{"id":11719,"date":"2017-07-28T12:35:52","date_gmt":"2017-07-28T12:35:52","guid":{"rendered":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-electric-vehicle-charging-equipment\/"},"modified":"2024-03-19T08:59:56","modified_gmt":"2024-03-19T08:59:56","slug":"electrical-inspection-checklist-electric-vehicle-charging-equipment","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-electric-vehicle-charging-equipment\/","title":{"rendered":"Electrical Inspection Checklist: Electric Vehicle Charging Equipment"},"content":{"rendered":"\n<section id=\"intro-to-electrical-vehicle-charging-equipment\">\n <h2>Intro to Electrical Vehicle Charging Equipment:<\/h2>\n <div class=\"image-content\">\n  <figure>\n   <a href=\"https:\/\/ps-attachments.s3.amazonaws.com\/23d04649-3d05-45f3-b999-f08305645775\/keYK-lntt40rqZ4mE05LsA.png\" alt=\"Intro to Electrical Vehicle Charging Equipment:\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ps-attachments.s3.amazonaws.com\/23d04649-3d05-45f3-b999-f08305645775\/keYK-lntt40rqZ4mE05LsA.png\"> <\/a><!-- No caption -->\n  <\/figure>\n <\/div>\n <div class=\"text-content\">\n  <p>This Electrical Inspection Checklist: Electric Vehicle Charging Equipment&nbsp;is engineered to provide<strong> an NEC compliant process<\/strong> to guide you in your safety inspections.<\/p>\n  <p>Electric vehicles are an increasingly popular form of transports and have seen both established manufacturers leaning toward them, while new emergent companies like Tesla also gain notoriety.<\/p>\n  <p>Electric cars are very powerful and, on a full charge, contain a large amount of energy. As such, it is important that <strong>we are able to provide a safe experience for users of electric cars<\/strong>. The first step to providing that is being able to maintain the equipment with effective inspection processes.&nbsp;<\/p>\n  <p><strong>This template is malleable<\/strong> and you can add or remove steps or detail within each step as you please. Each inspection-specific task contains the relevant NEC section reference to contextualize the advice and provide a greater opportunity to see how the process relates to the source material. It is recommended that you <strong>familiarize yourself with the standards before beginning any inspection<\/strong>.&nbsp;<\/p>\n  <p>Throughout the checklist, you will find form fields where you can record relevant information. This data will be stored in the template overview which you can view on the left-hand tab for the template. <strong>You can export this data<\/strong> for review to provide an overview into your inspections.&nbsp;<\/p>\n  <p>If you utilize the form fields well, you can select to print your checklist which will give you the option to save it as a PDF. This can, therefore, act as a report generator which you can save and then send to the relevant stakeholders once your inspection is completed.<\/p>\n  <p><strong>Watch the video below<\/strong> to get an idea of how an inspection would work. This video shows the inspection process for a Nissan Leaf.&nbsp;<\/p>\n <\/div>\n <div class=\"video-content\">\n  <div class=\"iframe-container\">\n   <iframe src=\"https:\/\/www.youtube.com\/embed\/ig-NQgY0FWc?modestbranding=1&amp;showinfo=0\" frameborder=\"0\" allowfullscreen=\"true\"> <\/iframe>\n  <\/div>\n  <div class=\"description\">\n   Nissan LEAF Charging Station Home Inspection - JollyGreenOpinion\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"record-inspection-details\">\n <h2>Record inspection details<\/h2>\n <div class=\"date-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Date of inspection <\/label>\n   <div class=\"date-container\">\n    <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button>\n   <\/div>\n  <\/div>\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Inspector's name <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Location to be inspected <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Reason for inspection <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Site manager of location <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p>Use this section to record the key details of the inspection.<\/p>\n  <p><strong>Enter your information into the form fields<\/strong> provided.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"run-general-inspection-safety-checklist\">\n <h2>Run general inspection safety checklist<\/h2>\n <div class=\"text-content\">\n  <p>An electrical inspection is normally needed to ensure the safety of others. However, it is important to <strong>make sure that your own safety is not put at risk<\/strong> in performing the inspection.&nbsp;<\/p>\n  <p>You can find here our checklist for making sure you are safe before performing your inspection<\/p>\n  <p><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Electrical Inspection Checklist<\/a><\/p>\n  <p>The first half of this checklist is designed to help you assess the area and risk in order to do your job safely and well.&nbsp;<\/p>\n  <p>We recommend you <strong>run this checklist before starting any inspection<\/strong>.<\/p>\n <\/div>\n<\/section>\n<section id=\"make-sure-all-equipment-devices-and-fittings-are-listed\">\n <h2>Make sure all equipment, devices, and fittings are listed<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.5&nbsp;<\/strong><\/p>\n  <p>Make sure everything is accounted for and present. If certain elements of equipment are missing, this can lead to problems with protection or other safety concerns.<\/p>\n  <p><strong>Use the form field below<\/strong> to leave your notes.