{"id":11731,"date":"2017-07-28T12:57:59","date_gmt":"2017-07-28T12:57:59","guid":{"rendered":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-residential-rough-inspection-general\/"},"modified":"2024-05-09T10:45:57","modified_gmt":"2024-05-09T10:45:57","slug":"electrical-inspection-checklist-residential-rough-inspection-general","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/electrical-inspection-checklist-residential-rough-inspection-general\/","title":{"rendered":"Electrical Inspection Checklist: Residential Rough Inspection General"},"content":{"rendered":"\n<section id=\"intro-to-residential-rough-inspection-general\">\n <h2>Intro to Residential Rough Inspection General:<\/h2>\n <div class=\"image-content\">\n  <figure>\n   <a href=\"https:\/\/ps-attachments.s3.amazonaws.com\/e9e5506f-48b0-4fdc-afb3-d1be75336e8e\/g1A-PbhvYZyvp1M3grNIcg.png\" alt=\"Intro to Residential Rough Inspection General:\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ps-attachments.s3.amazonaws.com\/e9e5506f-48b0-4fdc-afb3-d1be75336e8e\/g1A-PbhvYZyvp1M3grNIcg.png\"> <\/a><!-- No caption -->\n  <\/figure>\n <\/div>\n <div class=\"text-content\">\n  <p>This Electrical Inspection Checklist: Residential Rough Inspection General&nbsp;is engineered to provide<strong> an NEC compliant process<\/strong> to guide you in your safety inspections.<\/p>\n  <p>As a result of its frequent use, the residential home constitutes one of the more dangerous electrical locations. The sheer number of residential houses mean that fires or other problems resulting from poor wiring practices and other electrical faults pose a serious danger to the public.&nbsp;<\/p>\n  <p>The purpose of the residential rough inspection general is to begin to identify the key areas which require checking, and to make sure <strong>all electrical systems adhere to appropriate standards.<\/strong>&nbsp;<\/p>\n  <p><strong>This process is editable<\/strong> and you can add or remove steps as you please. Each inspection-specific task contains the relevant NEC section reference which applies to the action. It is recommended that you <strong>familiarize yourself with the standards before beginning any inspection<\/strong>.&nbsp;<\/p>\n  <p>As you work through the checklist, you will encounter form fields where you can enter information and notes in relation to each task. The checklist will save each entry and the data can be accessed from the overview tab on the left-hand column of your template overview.&nbsp;<\/p>\n  <p>You can also opt to print your checklist once you have completed the inspection. <strong>This will give you the option to save it as a PDF<\/strong> and act as an automatically generated report.&nbsp;<\/p>\n  <p><strong>You can watch the video below<\/strong> for an introduction into the residential electrical inspection process.&nbsp;<\/p>\n <\/div>\n <div class=\"video-content\">\n  <div class=\"iframe-container\">\n   <iframe src=\"https:\/\/www.youtube.com\/embed\/BoV2A5pI89A?modestbranding=1&amp;showinfo=0\" frameborder=\"0\" allowfullscreen=\"true\"> <\/iframe>\n  <\/div>\n  <div class=\"description\">\n   Electrical Residential Inspection - BDSOutreach\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"record-inspection-details\">\n <h2>Record inspection details<\/h2>\n <div class=\"text-content\">\n  <p>Use this section to record the key details of the inspection.<\/p>\n  <p><strong>Enter your information into the form fields<\/strong> provided.&nbsp;<\/p>\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Inspector's name <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Location to be inspected <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Reason for inspection <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n <div class=\"date-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Date of inspection <\/label>\n   <div class=\"date-container\">\n    <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button>\n   <\/div>\n  <\/div>\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Site manager of location <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"run-general-inspection-safety-checklist\">\n <h2>Run general inspection safety checklist<\/h2>\n <div class=\"text-content\">\n  <p>An electrical inspection is normally needed to ensure the safety of others. However, it is important to <strong>make sure that your own safety is not put at risk<\/strong> in performing the inspection.