{"id":23868,"date":"2020-07-30T13:21:04","date_gmt":"2020-07-30T13:21:04","guid":{"rendered":"https:\/\/www.process.st\/templates\/work-breakdown-structure-template\/"},"modified":"2024-02-29T02:34:49","modified_gmt":"2024-02-29T02:34:49","slug":"work-breakdown-structure-template","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/work-breakdown-structure-template\/","title":{"rendered":"Work Breakdown Structure Template"},"content":{"rendered":"<section id=\"how-to-use-the-work-breakdown-structure-template\">\n<h2>How to use the Work Breakdown Structure Template:<\/h2>\n<div class=\"image-content\">\n<figure> <a href=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/lqfpqWqDYUYVo7OARAVPvA.png\" alt=\"Work Breakdown Structure Template\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/www.process.st\/templates\/wp-content\/uploads\/2024\/02\/lqfpqWqDYUYVo7OARAVPvA.png\"> <\/a><figcaption>\n     Work Breakdown Structure Template<br \/>\n<\/figcaption><\/figure>\n<\/div>\n<div class=\"text-content\">\n<h5>What is this Work Breakdown Structure Template for?<\/h5>\n<p>This <a href=\"https:\/\/www.process.st\/help\/docs\/what-is-the-difference-between-templates-and-checklists\/\" rel=\"nofollow noopener\" target=\"_blank\">template<\/a> assists you in creating a work breakdown structure for a project.<\/p>\n<p>By using and following this template not only will you generate a key deliverable, but you'll also map out the entire scope of a project and break it all down into manageable chunks of work.<\/p>\n<p>It's advised to read the post <em><a href=\"https:\/\/www.process.st\/work-breakdown-structure\/\" rel=\"nofollow noopener\" target=\"_blank\">Work Breakdown Structure: How to Cut Stress &amp; Save Time on Important Projects (Free Template!)<\/a>&nbsp;<\/em>before you use the template.<\/p>\n<h5>Who should use this template and when?<\/h5>\n<p>The project leader should use this template (although they may need a helping hand from others).<\/p>\n<p>A <a href=\"https:\/\/www.process.st\/templates\/work-breakdown-structure-template\/\" rel=\"nofollow noopener\" target=\"_blank\">pristine version of this template<\/a> should be added to your account when you're planning each and every project, and then used and edited to fully break a project down.<\/p>\n<h5>How is the Work Breakdown Structure Template used?<\/h5>\n<p><strong><a href=\"https:\/\/www.process.st\/sign-up\/\" rel=\"nofollow noopener\" target=\"_blank\">Sign up<\/a> and a<\/strong><strong>dd<\/strong><strong> a pristine version of this template<\/strong> to your account in <a href=\"https:\/\/www.process.st\" rel=\"nofollow noopener\" target=\"_blank\">Process Street<\/a>. You'll then need to replace the text inside the brackets in the left-hand menu appropriately.<\/p>\n<p>For instance, \"1 [WBS level 1]\" will become \"1 Aircraft System\" if the project is building an entire aircraft system. \"1.1 [WBS level 2]\" would become \"1.1 Aircraft Vehicle\" as it's one of the fundamental components of building an aircraft system. \"1.1.1 [WBS level 3]\" would become \"1.1.1 Airframe\", \"1.1.2 [WBS level 3] would be \"1.1.2 Propulsion\", and \"1.1.3 [WBS level 3]\" would be \"1.1.3 Application Software\", and so on, as they're all necessary parts of creating the aircraft vehicle component.<\/p>\n<p>To put it simply: level 1 refers to the overall project, level 2 concerns the major components of the project, and level 3 is what makes up each major component.<\/p>\n<p>Process Street's template has been built as exactly that \u2014 a template. If you need to add extra level 2, 3, or even 4 boxes to the left-hand menu, go ahead and do so. Similarly, if you need to remove any, all you need to do is click \"<a href=\"https:\/\/www.process.st\/help\/docs\/editing-templates\/\" rel=\"nofollow noopener\" target=\"_blank\">Edit this template<\/a>\".<\/p>\n<p>Simple.<\/p>\n<h5>What should happen after the work breakdown structure has been created?<\/h5>\n<p>Once you've replaced the text in the left-hand menu and you've mapped out all levels of the project in question, you've created a work breakdown structure.<\/p>\n<p>You can send it to higher-ups for review, employees involved with the project can use it as reference material, or you can even ask a designer to turn the text-based work breakdown structure into a graphic diagram, too. How you use your completed work breakdown structure is down to you, basically.