{"id":11713,"date":"2017-07-28T12:19:15","date_gmt":"2017-07-28T12:19:15","guid":{"rendered":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-agricultural-buildings\/"},"modified":"2024-02-28T20:11:14","modified_gmt":"2024-02-28T20:11:14","slug":"electrical-inspection-checklist-agricultural-buildings","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-agricultural-buildings\/","title":{"rendered":"Electrical Inspection Checklist: Agricultural Buildings"},"content":{"rendered":"<section id=\"intro-to-agricultural-buildings\">\n<h2> Intro to Agricultural Buildings: <\/h2>\n<div class=\"image-content\">\n<figure>\n   <a href=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/q_Ibo-KoWyn8eoD-WxFEzA.png\" alt=\"Electrical Inspection Checklist: Agricultural Buildings\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/q_Ibo-KoWyn8eoD-WxFEzA.png\" \/> <\/a><figcaption>\n     Electrical Inspection Checklist: Agricultural Buildings<br \/>\n   <\/figcaption><\/figure>\n<\/p><\/div>\n<div class=\"text-content\">\n<p>This Electrical Inspection Checklist: Agricultural Buildings is engineered to provide<strong> an NEC compliant process<\/strong> to guide you in your safety inspections.<\/p>\n<p>Agricultural buildings can be subject to degrees of stress due to a large presence of livestock and their design often leaves them open and exposed to the elements.<\/p>\n<p><strong>This process is editable<\/strong> and you can restructure elements to suit your specific need. Each task listed contains the relevant NEC section reference which applies to the action. It is recommended that you <strong>familiarize yourself with the standards before beginning any inspection<\/strong>.&nbsp;<\/p>\n<p>Throughout the checklist, form fields have been included for you to record relevant information. This data is stored in the template overview which you can view on the left-hand tab for the template. <strong>You can export this data<\/strong> for review to provide an overview into your inspections.&nbsp;<\/p>\n<p>If you utilize the form fields well, you can select to print your checklist which will give you the option to save it as a PDF. This can, therefore, act as a report generator which you can save and then send to the relevant stakeholders once your inspection is completed.<\/p>\n<p>You can <strong>watch this video below<\/strong> for an insight into the career of an agricultural electrical inspector.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"video-content\">\n<div class=\"iframe-container\">\n   <iframe src=\"https:\/\/www.youtube.com\/embed\/hSt9fKZQWj0?modestbranding=1&amp;showinfo=0\" frameborder=\"0\" allowfullscreen=\"true\"> <\/iframe>\n  <\/div>\n<div class=\"description\">\n    Agricultural Inspection Career Overview - citytowninfo\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"record-inspection-details\">\n<h2> Record inspection details <\/h2>\n<div class=\"text-content\">\n<p>Use this section to record the key details of the inspection.<\/p>\n<p><strong>Enter your information into the form fields<\/strong> provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"text-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Inspector's name <\/label><br \/>\n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled=\"disabled\" class=\"form-control\" \/>\n  <\/div>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Location to be inspected <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Reason for inspection <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"date-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Date of inspection <\/label> <\/p>\n<div class=\"date-container\">\n    <button type=\"button\" disabled=\"disabled\" class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button>\n   <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"text-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Site manager of location <\/label><br \/>\n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled=\"disabled\" class=\"form-control\" \/>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"run-general-inspection-safety-checklist\">\n<h2> Run general inspection safety checklist <\/h2>\n<div class=\"text-content\">\n<p>An electrical inspection is normally needed to ensure the safety of others. However, it is important to <strong>make sure that your own safety is not put at risk<\/strong> in performing the inspection.&nbsp;<\/p>\n<p>You can find here our checklist for making sure you are safe before performing your inspection<\/p>\n<p><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Electrical Inspection Checklist<\/a><\/p>\n<p>The first half of this checklist is designed to help you assess the area and risk in order to do your job safely and well.&nbsp;<\/p>\n<p>We recommend you <strong>run this checklist before starting any inspection<\/strong>.<\/p>\n<\/p><\/div>\n<\/section>\n<section id=\"determine-the-applicability-of-article-547\">\n<h2> Determine the applicability of Article 547 <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC: 547.1<\/strong><\/p>\n<p>Article 541 defines what comes under the category of agricultural and in doing so determines what safety inspection guidelines to follow.