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"check-the-condition-of-the-electric-vehicle-coupler\">\n <h2>Check the condition of the electric vehicle coupler<\/h2>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.10&nbsp;<\/strong><\/p>\n  <p>The coupler is a key movable part in the charging process. As such, it can be exposed to greater risk of damage or wear. Make sure the coupler is suitable for the job and that its condition meets safety standards.<\/p>\n <\/div>\n<\/section>\n<section id=\"make-sure-coupler-and-cable-safeguards-have-been-provided\">\n <h2>Make sure coupler and cable safeguards have been provided<\/h2>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.18, 625.19<\/strong><\/p>\n  <p>Check that safeguards are in place or provided for the charging equipment.&nbsp;<\/p>\n  <p>Leave your notes in the form field provided.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"verify-the-rating-of-branchcircuit-and-feeder-overcurrent-devices\">\n <h2>Verify the rating of branch-circuit and feeder overcurrent devices<\/h2>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.40, 625.41<\/strong><\/p>\n  <p>Make sure the ratings meet required standards.<\/p>\n  <p>You can read more about feeder overcurrents and their protection and equipment practices at <a href=\"http:\/\/www.ecmweb.com\/code-basics\/nec-rules-overcurrent-protection-equipment-and-conductors\" rel=\"nofollow noopener\" target=\"_blank\">ECMWeb<\/a>.<\/p>\n  <p>You can leave your notes in the space below.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"check-for-the-provision-of-a-personnel-protection-system\">\n <h2>Check for the provision of a personnel protection system<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.22&nbsp;<\/strong><\/p>\n  <p>It is always important to prioritize personnel safety when conducting checks and inspections. Make sure the protection system in place is adequate and sufficient to meet the demands placed upon it.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"check-the-location-of-disconnecting-means\">\n <h2>Check the location of disconnecting means<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.42<\/strong><\/p>\n  <p>Given that electric vehicles are very energy intensive&nbsp;pieces of equipment, the charging process utilizes a great deal of energy. For this reason, it's of vital importance to have adequate disconnecting means available.&nbsp;<\/p>\n  <p>Check the location of disconnecting means rated <strong>over 60 amperes or 150 volts<\/strong> to the ground.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"make-sure-there-are-backfeed-prevention-provisions\">\n <h2>Make sure there are backfeed prevention provisions<\/h2>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.46, 625.48&nbsp;<\/strong><\/p>\n  <p>When charging an electric vehicle, we want to make sure power is only heading in one direction. Our backfeed prevention set up will help provide that there is no risk of reversed voltage polarity.&nbsp;<\/p>\n  <p>Make sure the charging equipment is <strong>able to provide these suitable protections<\/strong>.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"record-location-and-height-of-charging-equipment\">\n <h2>Record location and height of charging equipment<\/h2>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Height <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Location <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.50<\/strong><\/p>\n  <p>You can use the form fields below to record the location and height of the charging equipment.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"assess-the-ventilation-needs-for-any-indoor-charging-equipment\">\n <h2>Assess the ventilation needs for any indoor charging equipment<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;625.15, 625.52<\/strong><\/p>\n  <p>It is important to make sure that the location has been properly assessed for its ventilation needs. If ventilation is required then it should be in place, and the ventilation potential of the location should be held to an appropriate standard.&nbsp;<\/p>\n  <p>Electric cars may be cleaner than the gas guzzling counterparts, but well-ventilated charging areas should still be maintained.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"write-down-overall-notes-regarding-inspection\">\n <h2>Write down overall notes regarding inspection<\/h2>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Comments on the inspection. <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"text-content\">\n  <p>If you have any other thoughts or <strong>comments which you would like to include in your report<\/strong>, leave them in the form field provided.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"send-report-via-email-to-key-stakeholders\">\n <h2>Send report via email to key stakeholders<\/h2>\n <div class=\"text-content\">\n  <p><strong>You can use the email widget<\/strong> to send a copy of your report to the key stakeholders.&nbsp;<\/p>\n  <p>The information from your first task is being pulled into the body of the email through the use of&nbsp;<em>variables<\/em>. You can find more about <a href=\"https:\/\/www.process.st\/help\/docs\/variables\/\" rel=\"nofollow noopener\" target=\"_blank\">variables on our help site<\/a>.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"sources\">\n <h2>Sources:<\/h2>\n <div class=\"text-content\">\n  <ul>\n   <li><a href=\"http:\/\/samples.jbpub.com\/9781284041835\/Electrical_Inspection_Checklists.