{"id":11722,"date":"2017-07-28T12:39:58","date_gmt":"2017-07-28T12:39:58","guid":{"rendered":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-hospitals-and-health-care\/"},"modified":"2024-02-28T20:11:29","modified_gmt":"2024-02-28T20:11:29","slug":"electrical-inspection-checklist-hospitals-and-health-care","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-hospitals-and-health-care\/","title":{"rendered":"Electrical Inspection Checklist: Hospitals and Health Care"},"content":{"rendered":"<section id=\"intro-to-hospitals-and-health-care\">\n<h2> Intro to Hospitals and Health Care: <\/h2>\n<div class=\"image-content\">\n<figure>\n   <a href=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/lgOf2IHAlMJD8rc6KpdHQw.png\" alt=\"Electrical Inspection Checklist: Hospitals and Health Care\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/lgOf2IHAlMJD8rc6KpdHQw.png\" \/> <\/a><figcaption>\n     Electrical Inspection Checklist: Hospitals and Health Care<br \/>\n   <\/figcaption><\/figure>\n<\/p><\/div>\n<div class=\"text-content\">\n<p>This Electrical Inspection Checklist: Hospitals and Health Care is engineered to provide<strong> an NEC compliant process<\/strong> to guide you in your safety inspections.<\/p>\n<p>The electrical systems of hospitals and other healthcare facilities have a greater degree of complexity than the standard residential or commercial setup. Within hospital and healthcare environments, it is vital that power remains constant and there is no risk of outages or other electrical problems.&nbsp;<\/p>\n<p>This checklist is geared to take you through a number of general electrical checks and provide a number of location specific elements to the process embedded in. Task 4 will be your opportunity to define the scope of your inspection so that you can make the most of this template.&nbsp;<\/p>\n<p><strong>This process is editable<\/strong> and you can add or remove steps as you please. Each inspection-specific task contains the relevant NEC section reference which applies to the action. It is recommended that you <strong>familiarize yourself with the standards before beginning any inspection<\/strong>.&nbsp;<\/p>\n<p>As you work through the checklist, you will encounter form fields where you can enter information and notes in relation to each task. The checklist will save each entry and the data can be accessed from the overview tab on the left-hand column of your template overview.&nbsp;<\/p>\n<p>You can also opt to print your checklist once you have completed the inspection. <strong>This will give you the option to save it as a PDF<\/strong> and act as an automatically generated report.&nbsp;<\/p>\n<p>You can also watch this video to give you a visual introduction.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"video-content\">\n<div class=\"iframe-container\">\n   <iframe src=\"https:\/\/www.youtube.com\/embed\/7GmBu_Zb5Uo?modestbranding=1&amp;showinfo=0\" frameborder=\"0\" allowfullscreen=\"true\"> <\/iframe>\n  <\/div>\n<div class=\"description\">\n    Healthcare Electrical Safety Inspections\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"record-inspection-details\">\n<h2> Record inspection details <\/h2>\n<div class=\"text-content\">\n<p>Use this section to record the key details of the inspection.<\/p>\n<p><strong>Enter your information into the form fields<\/strong> provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"text-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Inspector's name <\/label><br \/>\n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled=\"disabled\" class=\"form-control\" \/>\n  <\/div>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Location to be inspected <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Reason for inspection <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<div class=\"date-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Date of inspection <\/label> <\/p>\n<div class=\"date-container\">\n    <button type=\"button\" disabled=\"disabled\" class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button>\n   <\/div>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"text-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Site manager of location <\/label><br \/>\n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled=\"disabled\" class=\"form-control\" \/>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"run-general-inspection-safety-checklist\">\n<h2> Run general inspection safety checklist <\/h2>\n<div class=\"text-content\">\n<p>An electrical inspection is normally needed to ensure the safety of others. However, it is important to <strong>make sure that your own safety is not put at risk<\/strong> in performing the inspection.