<\/p>\n<p>Make sure that your location fits within the standards given by article 547.<\/p>\n<p><strong>Record any notes in the form field below.<\/strong><\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-wiring-methods-for-suitability-for-the-occupancy\">\n<h2> Check wiring methods for suitability for the occupancy <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC: 547.5<\/strong><\/p>\n<p>You should check that the wires are not only suitable for the location, but are also in good condition and are not exposed.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-that-underground-grounding-conductors-are-covered\">\n<h2> Verify that underground grounding conductors are covered <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC: 547.5(F)<\/strong><\/p>\n<p>Make sure that the grounding conductors stored underground are covered or insulated.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-switches-circuit-breakers-and-controllers\">\n<h2> Check switches, circuit breakers, and controllers <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;547.5(C), 547.6&nbsp;<\/strong><\/p>\n<p>Check all switches, controllers, and circuit breakers for enclosures suitable for the conditions.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-luminaires-are-installed\">\n<h2> Make sure luminaires are installed <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;547.8&nbsp;<\/strong><\/p>\n<p>Luminaires are useful for minimizing the impact dust and water can cause. Make sure they have been installed.&nbsp;<\/p>\n<p>Also, check that any fixtures which are exposed to damage have been suitably supplied with guards.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"video-content\">\n<div class=\"iframe-container\">\n   <iframe src=\"https:\/\/www.youtube.com\/embed\/sqsP7xY2AyE?modestbranding=1&amp;showinfo=0\" frameborder=\"0\" allowfullscreen=\"true\"> <\/iframe>\n  <\/div>\n<div class=\"description\">\n    Learn the basics of a lighting Luminaire - PhilipsLighting\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-the-arrangement-of-service-equipment-is-compliant\">\n<h2> Check the arrangement of service equipment is compliant <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;547.9&nbsp;<\/strong><\/p>\n<p>Make sure the arrangement of all:<\/p>\n<ul>\n<li>service equipment,<\/li>\n<li>distribution equipment,<\/li>\n<li>overcurrent protection,<\/li>\n<li>and grounding<\/li>\n<\/ul>\n<p>...complies with requirements.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-an-equipotential-plane-has-been-installed\">\n<h2> Make sure an equipotential plane has been installed <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;547.10&nbsp;<\/strong><\/p>\n<p>Equipotential planes should be installed within the concrete floors of livestock enclosures. The plane should be bonded to electrodes and conductive elements.<\/p>\n<p>For more about equipotential planes, check out this <a href=\"http:\/\/www.mikeholt.com\/download.php?file=PDF\/EQUIPOTENTIAL_PLANES.pdf\" rel=\"nofollow noopener\" target=\"_blank\">PDF linked<\/a>.&nbsp;<\/p>\n<p><strong>Leave any notes in the form field below<\/strong>.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-that-gfci-protection-has-been-provided\">\n<h2> Verify that GFCI protection has been provided <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;547.5(G)&nbsp;<\/strong><\/p>\n<p>It is important to make sure your ground fault circuiter interrupters are present where they are required.&nbsp;<\/p>\n<p><strong>Use the form field below to leave any notes.&nbsp;<\/strong><\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"write-down-overall-notes-regarding-inspection\">\n<h2> Write down overall notes regarding inspection <\/h2>\n<div class=\"text-content\">\n<p>If you have any other thoughts or <strong>comments which you would like to include in your report<\/strong>, leave them in the form field provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Comments on the inspection <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"send-report-via-email-to-key-stakeholders\">\n<h2> Send report via email to key stakeholders <\/h2>\n<div class=\"text-content\">\n<p><strong>You can use the email widget<\/strong> to send a copy of your report to the key stakeholders.&nbsp;<\/p>\n<p>The information from your first task is being pulled into the body of the email through the use of&nbsp;<em>variables<\/em>. You can find more about <a href=\"https:\/\/www.process.st\/help\/docs\/variables\/\" rel=\"nofollow noopener\" target=\"_blank\">variables on our help site<\/a>.&nbsp;<\/p>\n<\/p><\/div>\n<\/section>\n<section id=\"sources\">\n<h2> Sources: <\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"http:\/\/samples.jbpub.com\/9781284041835\/Electrical_Inspection_Checklists.