{"id":31226,"date":"2023-09-05T05:03:56","date_gmt":"2023-09-05T05:03:56","guid":{"rendered":"https:\/\/www.process.st\/templates\/project-audit-checklist\/"},"modified":"2024-04-23T07:24:12","modified_gmt":"2024-04-23T07:24:12","slug":"project-audit-checklist","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/project-audit-checklist\/","title":{"rendered":"Project Audit Checklist"},"content":{"rendered":"\n<section id=\"identify-audit-scope-and-objectives\">\n <h2>Identify audit scope and objectives<\/h2>\n <div class=\"image-content\">\n  <figure>\n   <a href=\"https:\/\/ps-attachments.s3.amazonaws.com\/854835eb-d77b-4920-beb1-3c0d64d5a407\/iKXZ21fM1l8MUVUr7lpA7Q.png\" alt=\"Identify audit scope and objectives\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ps-attachments.s3.amazonaws.com\/854835eb-d77b-4920-beb1-3c0d64d5a407\/iKXZ21fM1l8MUVUr7lpA7Q.png\"> <\/a><!-- No caption -->\n  <\/figure>\n <\/div>\n <div class=\"text-content\">\n  This task involves determining the specific scope and objectives of the audit. It is crucial to clearly define what areas or processes will be audited and what the expected outcomes are. By identifying the audit scope and objectives, it provides a roadmap for the entire audit process and ensures that the audit is focused and effective. What are the potential challenges in determining the audit scope and how can they be resolved? What resources or tools are required to complete this task?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Briefly describe the audit scope and objectives <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"select-audit-team\">\n <h2>Select Audit Team<\/h2>\n <div class=\"text-content\">\n  In this task, the audit team is selected. The audit team should consist of members who have the necessary skills, knowledge, and experience to successfully execute the audit. The team should be diverse and include individuals with different perspectives. Additionally, it is important to allocate roles and responsibilities to each team member. Who are potential candidates for the audit team? How will the roles and responsibilities be assigned?\n <\/div>\n <div class=\"members-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Select audit team members <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"planning-and-designing-the-audit-process\">\n <h2>Planning and Designing the audit process<\/h2>\n <div class=\"text-content\">\n  This task involves planning and designing the entire audit process. It includes creating an audit plan, which outlines the steps and procedures that will be followed during the audit. Additionally, the audit process should be designed in a way that ensures it is thorough, efficient, and effective. What factors should be considered when planning and designing the audit process? How can potential challenges be addressed?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Describe the audit plan and process design <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"approval-audit-plan\">\n <h2>Approval: Audit Plan<\/h2>\n <div class=\"approval-content\">\n  <div class=\"header\">\n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div>\n  <\/div>\n  <div class=\"approval-rule-subject-tasks-list\">\n   <ul class=\"list\">\n    <li>\n     <div class=\"approval-rule-subject-tasks-list-item\">\n      <div class=\"item\">\n       <div class=\"container\">\n        <span class=\"title\">Planning and Designing the audit process<\/span>\n        <div class=\"body\">\n         Will be submitted\n        <\/div>\n       <\/div>\n      <\/div>\n     <\/div><\/li>\n   <\/ul>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"perform-preliminary-review-of-project-documentation\">\n <h2>Perform preliminary review of project documentation<\/h2>\n <div class=\"text-content\">\n  In this task, a preliminary review of project documentation is conducted. This includes reviewing relevant documents such as project plans, contracts, and reports. The purpose of this review is to gain an understanding of the project and identify any potential issues or areas of concern that need to be further investigated during the audit. What types of project documentation should be reviewed? What are the potential challenges in conducting the preliminary review?\n <\/div>\n <div class=\"multi-select-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Check the following project documentation <\/label>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Project plans\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Contracts\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Reports\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      4\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Meeting minutes\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      5\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Budget documents\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"conduct-initial-meeting-with-project-manager\">\n <h2>Conduct initial meeting with project manager<\/h2>\n <div class=\"text-content\">\n  This task involves conducting an initial meeting with the project manager. The purpose of this meeting is to gather information about the project, discuss the audit process, and establish open lines of communication. It is important to establish rapport and build trust with the project manager to facilitate a successful audit. What information should be gathered during the meeting? How can a good relationship with the project manager be established?\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Enter the name of the project manager <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Describe the key points discussed during the initial meeting <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"develop-audit-test-procedures\">\n <h2>Develop audit test procedures<\/h2>\n <div class=\"text-content\">\n  In this task, audit test procedures are developed. These procedures are designed to assess the effectiveness of controls and determine whether they are sufficient to mitigate risks. Audit test procedures should be tailored to the specific audit objectives and based on best practices. What factors should be considered when developing audit test procedures? What resources or tools are required to develop these procedures?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Describe the audit test procedures <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"execute-audit-testing-process\">\n <h2>Execute audit testing process<\/h2>\n <div class=\"text-content\">\n  This task involves executing the audit testing process. The testing process should be conducted in accordance with the audit plan and procedures. It is important to gather sufficient and appropriate evidence to support audit findings and conclusions. Additionally, the testing process should be documented thoroughly to ensure transparency and accountability. What challenges might arise during the audit testing process and how can they be addressed?