&nbsp;<\/p>\n<p>You can find here our checklist for making sure you are safe before performing your inspection<\/p>\n<p><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Electrical Inspection Checklist<\/a><\/p>\n<p>The first half of this checklist is designed to help you assess the area and risk in order to do your job safely and well.&nbsp;<\/p>\n<p>We recommend you <strong>run this checklist before starting any inspection<\/strong>.<\/p>\n<\/p><\/div>\n<\/section>\n<section id=\"determine-the-proper-classifications-for-areas-to-be-inspected\">\n<h2> Determine the proper classifications for areas to be inspected <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.1, 517.2&nbsp;<\/strong><\/p>\n<p>This checklist contains an overview section for healthcare facilities and includes further specialized sections including:<\/p>\n<ul>\n<li>Hospitals and Ambulatory Care Facilities with Critical Care Areas<\/li>\n<li>Nursing Homes and Limited Care Facilities<\/li>\n<li>Clinics, Medical, and Dental Offices<\/li>\n<li>Further Checks Applicable to All Health Care Facilities<\/li>\n<\/ul>\n<p>Assess your needs for the inspection and what areas you need to cover. Utilize the checklist accordingly.&nbsp;<\/p>\n<p><strong>You can use the form field below to record any notes.<\/strong>&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-correct-wiring-is-used-in-patient-care-spaces\">\n<h2> Make sure correct wiring is used in patient care spaces <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.13(A) and (B), 517.16<\/strong><\/p>\n<p>Make sure insulated copper conductors in metal raceways, or equivalent cables, <strong>are used<\/strong> to provide equipment grounding for branch circuits in patient care spaces.<\/p>\n<p>Also, check to ensure&nbsp;receptacles with an insulated grounding terminal (Type IG) <strong>are not used<\/strong>.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-for-bonding-between-panelboards\">\n<h2> Check for bonding between panelboards <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.14, 517.18, 527.19(D)<\/strong><\/p>\n<p>Check for the presence of bonding between normal and essential branch circuit wiring panel boards in places where any single patient care space is being served.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-each-patient-bed-location-has-two-or-more-branch-circuits\">\n<h2> Verify each patient bed location has two or more branch circuits <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.10(B)(2), 517.18(A)<\/strong><\/p>\n<p>For each general care space patient bed location, make sure there is:<\/p>\n<ul>\n<li>at least two branch circuits\n<ul>\n<li>one from the normal system<\/li>\n<li>one from the critical branch<\/li>\n<\/ul>\n<\/li>\n<\/ul><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-each-patient-bed-location-has-eight-or-more-receptacles\">\n<h2> Verify each patient bed location has eight or more receptacles <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.18(B), 517.30(E)&nbsp;<\/strong><\/p>\n<p>Make sure each general space area patient bed location has a minimum of 8 receptacles.<\/p>\n<p><strong>Leave your notes in the form field below<\/strong>.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-for-tamperresistant-coverings-in-pediatric-spaces\">\n<h2> Check for tamper-resistant coverings in pediatric spaces <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.18(B) and (C) <\/strong><\/p>\n<p>Children are naturally curious and don't understand the risks they may sometimes take. It is important that there are tamper-resistant coverings in place in the pediatric locations of general care spaces.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-each-critical-care-bed-has-two-or-more-branch-circuits\">\n<h2> Verify each critical care bed has two or more branch circuits <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.19(A), 517.30(E)<\/strong><\/p>\n<p>Make sure each critical care space patient bed location has:<\/p>\n<ul>\n<li>at least two branch circuits\n<ul>\n<li>one from the normal system<\/li>\n<li>one from the critical branch<\/li>\n<\/ul>\n<\/li>\n<\/ul><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-each-critical-care-bed-has-a-critical-branch-receptacle\">\n<h2> Verify each critical care bed has a critical branch receptacle <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.19(A)&nbsp;<\/strong><\/p>\n<p>Make sure each critical care space patient bed location has at least one receptacle which is supplied by a dedicated critical branch circuit.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-each-critical-care-bed-has-fourteen-or-more-receptacles\">\n<h2> Verify each critical care bed has fourteen or more receptacles <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.19(B)&nbsp;<\/strong><\/p>\n<p>Make sure that in total each critical care space patient bed location has a minimum of 14 receptacles.