Start one run for one asset and one lifecycle event. Identify the asset before making accounting or custody changes, and attach the source evidence available at intake. Use the existing asset ID for transfers, impairment reviews, and disposals; for a new asset, enter the provisional procurement or project identifier. Do not combine multiple assets in one run unless they are a single recognised component group under policy.
1
New acquisition
2
Capital improvement
3
Custody or location transfer
4
Impairment indicator review
5
Disposal or retirement
1
Land
2
Buildings and improvements
3
Plant and machinery
4
Vehicles
5
Furniture and fixtures
6
Computer hardware
7
Other equipment
Validate ownership and evidence
Confirm the organisation controls the asset or transaction and that the evidence agrees on vendor, date, amount, description, and responsible owner. Check for duplicate asset records and identify missing purchase, commissioning, transfer, valuation, or disposal support. Record discrepancies instead of silently correcting source documents.
1
Complete and consistent
2
Complete with minor discrepancy
3
Incomplete evidence
4
Duplicate record suspected
5
Ownership or control unclear
Assess accounting recognition and cost
Apply the organisation's accounting policy and capitalisation threshold. For recognition, document whether future economic benefits are probable and cost is reliably measurable. Include purchase price net of discounts plus directly attributable costs needed to bring the asset to the location and condition required for use; exclude routine servicing and unsupported allocations. Escalate uncertain or material judgements.
1
Capitalise new asset
2
Capitalise component or improvement
3
Expense as incurred
4
Transfer existing asset record
5
Derecognise or impair existing asset
Record commissioning and component details
Complete this task for a new acquisition or capital improvement. Record when the asset became available for use, because depreciation starts when it is in the location and condition necessary to operate as intended. Identify material components with different useful lives and preserve serial, tag, and commissioning evidence.
Set depreciation policy parameters
Set depreciation inputs only after the asset is available for use. Choose a method that reflects the consumption pattern, document useful life and residual value, and note any separately depreciated components. Use approved policy ranges; unusual estimates require explicit support and later review at each financial year-end.
1
Straight-line
2
Diminishing balance
3
Units of production
4
No depreciation for land
5
Other policy-approved method
Approval: Accounting treatment
Will be submitted for approval:
Validate ownership and evidence
Will be submitted
Assess accounting recognition and cost
Will be submitted
Record commissioning and component details
Will be submitted
Set depreciation policy parameters
Will be submitted
Update controlled asset register
Apply the approved event to the controlled fixed asset register. Use one authoritative asset ID and carry forward the approved cost, owner, location, status, commissioning date, and depreciation parameters. Link to the updated record and retain evidence of the change; do not re-key source data into another unofficial schedule.
1
Active and in service
2
Under construction
3
Transferred
4
Impaired
5
Held for disposal
6
Disposed or retired
Reconcile register and general ledger
Reconcile the asset-level register change to the general ledger or document why no journal is required. Compare the approved amount, register amount, and posted journal, investigate every variance, and retain the posting reference. A mismatch must route to exception resolution before final approval.
1
Matched with no variance
2
Matched after documented correction
3
No journal entry required
4
Mismatch requires correction
5
Posting pending outside service level
Tag and hand over asset
For a commissioned acquisition or improvement, confirm the physical tag matches the register, capture evidence of location and condition, and obtain custody acceptance from the responsible owner. Do not close the handover with an unreadable tag, an unconfirmed location, or a custodian who has not accepted responsibility.
1
Tag applied and readable
2
Existing tag verified
3
Tag replacement required
4
Asset cannot be tagged
5
Tag evidence pending
Process asset custody transfer
Use this branch for a custody or location transfer. Verify the asset and tag before movement, record both relinquishing and receiving parties, update location and access records, and obtain receiving confirmation. Escalate missing assets, damaged tags, or disputed custody as control exceptions.
Assess asset impairment indicator
Use this branch only when an impairment indicator has been identified. Compare carrying amount with recoverable amount under the applicable policy, document the valuation basis and assumptions, and quantify any proposed impairment. Where an individual asset does not generate independent cash flows, identify the relevant cash-generating unit and escalate specialist valuation needs.
1
Physical damage
2
Technological obsolescence
3
Adverse market change
4
Operating underperformance
5
Restructuring or closure
6
No impairment indicator confirmed
Process asset disposal or retirement
Use this branch for sale, scrapping, donation, loss, or retirement. Confirm authorisation, stop depreciation at the appropriate date, calculate the difference between net proceeds and carrying amount, remove custody and access records, and preserve disposal evidence. Never record proceeds as disposal gain without considering the carrying amount.
1
Third-party sale
2
Trade-in
3
Scrap or recycle
4
Donation
5
Lost or destroyed
6
Retirement without proceeds
Resolve asset control exceptions
Resolve incomplete evidence, suspected duplicates, ownership uncertainty, reconciliation mismatches, overdue postings, missing tags, or custody disputes before final approval. Assign one owner, define a dated corrective action, record the root cause, and attach proof of resolution. If the issue cannot be resolved within policy, document the formal escalation and compensating control.
1
Missing or inconsistent evidence
2
Duplicate asset record
3
Ownership or custody uncertainty
4
Register ledger mismatch
5
Missing or unreadable tag
6
Overdue accounting entry
7
Other control failure
1
Resolved with correction
2
Resolved with compensating control
3
Escalated for policy decision
4
Accepted as immaterial
5
Open and blocking approval
Approval: Final accounting control
Will be submitted for approval:
Update controlled asset register
Will be submitted
Reconcile register and general ledger
Will be submitted
Tag and hand over asset
Will be submitted
Process asset custody transfer
Will be submitted
Assess asset impairment indicator
Will be submitted
Process asset disposal or retirement
Will be submitted
Resolve asset control exceptions
Will be submitted
Close and archive asset event
Close the lifecycle event only after final approval. Confirm the authoritative register and ledger references, preserve the complete evidence package under the records-retention policy, and record any future review trigger such as year-end useful-life review or post-transfer verification. The cover image is provided separately for manual application to the template.
Optional cookies and similar technologies support analytics, advertising and visitor identification, and embedded content. Change or withdraw consent in Cookie settings. Cookie policy.