1
Verify roof surface is clean, smooth, and dry
2
Confirm presence of required installation tools and equipment
3
Ensure the roof membrane is aligned correctly and without wrinkles
4
Inspect edges of the TPO membrane for any damages or defects
5
Verify appropriate measures for wind uplift resistance are observed
6
Ensure the membrane seams are correctly hot-air welded
7
Confirm flashings and accessories are properly installed
8
Perform a seam probe inspection
9
Perform water tightness test on the roof
10
Ensure manufacturer's recommended maintenance protocols are communicated
11
Approval: Project Supervisor Inspection
12
Document all observations and findings
13
Take pictures of the finished roof system
14
Comply with all safety and disposal regulations
15
Plan for the removal and recycling of material wastes
16
Submission of final roof installation report
17
Approval: Client Satisfaction