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-each-critical-care-bed-has-receptacle-connected-to-separate-source\">\n<h2> Verify each critical care bed has receptacle connected to separate source <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.19(B)&nbsp;<\/strong><\/p>\n<p>Make sure that a critical care space patient bed location has at least one receptacle which is connected to a branch circuit that is completely separate from the main branch circuit - this could be a normal or critical branch source.<\/p>\n<p><strong>Use the form field to record any notes.<\/strong><\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-there-are-36-receptacles-or-more-in-operating-rooms\">\n<h2> Make sure there are 36 receptacles or more in operating rooms <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.19(C)<\/strong><\/p>\n<p>Operating rooms are crucial areas where we need to be extra vigilant in ensuring standards are adhered to. Make sure there are at least 36 receptacles in each operating room.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-all-bed-location-receptacles-are-hospitalgrade\">\n<h2> Make sure all bed location receptacles are hospital-grade <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.18(B), 517.19(B)(2), 517.30(E)&nbsp;<\/strong><\/p>\n<p>As well as providing that all patient bed location receptacles are hospital-grade, you should also ensure that all critical branch receptacles have been identified.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-wet-procedure-locations-for-gfci-device-protection\">\n<h2> Check wet procedure locations for GFCI device protection <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.20, 517.21<\/strong><\/p>\n<p>Make sure all wet procedure locations are fitted with protection by GFCI devices. Alternatively, check for the use of isolated power systems where interruptions cannot be tolerated.&nbsp;<\/p>\n<p><strong>Leave your notes below<\/strong><\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"hospitals-and-ambulatory-care-facilities-with-critical-care-areas\">\n<h2> Hospitals and Ambulatory Care Facilities with Critical Care Areas: <\/h2>\n<\/section>\n<section id=\"review-the-essential-electrical-systems\">\n<h2> Review the essential electrical systems <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.30(B)(1)&nbsp;<\/strong><\/p>\n<p>Make sure that all of critical, life safety, and equipment branches have been adequately provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"review-load-calculations-for-the-essential-electrical-systems\">\n<h2> Review load calculations for the essential electrical systems <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.30(D)<\/strong><\/p>\n<p>On review of the load calculations for the essential electrical systems, provide that the capacity of the power sources and feeders are adequate.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-life-safety-and-critical-branches-are-wired-separately\">\n<h2> Verify life safety and critical branches are wired separately <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.30(C)(1)<\/strong><\/p>\n<p>Given their vital importance, make sure that the critical and life safety branches are wired separately from other wiring and equipment. These branches should be seen to be independent of the other systems.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-the-mechanical-protection-for-critical-branch-wiring\">\n<h2> Check the mechanical protection for critical branch wiring <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.30(C)(3)<\/strong><\/p>\n<p>Verify that the mechanical protection for critical branch wiring is provided by nonflexible metallic raceways or Type MI cable.<\/p>\n<p><strong>Use the form field below to record any notes.<\/strong><\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-the-independence-of-the-life-safety-branch\">\n<h2> Verify the independence of the life safety branch <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.32<\/strong><\/p>\n<p>Make sure that only loads intended to be supplied by the life safety branch are actually being supplied by the life safety branch. Ensuring its independence is vital in fulfilling its purpose.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-two-independent-sources-for-essential-electrical-system\">\n<h2> Make sure two independent sources for essential electrical system <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.35<\/strong><\/p>\n<p>Make sure the essential electrical system is being supplied by two independent sources. The secondary source which acts as the alternative should also be reviewed to judge its suitability.