{"id":11716,"date":"2017-07-28T12:30:10","date_gmt":"2017-07-28T12:30:10","guid":{"rendered":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-air-conditioning-and-refrigerating\/"},"modified":"2024-02-28T20:11:19","modified_gmt":"2024-02-28T20:11:19","slug":"electrical-inspection-checklist-air-conditioning-and-refrigerating","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-air-conditioning-and-refrigerating\/","title":{"rendered":"Electrical Inspection Checklist: Air-Conditioning and Refrigerating"},"content":{"rendered":"<section id=\"intro-to-airconditioning-and-refrigerating\">\n<h2> Intro to Air-Conditioning and Refrigerating: <\/h2>\n<div class=\"image-content\">\n<figure>\n   <a href=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/i_chFuO8gRiF0ovRuHdGEQ.png\" alt=\"Electrical Inspection Checklist: Air-Conditioning and Refrigerating\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/i_chFuO8gRiF0ovRuHdGEQ.png\" \/> <\/a><figcaption>\n     Electrical Inspection Checklist: Air-Conditioning and Refrigerating<br \/>\n   <\/figcaption><\/figure>\n<\/p><\/div>\n<div class=\"text-content\">\n<p>This Electrical Inspection Checklist: Air-Conditioning and Refrigerating&nbsp;is engineered to provide an NEC&nbsp;compliant process to guide you in your safety inspections.<\/p>\n<p>Air-conditioning and refrigerating equipment is commonplace within both residential and commercial spaces and requires regular inspection. This process is geared to<strong> follow the guidelines laid out in an actionable way<\/strong>.&nbsp;<\/p>\n<p><strong>This process is editable<\/strong> and you can add or remove steps as you please. Each inspection-specific task contains the relevant NEC section reference which applies to the action. It is recommended that you <strong>familiarize yourself with the standards before beginning any inspection<\/strong>.&nbsp;<\/p>\n<p>Throughout the checklist, you will find form fields where you can record relevant information. This data will be stored in the template overview which you can view on the left-hand tab for the template. <strong>You can export this data<\/strong> for review to provide an overview into your inspections.&nbsp;<\/p>\n<p>If you utilize the form fields well, you can select to print your checklist which will give you the option to save it as a PDF. This can, therefore, act as a report generator which you can save and then send to the relevant stakeholders once your inspection is completed.<\/p>\n<p>Watch this video below for an introduction to dealing with electrical elements of air-conditioning units.<\/p>\n<\/p><\/div>\n<div class=\"video-content\">\n<div class=\"iframe-container\">\n   <iframe src=\"https:\/\/www.youtube.com\/embed\/lKkrjWPVz9I?modestbranding=1&amp;showinfo=0\" frameborder=\"0\" allowfullscreen=\"true\"> <\/iframe>\n  <\/div>\n<div class=\"description\">\n    AC power cords explained, testing, installation, safety | tips &amp; methods -1929fordhotrod\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"record-inspection-details\">\n<h2> Record inspection details <\/h2>\n<div class=\"text-content\">\n<p>Use this section to record the key details of the inspection.<\/p>\n<p><strong>Enter your information into the form fields<\/strong> provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"text-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Inspector's name <\/label><br \/>\n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled=\"disabled\" class=\"form-control\" \/>\n  <\/div>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Location to be inspected <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Reason for inspection <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"date-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Date of inspection <\/label> <\/p>\n<div class=\"date-container\">\n    <button type=\"button\" disabled=\"disabled\" class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button>\n   <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"text-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Site manager of location <\/label><br \/>\n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled=\"disabled\" class=\"form-control\" \/>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"run-general-inspection-safety-checklist\">\n<h2> Run general inspection safety checklist <\/h2>\n<div class=\"text-content\">\n<p>An electrical inspection is normally needed to ensure the safety of others. However, it is important to <strong>make sure that your own safety is not put at risk<\/strong> in performing the inspection.&nbsp;<\/p>\n<p>You can find here our checklist for making sure you are safe before performing your inspection<\/p>\n<p><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Electrical Inspection Checklist<\/a><\/p>\n<p>The first half of this checklist is designed to help you assess the area and risk in order to do your job safely and well.&nbsp;<\/p>\n<p>We recommend you <strong>run this checklist before starting any inspection<\/strong>.<\/p>\n<\/p><\/div>\n<\/section>\n<section id=\"identify-equipment-for-inspection\">\n<h2> Identify equipment for inspection <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.1, 440.2&nbsp;<\/strong><\/p>\n<p>Article 440 defines what equipment falls within the scope of the guidelines.<\/p>\n<p>Specifically, this process is geared to deal with equipment containing <em>Hermetic Refrigerant Motor-Compressors<\/em>.<\/p>\n<p><strong>Use the form field below<\/strong> to record any notes. &nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"record-the-applicable-nameplate-information\">\n<h2> Record the applicable nameplate information <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.4&nbsp;<\/strong><\/p>\n<p>Most equipment nameplates will have some common items of information. Many of these are self-explanatory, and include:<\/p>\n<ul>\n<li>Manufacturer<\/li>\n<li>Manufacturer\u02bcs address<\/li>\n<li>Model number<\/li>\n<li>Serial number<\/li>\n<li>Certification marks<\/li>\n<\/ul>\n<p>The nameplate should also give further <strong>technical information specific to the electric motor<\/strong> which we can use within the inspection process.