\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Enter the date when the audit testing process was conducted <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"file-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Upload the documentation of audit testing process <\/label>\n   <div class=\"file-container\">\n    <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-upload btn-icon\"><\/i> File will be uploaded here <\/button>\n   <\/div>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"analyse-audit-findings\">\n <h2>Analyse audit findings<\/h2>\n <div class=\"text-content\">\n  In this task, audit findings are analysed. The purpose of the analysis is to determine the significance of the findings and their implications for the project. It is important to consider the potential causes of the findings and their potential impact on the project's objectives. What factors should be considered when analysing audit findings? How can potential challenges in the analysis process be addressed?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Describe the audit findings <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"prepare-preliminary-audit-report\">\n <h2>Prepare preliminary audit report<\/h2>\n <div class=\"text-content\">\n  This task involves preparing a preliminary audit report. The report should include a summary of the audit findings, conclusions, and recommendations. The preliminary report should be reviewed and approved by the audit team before it is shared with the project manager. What sections should be included in the preliminary audit report? How can the report be effectively communicated to the project manager?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Write the summary of the audit findings, conclusions, and recommendations <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"hold-feedback-session-with-project-team\">\n <h2>Hold feedback session with project team<\/h2>\n <div class=\"text-content\">\n  In this task, a feedback session is held with the project team. The purpose of this session is to discuss the audit findings, conclusions, and recommendations with the project team. It is important to listen to the team's perspectives and address any concerns or questions they may have. How can the feedback session be structured to ensure open and constructive communication? What potential challenges might arise during the session and how can they be addressed?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Describe the key points discussed during the feedback session <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"approval-preliminary-audit-report\">\n <h2>Approval: Preliminary Audit Report<\/h2>\n <div class=\"approval-content\">\n  <div class=\"header\">\n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div>\n  <\/div>\n  <div class=\"approval-rule-subject-tasks-list\">\n   <ul class=\"list\">\n    <li>\n     <div class=\"approval-rule-subject-tasks-list-item\">\n      <div class=\"item\">\n       <div class=\"container\">\n        <span class=\"title\">Execute audit testing process<\/span>\n        <div class=\"body\">\n         Will be submitted\n        <\/div>\n       <\/div>\n      <\/div>\n     <\/div><\/li>\n    <li>\n     <div class=\"approval-rule-subject-tasks-list-item\">\n      <div class=\"item\">\n       <div class=\"container\">\n        <span class=\"title\">Analyse audit findings<\/span>\n        <div class=\"body\">\n         Will be submitted\n        <\/div>\n       <\/div>\n      <\/div>\n     <\/div><\/li>\n    <li>\n     <div class=\"approval-rule-subject-tasks-list-item\">\n      <div class=\"item\">\n       <div class=\"container\">\n        <span class=\"title\">Prepare preliminary audit report<\/span>\n        <div class=\"body\">\n         Will be submitted\n        <\/div>\n       <\/div>\n      <\/div>\n     <\/div><\/li>\n   <\/ul>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"corrections-and-enhancements-implementation\">\n <h2>Corrections and enhancements implementation<\/h2>\n <div class=\"text-content\">\n  This task involves implementing the corrections and enhancements identified during the audit. These may include addressing issues or weaknesses in project processes, controls, or documentation. It is important to develop an action plan to guide the implementation process and ensure that the necessary changes are made. What challenges might arise during the implementation process and how can they be addressed?\n <\/div>\n <div class=\"multi-select-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Check the following actions that have been implemented <\/label>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Addressed issues in project processes\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Improved controls\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Updated documentation\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      4\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Implemented recommendations from the audit\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"conduct-followup-audit\">\n <h2>Conduct follow-up audit<\/h2>\n <div class=\"text-content\">\n  In this task, a follow-up audit is conducted to assess the effectiveness of the corrections and enhancements implemented. The purpose of the follow-up audit is to determine whether the issues identified in the initial audit have been adequately addressed and whether the necessary improvements have been made. What factors should be considered when conducting a follow-up audit? How can potential challenges in the follow-up process be addressed?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Describe the findings and conclusions of the follow-up audit <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"prepare-final-audit-report\">\n <h2>Prepare final audit report<\/h2>\n <div class=\"text-content\">\n  This task involves preparing the final audit report. The report should include a summary of the initial audit findings, conclusions, recommendations, and the results of the follow-up audit. The final report should be reviewed and approved by the audit team before it is shared with senior management. What sections should be included in the final audit report? How can the report be effectively communicated to senior management?