<\/p>\n<p>What's most important is breaking down a project and the work involved in the first place, as explained in the post <a href=\"https:\/\/www.process.st\/work-breakdown-structure\/\" rel=\"nofollow noopener\" target=\"_blank\"><em>Work Breakdown Structure: How to Cut Stress &amp; Save Time on Important Projects (Free Template!)<\/em><\/a>.<\/p>\n<p>However, after creating the work breakdown structure, you'll want to make sure that all the necessary and related processes and procedures are documented in state-of-the-art <a href=\"https:\/\/www.process.st\/business-process-management-software\" rel=\"nofollow noopener\" target=\"_blank\">BPM software<\/a> like Process Street. By doing so, you'll ensure tasks are completed to a high degree and without <a href=\"https:\/\/www.process.st\/human-error\/\" rel=\"nofollow noopener\" target=\"_blank\">human error<\/a>.&nbsp;<\/p>\n<p>Plus, you'll be able to make use of Process Street's <a href=\"https:\/\/www.process.st\/workflow-automation\/\" rel=\"nofollow noopener\" target=\"_blank\">workflow automation<\/a> features, such as:<\/p>\n<ul>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/stop-tasks\/\" rel=\"nofollow noopener\" target=\"_blank\">Stop tasks<\/a> \u270b<\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/conditional-logic\/\" rel=\"nofollow noopener\" target=\"_blank\">Conditional logic<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/dynamic-due-dates\/\" rel=\"nofollow noopener\" target=\"_blank\">Dynamic due dates<\/a> \u23f1<\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/task-permissions\/\" rel=\"nofollow noopener\" target=\"_blank\">Task permissions<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/task-assignments\/\" rel=\"nofollow noopener\" target=\"_blank\">Task assignments<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/role-assignments\/\" rel=\"nofollow noopener\" target=\"_blank\">Role assignments<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/embed-widget\/\" rel=\"nofollow noopener\" target=\"_blank\">Embed widget<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/help\/docs\/webhooks\/\" rel=\"nofollow noopener\" target=\"_blank\">Webhooks<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/approvals\/\" rel=\"nofollow noopener\" target=\"_blank\">Approvals<\/a> \u2705<\/li>\n<li><a href=\"https:\/\/www.process.st\/pricing\/\" rel=\"nofollow noopener\" target=\"_blank\">And more!<\/a><\/li>\n<\/ul>\n<p>Fully utilizing Process Street will make completing the project much quicker and far easier.<\/p>\n<h5>How can the work breakdown structure become superpowered?<\/h5>\n<p>A work breakdown structure will be created if all you do is break down the project into separate, manageable sections via the left-hand menu.<\/p>\n<p>But if you want to superpower it, here's how.<\/p>\n<p>By clicking on \"1 [WBS level 1]\" (or whatever you rename it to), you'll find instructions to provide information on the project. If you're building an entire aircraft system, here's where you'll add context and essential info.<\/p>\n<p>For the level 2s you'll, again, see instructions to write down additional information.<\/p>\n<p>For the level 3s, though, you can not only add information but also provide links to the relevant <a href=\"https:\/\/www.process.st\/business-process-documentation\/\" rel=\"nofollow noopener\" target=\"_blank\">documented processes and procedures<\/a> in Process Street. This is so people can directly go to and follow those processes and procedures!<\/p>\n<p>Although not essential, it makes the lives of those who're involved with the project a little easier.<\/p>\n<p>What're you waiting for?<\/p>\n<p>It's time to cut stress and save time by creating a work breakdown structure for your project!