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"determine-the-coordination-of-the-overcurrent-devices\">\n<h2> Determine the coordination of the overcurrent devices <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.26 (700.28) 517.30(G)<\/strong><\/p>\n<p>Determine that the overcurrent protective devices of the life safety branch are selectively coordinated and that the overcurrent devices of the critical branch are coordinated to .01 seconds.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"nursing-homes-and-limited-care-facilities\">\n<h2> Nursing Homes and Limited Care Facilities: <\/h2>\n<\/section>\n<section id=\"review-the-essential-electrical-system\">\n<h2> Review the essential electrical system <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.41(A)&nbsp;<\/strong><\/p>\n<p>Review the essential electrical system and make sure that both the critical and life safety branches are provided and adequate.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"review-load-calculations-for-the-essential-electrical-system\">\n<h2> Review load calculations for the essential electrical system <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.41(C)&nbsp;<\/strong><\/p>\n<p>Review the load calculations as part of your assessment of the essential electrical system and determine whether or not the capacity of the power sources and feeders are adequate.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-that-the-life-safety-wiring-is-separate-from-other-wiring\">\n<h2> Verify that the life safety wiring is separate from other wiring <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.41(D)<\/strong><\/p>\n<p>Make sure that the life safety branch is independent of other branches and only those loads intended to be supplied by it are being supplied by it.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-the-essential-electrical-system-has-two-sources\">\n<h2> Make sure the essential electrical system has two sources <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.44<\/strong><\/p>\n<p>Make sure two independent sources are provided for the essential electrical system and that the alternative source is adequate for the task.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"clinics-medical-and-dental-offices\">\n<h2> Clinics, Medical, and Dental Offices: <\/h2>\n<\/section>\n<section id=\"check-an-essential-electrical-system-is-present-where-necessary\">\n<h2> Check an essential electrical system is present where necessary <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.45(B) and (C)<\/strong><\/p>\n<p>Make sure an essential electrical system is present and functioning where it is required.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-an-alternative-power-source-is-present\">\n<h2> Check an alternative power source is present <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.45(A) and (D)<\/strong><\/p>\n<p>Make sure an alternative power source is present and ensure that it has been specifically designed for the purpose.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"further-checks-applicable-to-all-health-care-facilities\">\n<h2> Further Checks Applicable to All Health Care Facilities: <\/h2>\n<\/section>\n<section id=\"determine-whether-hazardous-anesthetizing-locations-exist\">\n<h2> Determine whether hazardous anesthetizing locations exist <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.60<\/strong><\/p>\n<p>Determine whether hazardous (classified) anesthetizing locations exist in the facility.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-for-appropriate-wiring-in-hazardous-anesthetizing-locations\">\n<h2> Check for appropriate wiring in hazardous anesthetizing locations <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.61(A) and (B)&nbsp;<\/strong><\/p>\n<p>Make sure appropriate wiring and equipment have been used in locations in and above hazardous (classified) anesthetizing locations.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-power-circuits-in-flammable-locations-are-isolated\">\n<h2> Verify power circuits in flammable locations are isolated <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.63(F)<\/strong><\/p>\n<p>Make sure that power circuits in flammable&nbsp;anesthetizing locations are separate and isolated from other power systems.&nbsp;<\/p>\n<p><strong>Use the form field below to record any notes.&nbsp;<\/strong><\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-for-battery-powered-lights-in-anesthetizing-locations\">\n<h2> Check for battery powered lights in anesthetizing locations <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.63(A)<\/strong><\/p>\n<p>Make sure that there are battery powered lighting units available in anesthetizing locations and that the equipment is functional.