&nbsp;<\/p>\n  <p>You can find here our checklist for making sure you are safe before performing your inspection<\/p>\n  <p><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Electrical Inspection Checklist<\/a><\/p>\n  <p>The first half of this checklist is designed to help you assess the area and risk in order to do your job safely and well.&nbsp;<\/p>\n  <p>We recommend you <strong>run this checklist before starting any inspection<\/strong>.<\/p>\n <\/div>\n<\/section>\n<section id=\"check-wiring-methods-for-support-and-suitability\">\n <h2>Check wiring methods for support and suitability<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;3, 7, and 8, Art 334, 314.17<\/strong><\/p>\n  <p>Make sure all wiring methods and cable assemblies are suitable for the residential conditions.&nbsp;<\/p>\n  <p><strong>Use the form field below<\/strong> to record your notes.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"check-cable-installation-for-clearance-or-protective-plates\">\n <h2>Check cable installation for clearance or protective plates<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;300.4&nbsp;<\/strong><\/p>\n  <p>Check all cable installation in relation to framing members and furring strips. You should check all cables which run either through or parallel to the framing members and furring strips. There should be, at all times, <strong>either&nbsp;1\u00bc-in. (32-mm) clearance or the presence of protective steel plates<\/strong> to ensure safety requirements are met.&nbsp;<\/p>\n  <p><strong>Record your notes in the form field provided.<\/strong><\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"make-sure-the-boxes-are-suitable-for-use\">\n <h2>Make sure the boxes are suitable for use<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;314.15, 314.27&nbsp;<\/strong><\/p>\n  <p>Check the boxes for their suitability.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"verify-that-boxes-are-installed-in-necessary-locations\">\n <h2>Verify that boxes are installed in necessary locations<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;300.15, 314.29<\/strong><\/p>\n  <p>Boxes should be provided in accessible locations. Boxes should be present for all:<\/p>\n  <ul>\n   <li>junctions,<\/li>\n   <li>outlets,<\/li>\n   <li>and pull points.<\/li>\n  <\/ul>\n  <p><strong>Record any notes in the form field below<\/strong>.<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"confirm-cables-are-safely-secured-to-boxes\">\n <h2>Confirm cables are safely secured to boxes<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;314.17(B) and (C)&nbsp;<\/strong><\/p>\n  <p>All cables should be firmly secured to their boxes.&nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"check-boxes-for-conductor-fill\">\n <h2>Check boxes for conductor fill<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;314.16&nbsp;<\/strong><\/p>\n  <p>Check the boxes for the appropriate conductor fill.&nbsp;<\/p>\n  <p>You can find more supporting information on box conductor fill from <a href=\"http:\/\/www.ecmweb.com\/code-basics\/box-fill-calculations\" rel=\"nofollow noopener\" target=\"_blank\">ECMWeb<\/a>.<\/p>\n  <p><strong>Leave any notes in the form field below.&nbsp;<\/strong><\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"inspect-the-positioning-of-boxes-intended-to-be-flush\">\n <h2>Inspect the positioning of boxes intended to be flush<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;314.20&nbsp;<\/strong><\/p>\n  <p>Check the positioning of the boxes which are intended to be flush. You should check the relationship between the box and <strong>both combustible and noncombustible finished surfaces.&nbsp;<\/strong><\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"verify-the-presence-of-key-splicing-devices\">\n <h2>Verify the presence of key splicing devices<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;250.8, 250.86, 250.146, 250.148&nbsp;<\/strong><\/p>\n  <p>Check for the presence of key splicing devices in all relevant locations.&nbsp;<\/p>\n  <p>These include:<\/p>\n  <ul>\n   <li>equipment grounding conductors within boxes,&nbsp;<\/li>\n   <li>and bonding connections to other metal boxes<\/li>\n  <\/ul>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"check-equipment-grounding-conductors\">\n <h2>Check equipment grounding conductors<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;250.118, 250.122&nbsp;<\/strong><\/p>\n  <p>Check the equipment grounding conductors for both suitability to the requirements, size, and condition.