there is something preventing you from completing this survey in the next 72 hours, please contact [email protected].
If you have any questions please call 646-733 -6167
Example Residential Survey Checklist
^^Please download the above checklist to begin^^
your first Ciellie Solar Site Survey!
1) Drone Flight: in this initial section of the survey, you will perform two drone orbital flights. In each drone flight, you will take a minimumof 100 images of the property. All images MUST be taken in JPG/JPEG
Picture of Measuring Tape at 8ft
The first image you will take is a "Picture of Measuring Tape at 8ft". Your first step is to take your measuring tape, lock it at 8ft, then take an image with your drone showing that it is at 8ft. Here is an example image below:
125ft AGL 40 degree camera tilt Orbital Flight
In this sequence of images you will perform a "125ft AGL 40 degree camera tilt Orbital Flight". In these sequence of images, you will fly to 125ft AGL and tilt your camera at a 40* angle with the house in the middle of the screen. Keep the house centered the entire orbit.
See an example of "125ft AGL 40 degree camera tilt Orbital Flight" here (these images are for example purposes ONLY and are at 200ft- you must submit 100 images at 125ft):
After this orbit, you should have taken a minimum of 100 images.
125ft AGL 90 degree camera tilt Photo (1) for Map Notes
The next image you will take is "125ft AGL 90 degree camera tilt Photo (1) for Map Notes". You will later utilize this image to create a map to show where the breaker, meter & attic access(es) are. Please include a compass for the key, as well.
You will download this image to mark up where the breaker, meter & attic access(es) are. See an example below:
40-75ft AGL 40 degree camera tilt Orbital Flight
The next sequence of images you will take is a "40-75ft AGL 40 degree camera tilt Orbital Flight". In this sequence of images, you will fly to 40-75ft AGL and tilt your camera at a 40* angle with the house in the middle of the screen. Keep the house centered the entire orbit.The house should take up 75% of your screen. Position the house in the middle of the screen, 40* camera tilt & 75% of your screen should be taken up by the house. REMEMBER: you must have a minimum of 100 unique images once you have completed your orbital flight
Up-Close Roof Quality Inspection
In this sequence of images, you will take images of each side of the roof as close as you are comfortable getting. This will allow us to check the quality of the roof. Please take a single image of each roof panel so it fills the screen, and then multiple photos of each panel divided into at least 2 subsections. Focus on obstructions and any damaged areas. See an example of this sequence here: up-close roof quality inspection
2) Exterior & Meter: in this part of the survey, you will walk around taking images from all around the exterior of the house. You will also locate the electric meter & take images of the meter
Front of house showing house # photo
In this image, "Front of house showing house # photo" you will simply take a photo of the address number. Please confirm that the image is not blurry.
Contextual photos walking around the house
In this sequence of images, you will walk all around the exterior of the house. Each side of the house should be its own image.
See example images of "Photos above & below Meter" here: Example images here
Pull back photo 3’ from meter
Pull back photo 6’ from meter
Similar to above. Just pull back 6' this time.
3) Electrical Breaker: in this part of the survey, you will take images of the main service panel, any sub-panels (if applicable) & any external panels (if applicable)
Replace dead-front cover & Check that nothing was switched on/off
Once you are done taking the Photos with dead-front cover removed showing wiring, replace the dead-front cover back on. Make sure you do not trigger any switches as you do this.
Photos of MSP, door open after dead-front cover is replaced
Replace the dead-front, then take images of the MSP with the door open & some with the door closed. See examples here: MSP with the dead-front Replaced
If there's an External Panel (EXP) create & label a separate folder. Repeat sequence above (MSP instructions) for the EXP
Sub-Panel (SUBP, if Present):
create & label a separate folder. Repeat sequence above (MSP instructions) for the SUBP
4) Attic_Truss: in this part of the survey, you will take images of the any attic accesses as well as measure & capture the truss' height, width & spacing
Take photos of showing the height, width & spacing of the rafters/truss. The photos MUST be showing the measuring tape clearly showing the measurement. This is crucial.
Rafter/Truss Height
Rafter/Truss Width
Rafter/Truss Spacing
5) Map Notes: in this part of the survey, you will:
- Download the “200ft AGL 90 degree camera tilt Photo for Map Notes” Image
- Add a map key - Add North, South, East & West - Mark Breaker Location
- Mark Sup & External Panels (If applicable)
- Mark Attic Access(es) - Mark Roof(s) - Mark Meter
Congrats! You've just completed your first of many Ciellie Solar Site Surveys!
Once submitted, a Ciellie Team member will review & approve your practice survey. Keep an eye out on your email for next steps from us!
PLEASE MAKE SURE THAT THE SHARED FOLDER LINKS ARE VIEWABLE
^^^^^^^^^^^
Application Survey Email Reminder
{{form.Enter_your_Email}}
Your Application with Ciellie
Didn't Move Forward?
1
No drone
2
Pay isn't enough
3
Not willing to travel
4
Not responding
5
Other
Service Agreement
The following is a Contractor Agreement between Ciellie & {{form.First_Name_2}} {{form.Last_Name_2}}. Please download, sign & upload the completed document below.
Please download the above agreement
Please have your service agreement completed and signed before your onboarding call.
Any questions you have can be answered at that time.
Email Confirmation (AFTER APP SURVEY COMPLETION)
{{form.Enter_your_Email}}
Ciellie Application
Review Practice Survey
Will be submitted for approval:
Application Survey
Will be submitted
Ciellie Onboarding Call Email
{{form.Enter_your_Email}}
Ciellie Onboarding
Hey {{form.First_Name_2}}! Congratulations! You've been accepted as a Ciellie Solar Technician. Please check your calendar associated with your application email for your scheduled onboarding call. Welcome to the team! _ Ciellie Operations