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-the-supply-circuits-to-xray-equipment\">\n<h2> Check the supply circuits to X-ray equipment <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.71&nbsp;<\/strong><\/p>\n<p>Check that the supply circuits to x-ray equipment are adequate and have been wired appropriately.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-capacity-and-disconnecting-means-for-xray-equipment\">\n<h2> Check capacity and disconnecting means for X-ray equipment <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.72<\/strong><\/p>\n<p>Make sure that you check the capacity, location, and disconnecting means for x-ray equipment.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-supply-currents-to-xrays-meet-ampacity\">\n<h2> Verify supply currents to X-rays meet ampacity <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.73&nbsp;<\/strong><\/p>\n<p>Make sure that supply circuits for x-ray equipment are adequate and meet the minimum rating requirements for ampacity and overcurrent standards.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-enclosures-for-high-voltage-parts-are-grounded\">\n<h2> Make sure enclosures for high voltage parts are grounded <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.78<\/strong><\/p>\n<p>Make sure enclosures for high-voltage parts, and for noncurrent carrying metal parts, of X-ray equipment are safely grounded.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"make-sure-systems-in-patient-care-areas-have-proper-insulation\">\n<h2> Make sure systems in patient care areas have proper insulation <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.80<\/strong><\/p>\n<p>Make sure that low voltage systems within patient care areas have both insulation and isolation equivalent to their power distribution systems.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"check-isolated-power-systems-for-proper-installation\">\n<h2> Check isolated power systems for proper installation <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.160<\/strong><\/p>\n<p>Make sure that you check isolated power systems for:<\/p>\n<ul>\n<li>proper installation,<\/li>\n<li>features,<\/li>\n<li>and conductor information.<\/li>\n<\/ul>\n<p><strong>You can use the form field below to record your notes<\/strong>.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"verify-second-level-gfpe-where-applicable\">\n<h2> Verify second level GFPE where applicable <\/h2>\n<div class=\"text-content\">\n<p><strong>NEC:&nbsp;517.17<\/strong><\/p>\n<p>Verify second-level GFPE where applicable in hospitals and other health care facilities.<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Notes <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"write-down-overall-notes-regarding-inspection\">\n<h2> Write down overall notes regarding inspection <\/h2>\n<div class=\"text-content\">\n<p>If you have any other thoughts or <strong>comments which you would like to include in your report<\/strong>, leave them in the form field provided.&nbsp;<\/p>\n<\/p><\/div>\n<div class=\"textarea-field-content form-field-content\">\n<div class=\"form-group\">\n   <label> Comments on the inspection. <\/label><br \/>\n   <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled=\"disabled\" class=\"form-control\"><\/textarea>\n  <\/div>\n<\/p><\/div>\n<\/section>\n<section id=\"send-report-via-email-to-key-stakeholders\">\n<h2> Send report via email to key stakeholders <\/h2>\n<div class=\"text-content\">\n<p><strong>You can use the email widget<\/strong> to send a copy of your report to the key stakeholders.&nbsp;<\/p>\n<p>The information from your first task is being pulled into the body of the email through the use of&nbsp;<em>variables<\/em>. You can find more about <a href=\"https:\/\/www.process.st\/help\/docs\/variables\/\" rel=\"nofollow noopener\" target=\"_blank\">variables on our help site<\/a>.&nbsp;<\/p>\n<\/p><\/div>\n<\/section>\n<section id=\"sources\">\n<h2> Sources: <\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"http:\/\/samples.jbpub.com\/9781284041835\/Electrical_Inspection_Checklists.