<\/p>\n<\/div>\n<\/section>\n<section id=\"1-wbs-level-1\">\n<h2>1 [WBS level 1]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 1] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<\/div>\n<\/section>\n<section id=\"11-wbs-level-2\">\n<h2>1.1 [WBS level 2]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 2] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<\/div>\n<\/section>\n<section id=\"111-wbs-level-3\">\n<h2>1.1.1 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<em>&nbsp;<\/em><\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"112-wbs-level-3\">\n<h2>1.1.2 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"113-wbs-level-3\">\n<h2>1.1.3 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"114-wbs-level-3\">\n<h2>1.1.4 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"115-wbs-level-3\">\n<h2>1.1.5 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"12-wbs-level-2\">\n<h2>1.2 [WBS level 2]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 2] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<\/div>\n<\/section>\n<section id=\"121-wbs-level-3\">\n<h2>1.2.1 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"122-wbs-level-3\">\n<h2>1.2.2 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"123-wbs-level-3\">\n<h2>1.2.3 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"124-wbs-level-3\">\n<h2>1.2.4 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"125-wbs-level-3\">\n<h2>1.2.5 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"13-wbs-level-2\">\n<h2>1.3 [WBS level 2]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 2] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<\/div>\n<\/section>\n<section id=\"131-wbs-level-3\">\n<h2>1.3.1 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"132-wbs-level-3\">\n<h2>1.3.2 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"133-wbs-level-3\">\n<h2>1.3.3 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"134-wbs-level-3\">\n<h2>1.3.4 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"135-wbs-level-3\">\n<h2>1.3.5 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"14-wbs-level-2\">\n<h2>1.4 [WBS level 2]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 2] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"141-wbs-level-3\">\n<h2>1.4.1 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"142-wbs-level-3\">\n<h2>1.4.2 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"143-wbs-level-3\">\n<h2>1.4.3 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"144-wbs-level-3\">\n<h2>1.4.4 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"145-wbs-level-3\">\n<h2>1.4.5 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"15-wbs-level-2\">\n<h2>1.5 [WBS level 2]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 2] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"151-wbs-level-3\">\n<h2>1.5.1 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"152-wbs-level-3\">\n<h2>1.5.2 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"153-wbs-level-3\">\n<h2>1.5.3 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"154-wbs-level-3\">\n<h2>1.5.4 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"155-wbs-level-3\">\n<h2>1.5.5 [WBS level 3]<\/h2>\n<div class=\"text-content\">\n<h3>[WBS level 3] information:<\/h3>\n<p><em><strong>[Edit this template<\/strong> to change the text.]<\/em>&nbsp;<\/p>\n<h3>Relevant processes and procedures:<\/h3>\n<p><em>[<strong>Add links<\/strong> to the relevant processes and procedures documented inside Process Street.]<\/em><\/p>\n<\/div>\n<\/section>\n<section id=\"sources\">\n<h2>Sources:<\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"https:\/\/twitter.com\/thomjamescarter\" rel=\"nofollow noopener\" target=\"_blank\">Thom James Carter<\/a> -&nbsp;<em><a href=\"https:\/\/www.process.st\/work-breakdown-structure\/\" rel=\"nofollow noopener\" target=\"_blank\">Work Breakdown Structure: How to Make Major Projects More Manageable (Free Template!)<\/a><\/em><em><\/em><\/li>\n<li><a href=\"https:\/\/twitter.com\/ben__mulholland\" rel=\"nofollow noopener\" target=\"_blank\">Ben Mulholland<\/a> -&nbsp;<em><a href=\"https:\/\/www.process.st\/human-error\/\" rel=\"nofollow noopener\" target=\"_blank\">Human Error: How to Prevent Your Team From Self-Sabotaging<\/a><\/em><\/li>\n<li><a href=\"https:\/\/www.process.st\/author\/jane\/\" rel=\"nofollow noopener\" target=\"_blank\">Jane Courtnell<\/a> - <em><a href=\"https:\/\/www.process.st\/business-process-documentation\/\" rel=\"nofollow noopener\" target=\"_blank\">Business Process Documentation: 5 Benefits and Why You Should Use It<\/a><\/em><\/li>\n<li><a href=\"https:\/\/en.wikipedia.org\/wiki\/Work_breakdown_structure\" rel=\"nofollow noopener\" target=\"_blank\">Wikipedia<\/a> - <a href=\"https:\/\/en.wikipedia.org\/wiki\/Work_breakdown_structure\" rel=\"nofollow noopener\" target=\"_blank\">Work breakdown structure<\/a><\/li>\n<li><a href=\"https:\/\/www.linkedin.com\/in\/esther-cohen-0b2a51146\/?challengeId=AQFqS417mva18AAAAXNsB3R0WNACdH9DbHjAsq6ETJfUXkxXYV09uVyoeeXAxlMSFPIYE4k5TWX-SuIriu64RP6zhR0vaVTluQ&amp;submissionId=4b2bf99c-2473-2316-c730-71180fcdf317\" rel=\"nofollow noopener\" target=\"_blank\">Esther Cohen<\/a> - <a href=\"https:\/\/www.workamajig.com\/blog\/guide-to-work-breakdown-structures-wbs\" rel=\"nofollow noopener\" target=\"_blank\"><em>What is WBS (Work Breakdown Structure) in Project Management?