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Jones and Bartlett - Electrical Inspection Manual With Checklists, 2014<\/a><\/li>\n   <li><a href=\"http:\/\/www.dot.ca.gov\/hq\/esc\/ttsb\/electrical\/pdf\/QA%20Inspection%20Guidelines.pdf\" rel=\"nofollow noopener\" target=\"_blank\">The State of California, Department of Transportation - Electrical QA Inspection Manual, 2015<\/a><\/li>\n   <li><a href=\"http:\/\/www.sciencedirect.com\/science\/book\/9781856176545\" rel=\"nofollow noopener\" target=\"_blank\">Science Direct - Electrical Safety Code Manual, 2010<\/a><\/li>\n   <li><a href=\"http:\/\/www.nfpa.org\/nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - NEC Overview<\/a>&nbsp;<\/li>\n   <li><a href=\"http:\/\/www.nfpa.org\/nec\/about-the-nec\/changes-to-the-2017-nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - Changes to the 2017 NEC<\/a>&nbsp;<\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"related-checklists\">\n <h2>Related Checklists:<\/h2>\n <div class=\"text-content\">\n  <ul>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist\/\" rel=\"nofollow\">Electrical Inspection Checklist<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-motors-and-vehicles\" rel=\"nofollow\">Electrical Inspection Checklist: Motors and Vehicles<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-marinas-docks-and-boatyards\" rel=\"nofollow\">Electrical Inspection Checklist: Marinas, Docks, and Boatyards<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-electric-vehicle-charging-equipment\" rel=\"nofollow\">Electrical Inspection Checklist: Electric Vehicle Charging Equipment<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-agricultural-buildings\" rel=\"nofollow\">Electrical Inspection Checklist: Agricultural Buildings<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-hospitals-and-health-care\" rel=\"nofollow\">Electrical Inspection Checklist: Hospitals and Health Care<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-residential-rough-inspection-general\" rel=\"nofollow\">Electrical Inspection Checklist: Residential Rough Inspection General<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-air-conditioning-and-refrigerating\" rel=\"nofollow\">Electrical Inspection Checklist: Air-Conditioning and Refrigerating<\/a><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Intro to Electrical Vehicle Charging Equipment: This Electrical Inspection Checklist: Electric Vehicle Charging Equipment&nbsp;is engineered to provide an NEC compliant process to guide you in your safety inspections. Electric vehicles are an increasingly popular form of transports and have seen both established manufacturers leaning toward them, while new emergent companies like Tesla also gain notoriety. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11720,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"\ud83d\udd0c","cover_icon_url":"","tasks_count":"16","template_description":"Run this Electrical Inspection Checklist: Electrical Vehicle Charging Equipment when you perform your on site inspection.","template_id":"sHChrS732vypMH649vRIAQ","task_0":"Intro to Electrical Vehicle Charging Equipment:","task_slug_0":"intro-to-electrical-vehicle-charging-equipment","task_1":"Record inspection details","task_slug_1":"record-inspection-details","task_2":"Run general inspection safety checklist","task_slug_2":"run-general-inspection-safety-checklist","task_3":"Make sure all equipment, devices, and fittings are listed","task_slug_3":"make-sure-all-equipment-devices-and-fittings-are-listed","task_4":"Check the condition of the electric vehicle coupler","task_slug_4":"check-the-condition-of-the-electric-vehicle-coupler","task_5":"Make sure coupler and cable safeguards have been provided","task_slug_5":"make-sure-coupler-and-cable-safeguards-have-been-provided","task_6":"Verify the rating of branch-circuit and feeder overcurrent devices","task_slug_6":"verify-the-rating-of-branchcircuit-and-feeder-overcurrent-devices","task_7":"Check for the provision of a personnel protection system","task_slug_7":"check-for-the-provision-of-a-personnel-protection-system","task_8":"Check the location of disconnecting means","task_slug_8":"check-the-location-of-disconnecting-means","task_9":"Make sure there are backfeed prevention provisions","task_slug_9":"make-sure-there-are-backfeed-prevention-provisions","task_10":"Record location and height of charging equipment","task_slug_10":"record-location-and-height-of-charging-equipment","task_11":"Assess the ventilation needs for any indoor charging equipment","task_slug_11":"assess-the-ventilation-needs-for-any-indoor-charging-equipment","task_12":"Write down overall notes regarding inspection","task_slug_12":"write-down-overall-notes-regarding-inspection","task_13":"Send report via email to key stakeholders","task_slug_13":"send-report-via-email-to-key-stakeholders","task_14":"Sources:","task_slug_14":"sources","task_15":"Related Checklists:","task_slug_15":"related-checklists","task_16":"","task_slug_16":"","task_17":"","task_slug_17":"","task_18":"","task_slug_18":"","task_19":"","task_slug_19":"","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[19,13],"tags":[],"class_list":["post-11719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-automotive","category-construction"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=11719"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11719\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media\/11720"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=11719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=11719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=11719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}