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Jones and Bartlett - Electrical Inspection Manual With Checklists, 2014<\/a><\/li>\n<li><a href=\"http:\/\/www.dot.ca.gov\/hq\/esc\/ttsb\/electrical\/pdf\/QA%20Inspection%20Guidelines.pdf\" rel=\"nofollow noopener\" target=\"_blank\">The State of California, Department of Transportation - Electrical QA Inspection Manual, 2015<\/a><\/li>\n<li><a href=\"http:\/\/www.sciencedirect.com\/science\/book\/9781856176545\" rel=\"nofollow noopener\" target=\"_blank\">Science Direct - Electrical Safety Code Manual, 2010<\/a><\/li>\n<li><a href=\"http:\/\/www.nfpa.org\/nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - NEC Overview<\/a>&nbsp;<\/li>\n<li><a href=\"http:\/\/www.nfpa.org\/nec\/about-the-nec\/changes-to-the-2017-nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - Changes to the 2017 NEC<\/a>&nbsp;<\/li>\n<\/ul><\/div>\n<\/section>\n<section id=\"related-checklists\">\n<h2> Related Checklists: <\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist\/\" rel=\"nofollow\">Electrical Inspection Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-motors-and-vehicles\" rel=\"nofollow\">Electrical Inspection Checklist: Motors and Vehicles<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-marinas-docks-and-boatyards\" rel=\"nofollow\">Electrical Inspection Checklist: Marinas, Docks, and Boatyards<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-electric-vehicle-charging-equipment\" rel=\"nofollow\">Electrical Inspection Checklist: Electric Vehicle Charging Equipment<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-agricultural-buildings\" rel=\"nofollow\">Electrical Inspection Checklist: Agricultural Buildings<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-hospitals-and-health-care\" rel=\"nofollow\">Electrical Inspection Checklist: Hospitals and Health Care<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-residential-rough-inspection-general\" rel=\"nofollow\">Electrical Inspection Checklist: Residential Rough Inspection General<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-air-conditioning-and-refrigerating\" rel=\"nofollow\">Electrical Inspection Checklist: Air-Conditioning and Refrigerating<\/a><\/li>\n<\/ul><\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Intro to Agricultural Buildings: Electrical Inspection Checklist: Agricultural Buildings This Electrical Inspection Checklist: Agricultural Buildings is engineered to provide an NEC compliant process to guide you in your safety inspections. Agricultural buildings can be subject to degrees of stress due to a large presence of livestock and their design often leaves them open and exposed [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11714,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"","cover_icon_url":"","tasks_count":"15","template_description":"Run this Electrical Inspection Checklist: Agricultural Buildings when you perform your on site inspection.","template_id":"o8TQF3CU98OF7pgS119Cvg","task_0":"Intro to Agricultural Buildings:","task_slug_0":"intro-to-agricultural-buildings","task_1":"Record inspection details","task_slug_1":"record-inspection-details","task_2":"Run general inspection safety checklist","task_slug_2":"run-general-inspection-safety-checklist","task_3":"Determine the applicability of Article 547","task_slug_3":"determine-the-applicability-of-article-547","task_4":"Check wiring methods for suitability for the occupancy","task_slug_4":"check-wiring-methods-for-suitability-for-the-occupancy","task_5":"Verify that underground grounding conductors are covered","task_slug_5":"verify-that-underground-grounding-conductors-are-covered","task_6":"Check switches, circuit breakers, and controllers","task_slug_6":"check-switches-circuit-breakers-and-controllers","task_7":"Make sure luminaires are installed","task_slug_7":"make-sure-luminaires-are-installed","task_8":"Check the arrangement of service equipment is compliant","task_slug_8":"check-the-arrangement-of-service-equipment-is-compliant","task_9":"Make sure an equipotential plane has been installed","task_slug_9":"make-sure-an-equipotential-plane-has-been-installed","task_10":"Verify that GFCI protection has been provided","task_slug_10":"verify-that-gfci-protection-has-been-provided","task_11":"Write down overall notes regarding inspection","task_slug_11":"write-down-overall-notes-regarding-inspection","task_12":"Send report via email to key stakeholders","task_slug_12":"send-report-via-email-to-key-stakeholders","task_13":"Sources:","task_slug_13":"sources","task_14":"Related Checklists:","task_slug_14":"related-checklists","task_15":"","task_slug_15":"","task_16":"","task_slug_16":"","task_17":"","task_slug_17":"","task_18":"","task_slug_18":"","task_19":"","task_slug_19":"","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[13],"tags":[],"class_list":["post-11713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=11713"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11713\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media\/11714"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=11713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=11713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=11713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}