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Write the summary of the final audit report <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"review-of-the-audit-by-senior-management\">\n <h2>Review of the audit by senior management<\/h2>\n <div class=\"text-content\">\n  In this task, the audit is reviewed by senior management. The purpose of the review is to assess the effectiveness of the audit process and the quality of the audit report. Senior management should provide feedback and recommendations for improvement, if necessary. How can the review process be structured to ensure meaningful feedback and discussion? What potential challenges might arise during the review process and how can they be addressed?\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Enter the name of the senior management reviewer <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Write the feedback and recommendations provided by senior management <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"approval-final-audit-report\">\n <h2>Approval: Final Audit Report<\/h2>\n <div class=\"approval-content\">\n  <div class=\"header\">\n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div>\n  <\/div>\n  <div class=\"approval-rule-subject-tasks-list\">\n   <ul class=\"list\">\n    <li>\n     <div class=\"approval-rule-subject-tasks-list-item\">\n      <div class=\"item\">\n       <div class=\"container\">\n        <span class=\"title\">Conduct follow-up audit<\/span>\n        <div class=\"body\">\n         Will be submitted\n        <\/div>\n       <\/div>\n      <\/div>\n     <\/div><\/li>\n    <li>\n     <div class=\"approval-rule-subject-tasks-list-item\">\n      <div class=\"item\">\n       <div class=\"container\">\n        <span class=\"title\">Prepare final audit report<\/span>\n        <div class=\"body\">\n         Will be submitted\n        <\/div>\n       <\/div>\n      <\/div>\n     <\/div><\/li>\n   <\/ul>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"schedule-next-audit\">\n <h2>Schedule next audit<\/h2>\n <div class=\"text-content\">\n  This task involves scheduling the next audit. It is important to establish a regular audit cycle to ensure ongoing monitoring and improvement of project processes. The frequency and timing of the next audit should be determined based on the project's risk profile and management's objectives. How can the scheduling process be streamlined to facilitate efficient and timely audits? What potential challenges might arise during the scheduling process and how can they be addressed?\n <\/div>\n <div class=\"select-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Select the frequency of the next audit <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Annually\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Biannually\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Quarterly\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      4\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Semi-annually\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      5\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     On demand\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"archive-audit-records\">\n <h2>Archive audit records<\/h2>\n <div class=\"text-content\">\n  In this task, audit records are archived. This includes storing and organizing all relevant documentation, reports, and findings from the audit process. The purpose of archiving the audit records is to have a record of the audit for future reference and to ensure compliance with regulatory requirements. How should the audit records be stored and organized? How can potential challenges in the archiving process be addressed?\n <\/div>\n <div class=\"file-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Upload the archived audit records <\/label>\n   <div class=\"file-container\">\n    <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-upload btn-icon\"><\/i> File will be uploaded here <\/button>\n   <\/div>\n  <\/div>\n <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Identify audit scope and objectives This task involves determining the specific scope and objectives of the audit. It is crucial to clearly define what areas or processes will be audited and what the expected outcomes are. By identifying the audit scope and objectives, it provides a roadmap for the entire audit process and ensures that [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"\ud83d\udccb","cover_icon_url":"","tasks_count":"19","template_description":"","template_id":"hmjf3WdC9Ggt0WcS3HBJig","task_0":"Identify audit scope and objectives","task_slug_0":"identify-audit-scope-and-objectives","task_1":"Select Audit Team","task_slug_1":"select-audit-team","task_2":"Planning and Designing the audit process","task_slug_2":"planning-and-designing-the-audit-process","task_3":"Approval: Audit Plan","task_slug_3":"approval-audit-plan","task_4":"Perform preliminary review of project documentation","task_slug_4":"perform-preliminary-review-of-project-documentation","task_5":"Conduct initial meeting with project manager","task_slug_5":"conduct-initial-meeting-with-project-manager","task_6":"Develop audit test procedures","task_slug_6":"develop-audit-test-procedures","task_7":"Execute audit testing process","task_slug_7":"execute-audit-testing-process","task_8":"Analyse audit findings","task_slug_8":"analyse-audit-findings","task_9":"Prepare preliminary audit report","task_slug_9":"prepare-preliminary-audit-report","task_10":"Hold feedback session with project team","task_slug_10":"hold-feedback-session-with-project-team","task_11":"Approval: Preliminary Audit Report","task_slug_11":"approval-preliminary-audit-report","task_12":"Corrections and enhancements implementation","task_slug_12":"corrections-and-enhancements-implementation","task_13":"Conduct follow-up audit","task_slug_13":"conduct-followup-audit","task_14":"Prepare final audit report","task_slug_14":"prepare-final-audit-report","task_15":"Review of the audit by senior management","task_slug_15":"review-of-the-audit-by-senior-management","task_16":"Approval: Final Audit Report","task_slug_16":"approval-final-audit-report","task_17":"Schedule next audit","task_slug_17":"schedule-next-audit","task_18":"Archive audit records","task_slug_18":"archive-audit-records","task_19":"Approval: Final Audit Report","task_slug_19":"approval-final-audit-report","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[76,93],"tags":[],"class_list":["post-31226","post","type-post","status-publish","format-standard","hentry","category-assessment","category-audit"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/31226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=31226"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/31226\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=31226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=31226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=31226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}