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-the-branchcircuit-conductor-size-is-appropriate\">\n<h2> Make sure the branch-circuit conductor size is appropriate <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.31 through 440.35&nbsp;<\/strong><\/p>\n<p>You can determine the suitability of the branch-circuit conductor size based on the information we gained from examining the nameplate.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-the-conductor-sizes-for-those-supplying-multiple-units\">\n<h2> Verify the conductor sizes for those supplying multiple units <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;430.24, 430.25<\/strong><\/p>\n<p>If a conductor is supplying multiple units then it requires a greater size than one which is only servicing a single unit. Assess the relationship between the conductor and the units it serves to ensure standards are being adhered to.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-the-branchcircuit-overload-protection\">\n<h2> Check the branch-circuit overload protection <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.51 through 440.55&nbsp;<\/strong><\/p>\n<p>Firstly, you have to check that the branch-circuit&nbsp;overload protection is present and then assess its suitability for the job it is required to do.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-the-branchcircuit-shortcircuit-and-groundfault-protection\">\n<h2> Check the branch-circuit short-circuit and ground-fault protection <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.21, 440.22<\/strong><\/p>\n<p>Check that the three are all present and that they are appropriate for the size of their task.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-the-feeder-shortcircuit-and-groundfault-protection\">\n<h2> Check the feeder short-circuit and ground-fault protection <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;430.61 through 430.63<\/strong><\/p>\n<p>Verify that feeder short-circuit and ground-fault protection is both provided and properly sized where applicable.<\/p>\n<p>Use the form field below to record notes.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-the-controllers-have-adequate-ratings\">\n<h2> Make sure the controllers have adequate ratings <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.4(B), 440.41&nbsp;<\/strong><\/p>\n<p>Make sure that controllers have the ratings appropriate to the task they are performing. In cases where the controllers are not part of a larger multimotor or combination load equipment, you need to also check the short circuit current ratings.&nbsp;<\/p>\n<p><strong>Leave any notes in the form field provided<\/strong>.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-the-disconnecting-means-have-adequate-ratings\">\n<h2> Make sure the disconnecting means have adequate ratings <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.12, 440.13&nbsp;<\/strong><\/p>\n<p>Check the ratings of the disconnecting means.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-the-disconnecting-means-are-in-sight-and-accessible\">\n<h2> Verify the disconnecting means are in sight and accessible <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;110.26, 440.14<\/strong><\/p>\n<p>As part of a broader observation on the suitability of the working spaces, make sure that the disconnecting means are both in sight and accessible. Check they are not blocked by obstacles or hidden behind the equipment itself.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-lcdi-devices-or-afci-protection-are-provided-for-cords\">\n<h2> Verify LCDI devices or AFCI protection are provided for cords <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;440.60 through 440.65&nbsp;<\/strong><\/p>\n<p>Verify that:<\/p>\n<ul>\n<li>conductors,<\/li>\n<li>receptacles,<\/li>\n<li>cords,<\/li>\n<li>and overcurrent devices<\/li>\n<\/ul>\n<p>...for room air conditioners are properly sized and that LCDI devices or AFCI protection is provided for cords.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-for-adequate-lighting-in-the-area\">\n<h2> Check for adequate lighting in the area <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;210.8, 210.63, 210.70&nbsp;<\/strong><\/p>\n<p>If you can't see the equipment well enough then this could cause future maintenance&nbsp;issues. Make sure that adequate lighting is in place where the equipment is located.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"write-down-overall-notes-regarding-inspection\">\n<h2> Write down overall notes regarding inspection <\/h2>\n<div class=\"text-content\">\n<p>If you have any other thoughts or <strong>comments which you would like to include in your report<\/strong>, leave them in the form field provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Comments on the inspection. <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"send-report-via-email-to-key-stakeholders\">\n<h2> Send report via email to key stakeholders <\/h2>\n<div class=\"text-content\">\n<p><strong>You can use the email widget<\/strong> to send a copy of your report to the key stakeholders.&nbsp;<\/p>\n<p>The information from your first task is being pulled into the body of the email through the use of&nbsp;<em>variables<\/em>. You can find more about <a href=\"https:\/\/www.process.st\/help\/docs\/variables\/\" rel=\"nofollow noopener\" target=\"_blank\">variables on our help site<\/a>.&nbsp;<\/p>\n<\/p><\/div>\n<\/section>\n<section id=\"sources\">\n<h2> Sources: <\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"http:\/\/samples.jbpub.com\/9781284041835\/Electrical_Inspection_Checklists.