<\/em><\/a><\/li>\n<li><a href=\"https:\/\/www.linkedin.com\/in\/eric-s-norman\" rel=\"nofollow noopener\" target=\"_blank\">Eric S. Norman<\/a> <em>- <\/em><a href=\"https:\/\/www.pmi.org\/learning\/library\/applying-work-breakdown-structure-project-lifecycle-6979\" rel=\"nofollow noopener\" target=\"_blank\"><em>Applying the work breakdown structure to the project management lifecycle<\/em><\/a><em><\/em><\/li>\n<\/ul>\n<\/div>\n<\/section>\n<section id=\"related-checklists\">\n<h2>Related checklists:<\/h2>\n<div class=\"text-content\">\n<ul>\n<li><a href=\"https:\/\/www.process.st\/templates\/project-proposal-template-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Project Proposal Template Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/financial-management-for-new-projects\/\" rel=\"nofollow noopener\" target=\"_blank\">Financial Management for New Projects<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/project-management-process\/\" rel=\"nofollow noopener\" target=\"_blank\">Project Management Process<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/project-report-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Project Report Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/business-requirements-template\/\" rel=\"nofollow noopener\" target=\"_blank\">Business Requirements Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/sipoc-template\/\" rel=\"nofollow noopener\" target=\"_blank\">SIPOC Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/standard-operating-procedure-sop-template-structure\/\" rel=\"nofollow noopener\" target=\"_blank\">Standard Operating Procedures (SOP) Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/hazop-process\/\" rel=\"nofollow noopener\" target=\"_blank\">HAZOP Process checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/lewins-change-management-model-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Lewin\u2019s Change Management Model<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/bridges-transition-model-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Bridges Transition Model Process Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/adkar-model-change-management-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">ADKAR Model Change Management Process Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/mckinsey-7-s-model-checklist-process\/\" rel=\"nofollow noopener\" target=\"_blank\">McKinsey 7-S Model Process Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/kotters-change-management-model-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Kotter\u2019s Change Management Model Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/kubler-ross-change-curve-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Kubler Ross Change Curve Change Management Model<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/nudge-theory-change-management-model-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Nudge Theory Change Management Model Process<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/pdca-cycle-change-management-model-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">PDCA Change Management Model Process Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/satir-change-management-model-process-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Satir Change Management Model Process Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/5-whys-template\/\" rel=\"nofollow noopener\" target=\"_blank\">5 Whys Checklist Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/vrio-analysis\/\" rel=\"nofollow noopener\" target=\"_blank\">VRIO Analysis Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/risk-management-process\" rel=\"nofollow noopener\" target=\"_blank\">Risk Management Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/swot-analysis-template\/\" rel=\"nofollow