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Jones and Bartlett - Electrical Inspection Manual With Checklists, 2014<\/a><\/li>\n<li><a href=\"http:\/\/www.dot.ca.gov\/hq\/esc\/ttsb\/electrical\/pdf\/QA%20Inspection%20Guidelines.pdf\" rel=\"nofollow noopener\" target=\"_blank\">The State of California, Department of Transportation - Electrical QA Inspection Manual, 2015<\/a><\/li>\n<li><a href=\"http:\/\/www.sciencedirect.com\/science\/book\/9781856176545\" rel=\"nofollow noopener\" target=\"_blank\">Science Direct - Electrical Safety Code Manual, 2010<\/a><\/li>\n<li><a href=\"http:\/\/www.nfpa.org\/nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - NEC Overview<\/a>&nbsp;<\/li>\n<li><a href=\"http:\/\/www.nfpa.org\/nec\/about-the-nec\/changes-to-the-2017-nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - Changes to the 2017 NEC<\/a>&nbsp;<\/li>\n<\/ul><\/div>\n<\/section>\n<section id=\"related-checklists\">\n<h2> Related Checklists: <\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist\/\" rel=\"nofollow\">Electrical Inspection Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-motors-and-vehicles\" rel=\"nofollow\">Electrical Inspection Checklist: Motors and Vehicles<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-marinas-docks-and-boatyards\" rel=\"nofollow\">Electrical Inspection Checklist: Marinas, Docks, and Boatyards<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-electric-vehicle-charging-equipment\" rel=\"nofollow\">Electrical Inspection Checklist: Electric Vehicle Charging Equipment<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-agricultural-buildings\" rel=\"nofollow\">Electrical Inspection Checklist: Agricultural Buildings<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-hospitals-and-health-care\" rel=\"nofollow\">Electrical Inspection Checklist: Hospitals and Health Care<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-residential-rough-inspection-general\" rel=\"nofollow\">Electrical Inspection Checklist: Residential Rough Inspection General<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-air-conditioning-and-refrigerating\" rel=\"nofollow\">Electrical Inspection Checklist: Air-Conditioning and Refrigerating<\/a><\/li>\n<\/ul><\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Intro to Hospitals and Health Care: Electrical Inspection Checklist: Hospitals and Health Care This Electrical Inspection Checklist: Hospitals and Health Care is engineered to provide an NEC compliant process to guide you in your safety inspections. The electrical systems of hospitals and other healthcare facilities have a greater degree of complexity than the standard residential [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11723,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"","cover_icon_url":"","tasks_count":"48","template_description":"Run this Electrical Inspection Checklist: Hospitals and Health Care when you perform your on site inspection.","template_id":"pcPp8J-GQjx0Pzn49AFPow","task_0":"Intro to Hospitals and Health Care:","task_slug_0":"intro-to-hospitals-and-health-care","task_1":"Record inspection details","task_slug_1":"record-inspection-details","task_2":"Run general inspection safety checklist","task_slug_2":"run-general-inspection-safety-checklist","task_3":"Determine the proper classifications for areas to be inspected","task_slug_3":"determine-the-proper-classifications-for-areas-to-be-inspected","task_4":"Make sure correct wiring is used in patient care spaces","task_slug_4":"make-sure-correct-wiring-is-used-in-patient-care-spaces","task_5":"Check for bonding between panelboards","task_slug_5":"check-for-bonding-between-panelboards","task_6":"Verify each patient bed location has two or more branch circuits","task_slug_6":"verify-each-patient-bed-location-has-two-or-more-branch-circuits","task_7":"Verify each patient bed location has eight or more receptacles","task_slug_7":"verify-each-patient-bed-location-has-eight-or-more-receptacles","task_8":"Check for tamper-resistant coverings in pediatric spaces","task_slug_8":"check-for-tamperresistant-coverings-in-pediatric-spaces","task_9":"Verify each critical care bed has two or more branch circuits","task_slug_9":"verify-each-critical-care-bed-has-two-or-more-branch-circuits","task_10":"Verify each critical care bed has a critical branch receptacle","task_slug_10":"verify-each-critical-care-bed-has-a-critical-branch-receptacle","task_11":"Verify each critical care bed has fourteen or more receptacles","task_slug_11":"verify-each-critical-care-bed-has-fourteen-or-more-receptacles","task_12":"Verify each critical care bed has receptacle connected to separate source","task_slug_12":"verify-each-critical-care-bed-has-receptacle-connected-to-separate-source","task_13":"Make sure there are 36 receptacles or more in operating rooms","task_slug_13":"make-sure-there-are-36-receptacles-or-more-in-operating-rooms","task_14":"Make sure all bed location receptacles are hospital-grade","task_slug_14":"make-sure-all-bed-location-receptacles-are-hospitalgrade","task_15":"Check wet procedure locations for GFCI device protection","task_slug_15":"check-wet-procedure-locations-for-gfci-device-protection","task_16":"Hospitals