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Jones and Bartlett - Electrical Inspection Manual With Checklists, 2014<\/a><\/li>\n<li><a href=\"http:\/\/www.dot.ca.gov\/hq\/esc\/ttsb\/electrical\/pdf\/QA%20Inspection%20Guidelines.pdf\" rel=\"nofollow noopener\" target=\"_blank\">The State of California, Department of Transportation - Electrical QA Inspection Manual, 2015<\/a><\/li>\n<li><a href=\"http:\/\/www.sciencedirect.com\/science\/book\/9781856176545\" rel=\"nofollow noopener\" target=\"_blank\">Science Direct - Electrical Safety Code Manual, 2010<\/a><\/li>\n<li><a href=\"http:\/\/www.nfpa.org\/nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - NEC Overview<\/a>&nbsp;<\/li>\n<li><a href=\"http:\/\/www.nfpa.org\/nec\/about-the-nec\/changes-to-the-2017-nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - Changes to the 2017 NEC<\/a>&nbsp;<\/li>\n<\/ul><\/div>\n<\/section>\n<section id=\"related-checklists\">\n<h2> Related Checklists: <\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist\/\" rel=\"nofollow\">Electrical Inspection Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-motors-and-vehicles\" rel=\"nofollow\">Electrical Inspection Checklist: Motors and Vehicles<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-marinas-docks-and-boatyards\" rel=\"nofollow\">Electrical Inspection Checklist: Marinas, Docks, and Boatyards<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-electric-vehicle-charging-equipment\" rel=\"nofollow\">Electrical Inspection Checklist: Electric Vehicle Charging Equipment<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-agricultural-buildings\" rel=\"nofollow\">Electrical Inspection Checklist: Agricultural Buildings<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-hospitals-and-health-care\" rel=\"nofollow\">Electrical Inspection Checklist: Hospitals and Health Care<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-residential-rough-inspection-general\" rel=\"nofollow\">Electrical Inspection Checklist: Residential Rough Inspection General<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-air-conditioning-and-refrigerating\" rel=\"nofollow\">Electrical Inspection Checklist: Air-Conditioning and Refrigerating<\/a><\/li>\n<\/ul><\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Intro to Air-Conditioning and Refrigerating: Electrical Inspection Checklist: Air-Conditioning and Refrigerating This Electrical Inspection Checklist: Air-Conditioning and Refrigerating&nbsp;is engineered to provide an NEC&nbsp;compliant process to guide you in your safety inspections. Air-conditioning and refrigerating equipment is commonplace within both residential and commercial spaces and requires regular inspection. This process is geared to follow the guidelines [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11717,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"","cover_icon_url":"","tasks_count":"19","template_description":"Run this Electrical Inspection Checklist: Air-Conditioning and Refrigerating when you perform your on site inspection.","template_id":"qgzrYwQ4kfA7OMROQ01A-g","task_0":"Intro to Air-Conditioning and Refrigerating:","task_slug_0":"intro-to-airconditioning-and-refrigerating","task_1":"Record inspection details","task_slug_1":"record-inspection-details","task_2":"Run general inspection safety checklist","task_slug_2":"run-general-inspection-safety-checklist","task_3":"Identify equipment for inspection","task_slug_3":"identify-equipment-for-inspection","task_4":"Record the applicable nameplate information","task_slug_4":"record-the-applicable-nameplate-information","task_5":"Make sure the branch-circuit conductor size is appropriate","task_slug_5":"make-sure-the-branchcircuit-conductor-size-is-appropriate","task_6":"Verify the conductor sizes for those supplying multiple units","task_slug_6":"verify-the-conductor-sizes-for-those-supplying-multiple-units","task_7":"Check the branch-circuit overload protection","task_slug_7":"check-the-branchcircuit-overload-protection","task_8":"Check the branch-circuit short-circuit and ground-fault protection","task_slug_8":"check-the-branchcircuit-shortcircuit-and-groundfault-protection","task_9":"Check the feeder short-circuit and ground-fault protection","task_slug_9":"check-the-feeder-shortcircuit-and-groundfault-protection","task_10":"Make sure the controllers have adequate ratings","task_slug_10":"make-sure-the-controllers-have-adequate-ratings","task_11":"Make sure the disconnecting means have adequate ratings","task_slug_11":"make-sure-the-disconnecting-means-have-adequate-ratings","task_12":"Verify the disconnecting means are in sight and accessible","task_slug_12":"verify-the-disconnecting-means-are-in-sight-and-accessible","task_13":"Verify LCDI devices or AFCI protection are provided for cords","task_slug_13":"verify-lcdi-devices-or-afci-protection-are-provided-for-cords","task_14":"Check for adequate lighting in the area","task_slug_14":"check-for-adequate-lighting-in-the-area","task_15":"Write down overall notes regarding inspection","task_slug_15":"write-down-overall-notes-regarding-inspection","task_16":"Send report via email to key stakeholders","task_slug_16":"send-report-via-email-to-key-stakeholders","task_17":"Sources:","task_slug_17":"sources","task_18":"Related Checklists:","task_slug_18":"related-checklists","task_19":"","task_slug_19":"","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[13],"tags":[],"class_list":["post-11716","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11716","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=11716"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11716\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media\/11717"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=11716"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=11716"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=11716"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}