noopener\" target=\"_blank\">SWOT Analysis Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/fmea-template-failure-mode-and-effects-analysis\/\" rel=\"nofollow noopener\" target=\"_blank\">FMEA Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/standard-operating-procedure-sop-template-structure\/\" rel=\"nofollow noopener\" target=\"_blank\">Standard Operating Procedure (SOP) Template<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/records-disposal-checklist\/\" rel=\"nofollow noopener\" target=\"_blank\">Records Disposal Checklist<\/a><\/li>\n<li><a href=\"https:\/\/www.process.st\/templates\/process-library\/\" rel=\"nofollow noopener\" target=\"_blank\">Process Library Checklist<\/a><\/li>\n<\/ul>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>How to use the Work Breakdown Structure Template: Work Breakdown Structure Template What is this Work Breakdown Structure Template for? This template assists you in creating a work breakdown structure for a project. By using and following this template not only will you generate a key deliverable, but you'll also map out the entire scope [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":23869,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"","cover_icon_url":"","tasks_count":"34","template_description":"Use this template to create a work breakdown structure and divide a project into manageable chunks.","template_id":"vxggDYfoh8UcKHhU0LlIIQ","task_0":"How to use the Work Breakdown Structure Template:","task_slug_0":"how-to-use-the-work-breakdown-structure-template","task_1":"1 [WBS level 1]","task_slug_1":"1-wbs-level-1","task_2":"1.1 [WBS level 2]","task_slug_2":"11-wbs-level-2","task_3":"1.1.1 [WBS level 3]","task_slug_3":"111-wbs-level-3","task_4":"1.1.2 [WBS level 3]","task_slug_4":"112-wbs-level-3","task_5":"1.1.3 [WBS level 3]","task_slug_5":"113-wbs-level-3","task_6":"1.1.4 [WBS level 3]","task_slug_6":"114-wbs-level-3","task_7":"1.1.5 [WBS level 3]","task_slug_7":"115-wbs-level-3","task_8":"1.2 [WBS level 2]","task_slug_8":"12-wbs-level-2","task_9":"1.2.1 [WBS level 3]","task_slug_9":"121-wbs-level-3","task_10":"1.2.2 [WBS level 3]","task_slug_10":"122-wbs-level-3","task_11":"1.2.3 [WBS level 3]","task_slug_11":"123-wbs-level-3","task_12":"1.2.4 [WBS level 3]","task_slug_12":"124-wbs-level-3","task_13":"1.2.5 [WBS level 3]","task_slug_13":"125-wbs-level-3","task_14":"1.3 [WBS level 2]","task_slug_14":"13-wbs-level-2","task_15":"1.3.1 [WBS level 3]","task_slug_15":"131-wbs-level-3","task_16":"1.3.2 [WBS level 3]","task_slug_16":"132-wbs-level-3","task_17":"1.3.3 [WBS level 3]","task_slug_17":"133-wbs-level-3","task_18":"1.3.4 [WBS level 3]","task_slug_18":"134-wbs-level-3","task_19":"1.3.5 [WBS level 3]","task_slug_19":"135-wbs-level-3","task_20":"1.4 [WBS level 2]","task_slug_20":"14-wbs-level-2","task_21":"1.4.1 [WBS level 3]","task_slug_21":"141-wbs-level-3","task_22":"1.4.2 [WBS level 3]","task_slug_22":"142-wbs-level-3","task_23":"1.4.3 [WBS level 3]","task_slug_23":"143-wbs-level-3","task_24":"1.4.4 [WBS level 3]","task_slug_24":"144-wbs-level-3","task_25":"1.4.5 [WBS level 3]","task_slug_25":"145-wbs-level-3","task_26":"1.5 [WBS level 2]","task_slug_26":"15-wbs-level-2","task_27":"1.5.1 [WBS level 3]","task_slug_27":"151-wbs-level-3","task_28":"1.5.2 [WBS level 3]","task_slug_28":"152-wbs-level-3","task_29":"1.5.3 [WBS level 3]","task_slug_29":"153-wbs-level-3","task_30":"1.5.4 [WBS level 3]","task_slug_30":"154-wbs-level-3","task_31":"1.5.5 [WBS level 3]","task_slug_31":"155-wbs-level-3","task_32":"Sources:","task_slug_32":"sources","task_33":"Related checklists:","task_slug_33":"related-checklists","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[10,5,52],"tags":[],"class_list":["post-23868","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-featured","category-management-system"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/23868","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=23868"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/23868\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media\/23869"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=23868"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=23868"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=23868"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}