and Ambulatory Care Facilities with Critical Care Areas:","task_slug_16":"hospitals-and-ambulatory-care-facilities-with-critical-care-areas","task_17":"Review the essential electrical systems","task_slug_17":"review-the-essential-electrical-systems","task_18":"Review load calculations for the essential electrical systems","task_slug_18":"review-load-calculations-for-the-essential-electrical-systems","task_19":"Verify life safety and critical branches are wired separately","task_slug_19":"verify-life-safety-and-critical-branches-are-wired-separately","task_20":"Check the mechanical protection for critical branch wiring","task_slug_20":"check-the-mechanical-protection-for-critical-branch-wiring","task_21":"Verify the independence of the life safety branch","task_slug_21":"verify-the-independence-of-the-life-safety-branch","task_22":"Make sure two independent sources for essential electrical system","task_slug_22":"make-sure-two-independent-sources-for-essential-electrical-system","task_23":"Determine the coordination of the overcurrent devices","task_slug_23":"determine-the-coordination-of-the-overcurrent-devices","task_24":"Nursing Homes and Limited Care Facilities:","task_slug_24":"nursing-homes-and-limited-care-facilities","task_25":"Review the essential electrical system","task_slug_25":"review-the-essential-electrical-system","task_26":"Review load calculations for the essential electrical system","task_slug_26":"review-load-calculations-for-the-essential-electrical-system","task_27":"Verify that the life safety wiring is separate from other wiring","task_slug_27":"verify-that-the-life-safety-wiring-is-separate-from-other-wiring","task_28":"Make sure the essential electrical system has two sources","task_slug_28":"make-sure-the-essential-electrical-system-has-two-sources","task_29":"Clinics, Medical, and Dental Offices:","task_slug_29":"clinics-medical-and-dental-offices","task_30":"Check an essential electrical system is present where necessary","task_slug_30":"check-an-essential-electrical-system-is-present-where-necessary","task_31":"Check an alternative power source is present","task_slug_31":"check-an-alternative-power-source-is-present","task_32":"Further Checks Applicable to All Health Care Facilities:","task_slug_32":"further-checks-applicable-to-all-health-care-facilities","task_33":"Determine whether hazardous anesthetizing locations exist","task_slug_33":"determine-whether-hazardous-anesthetizing-locations-exist","task_34":"Check for appropriate wiring in hazardous anesthetizing locations","task_slug_34":"check-for-appropriate-wiring-in-hazardous-anesthetizing-locations","task_35":"Verify power circuits in flammable locations are isolated","task_slug_35":"verify-power-circuits-in-flammable-locations-are-isolated","task_36":"Check for battery powered lights in anesthetizing locations","task_slug_36":"check-for-battery-powered-lights-in-anesthetizing-locations","task_37":"Check the supply circuits to X-ray equipment","task_slug_37":"check-the-supply-circuits-to-xray-equipment","task_38":"Check capacity and disconnecting means for X-ray equipment","task_slug_38":"check-capacity-and-disconnecting-means-for-xray-equipment","task_39":"Verify supply currents to X-rays meet ampacity","task_slug_39":"verify-supply-currents-to-xrays-meet-ampacity","task_40":"Make sure enclosures for high voltage parts are grounded","task_slug_40":"make-sure-enclosures-for-high-voltage-parts-are-grounded","task_41":"Make sure systems in patient care areas have proper insulation","task_slug_41":"make-sure-systems-in-patient-care-areas-have-proper-insulation","task_42":"Check isolated power systems for proper installation","task_slug_42":"check-isolated-power-systems-for-proper-installation","task_43":"Verify second level GFPE where applicable","task_slug_43":"verify-second-level-gfpe-where-applicable","task_44":"Write down overall notes regarding inspection","task_slug_44":"write-down-overall-notes-regarding-inspection","task_45":"Send report via email to key stakeholders","task_slug_45":"send-report-via-email-to-key-stakeholders","task_46":"Sources:","task_slug_46":"sources","task_47":"Related Checklists:","task_slug_47":"related-checklists","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[13],"tags":[],"class_list":["post-11722","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=11722"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11722\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media\/11723"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=11722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=11722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=11722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}