<\/p>\n  <p><strong>Record your notes in the form field provided<\/strong>. &nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"inspect-boxes-in-floors-or-ceiling-fans-for-listing\">\n <h2>Inspect boxes in floors or ceiling fans for listing<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;314.27(B) and (C)<\/strong><\/p>\n  <p>With both boxes in floors and with ceiling fans, it is important to check for obvious and hidden signs of listing.&nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"check-recessed-luminaires-are-clear-of-combustibles\">\n <h2>Check recessed luminaires are clear of combustibles<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;410.116(A)(1), 410.116(B)<\/strong><\/p>\n  <p>Check recessed luminaires have adequate clearance from both combustibles and any present insulation.&nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"inspect-cables-installed-in-contact-with-thermal-installation\">\n <h2>Inspect cables installed in contact with thermal installation<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;334.80, 310.15(B)(2) (a)<\/strong><\/p>\n  <p>Some cables will be in positions where there is not adequate chance of achieving clearance. This could be in areas where there is insulation or stoppers for fire or drafts. Wiring in these conditions must be checked for possible adjustment factors.<\/p>\n  <p><strong>Leave any notes in the form field provided.<\/strong> &nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"make-sure-wall-switch-locations-have-grounded-conductors\">\n <h2>Make sure wall switch locations have grounded conductors<\/h2>\n <div class=\"text-content\">\n  <p><strong>NEC:&nbsp;404.2(C)<\/strong><\/p>\n  <p>Inspect the wall switch locations and identify the presence of grounded conductors.&nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Notes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"write-down-overall-notes-regarding-inspection\">\n <h2>Write down overall notes regarding inspection<\/h2>\n <div class=\"text-content\">\n  <p>If you have any other thoughts or <strong>comments which you would like to include in your report<\/strong>, leave them in the form field provided.&nbsp;<\/p>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Comments on the inspection. <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"send-report-via-email-to-key-stakeholders\">\n <h2>Send report via email to key stakeholders<\/h2>\n <div class=\"text-content\">\n  <p><strong>You can use the email widget<\/strong> to send a copy of your report to the key stakeholders.&nbsp;<\/p>\n  <p>The information from your first task is being pulled into the body of the email through the use of&nbsp;<em>variables<\/em>. You can find more about <a href=\"https:\/\/www.process.st\/help\/docs\/variables\/\" rel=\"nofollow noopener\" target=\"_blank\">variables on our help site<\/a>.&nbsp;<\/p>\n <\/div>\n<\/section>\n<section id=\"sources\">\n <h2>Sources:<\/h2>\n <div class=\"text-content\">\n  <ul>\n   <li><a href=\"http:\/\/samples.jbpub.com\/9781284041835\/Electrical_Inspection_Checklists.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Jones and Bartlett - Electrical Inspection Manual With Checklists, 2014<\/a><\/li>\n   <li><a href=\"http:\/\/www.dot.ca.gov\/hq\/esc\/ttsb\/electrical\/pdf\/QA%20Inspection%20Guidelines.pdf\" rel=\"nofollow noopener\" target=\"_blank\">The State of California, Department of Transportation - Electrical QA Inspection Manual, 2015<\/a><\/li>\n   <li><a href=\"http:\/\/www.sciencedirect.com\/science\/book\/9781856176545\" rel=\"nofollow noopener\" target=\"_blank\">Science Direct - Electrical Safety Code Manual, 2010<\/a><\/li>\n   <li><a href=\"http:\/\/www.nfpa.org\/nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - NEC Overview<\/a>&nbsp;<\/li>\n   <li><a href=\"http:\/\/www.nfpa.org\/nec\/about-the-nec\/changes-to-the-2017-nec\" rel=\"nofollow noopener\" target=\"_blank\">NFPA - Changes to the 2017 NEC<\/a>&nbsp;<\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"related-checklists\">\n <h2>Related Checklists:<\/h2>\n <div class=\"text-content\">\n  <ul>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist\/\" rel=\"nofollow\">Electrical Inspection Checklist<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-motors-and-vehicles\" rel=\"nofollow\">Electrical Inspection Checklist: Motors and Vehicles<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-marinas-docks-and-boatyards\" rel=\"nofollow\">Electrical Inspection Checklist: Marinas, Docks, and Boatyards<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-electric-vehicle-charging-equipment\" rel=\"nofollow\">Electrical Inspection Checklist: Electric Vehicle Charging Equipment<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-agricultural-buildings\" rel=\"nofollow\">Electrical Inspection Checklist: Agricultural Buildings<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-hospitals-and-health-care\" rel=\"nofollow\">Electrical Inspection Checklist: Hospitals and Health Care<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-residential-rough-inspection-general\" rel=\"nofollow\">Electrical Inspection Checklist: Residential Rough Inspection General<\/a><\/li>\n   <li><a href=\"http:\/\/process.st\/checklist\/electrical-inspection-checklist-air-conditioning-and-refrigerating\" rel=\"nofollow\">Electrical Inspection Checklist: Air-Conditioning and Refrigerating<\/a><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Intro to Residential Rough Inspection General: This Electrical Inspection Checklist: Residential Rough Inspection General&nbsp;is engineered to provide an NEC compliant process to guide you in your safety inspections. As a result of its frequent use, the residential home constitutes one of the more dangerous electrical locations. The sheer number of residential houses mean that fires [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":11732,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"","cover_icon_url":"","tasks_count":"20","template_description":"Run this Electrical Inspection Checklist: Residential Rough Inspection General when you perform your on site inspection.","template_id":"uX-q587AH9bNXkJ_GHxKwg","task_0":"Intro to Residential Rough Inspection General:","task_slug_0":"intro-to-residential-rough-inspection-general","task_1":"Record inspection details","task_slug_1":"record-inspection-details","task_2":"Run general inspection safety checklist","task_slug_2":"run-general-inspection-safety-checklist","task_3":"Check wiring methods for support and suitability","task_slug_3":"check-wiring-methods-for-support-and-suitability","task_4":"Check cable installation for clearance or protective plates","task_slug_4":"check-cable-installation-for-clearance-or-protective-plates","task_5":"Make sure the boxes are suitable for use","task_slug_5":"make-sure-the-boxes-are-suitable-for-use","task_6":"Verify that boxes are installed in necessary locations","task_slug_6":"verify-that-boxes-are-installed-in-necessary-locations","task_7":"Confirm cables are safely secured to boxes","task_slug_7":"confirm-cables-are-safely-secured-to-boxes","task_8":"Check boxes for conductor fill","task_slug_8":"check-boxes-for-conductor-fill","task_9":"Inspect the positioning of boxes intended to be flush","task_slug_9":"inspect-the-positioning-of-boxes-intended-to-be-flush","task_10":"Verify the presence of key splicing devices","task_slug_10":"verify-the-presence-of-key-splicing-devices","task_11":"Check equipment grounding conductors","task_slug_11":"check-equipment-grounding-conductors","task_12":"Inspect boxes in floors or ceiling fans for listing","task_slug_12":"inspect-boxes-in-floors-or-ceiling-fans-for-listing","task_13":"Check recessed luminaires are clear of combustibles","task_slug_13":"check-recessed-luminaires-are-clear-of-combustibles","task_14":"Inspect cables installed in contact with thermal installation","task_slug_14":"inspect-cables-installed-in-contact-with-thermal-installation","task_15":"Make sure wall switch locations have grounded conductors","task_slug_15":"make-sure-wall-switch-locations-have-grounded-conductors","task_16":"Write down overall notes regarding inspection","task_slug_16":"write-down-overall-notes-regarding-inspection","task_17":"Send report via email to key stakeholders","task_slug_17":"send-report-via-email-to-key-stakeholders","task_18":"Sources:","task_slug_18":"sources","task_19":"Related Checklists:","task_slug_19":"related-checklists","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[13,5,14],"tags":[],"class_list":["post-11731","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-featured","category-real-estate"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11731","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=11731"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/11731\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media\/11732"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=11731"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=11731"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=11731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}