{"id":32505,"date":"2023-10-14T06:06:31","date_gmt":"2023-10-14T06:06:31","guid":{"rendered":"https:\/\/www.process.st\/templates\/fda-process-validation-iqoqpq\/"},"modified":"2024-03-05T14:33:58","modified_gmt":"2024-03-05T14:33:58","slug":"fda-process-validation-iqoqpq","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/fda-process-validation-iqoqpq\/","title":{"rendered":"FDA Process Validation IQOQPQ"},"content":{"rendered":"\n<section id=\"define-intended-use\"> \n <h2>Define intended use<\/h2>\n <div class=\"text-content\">\n   This task involves clearly defining the intended use of the product or process being validated. It is essential to understand the purpose and scope of the validation to ensure all necessary steps are taken. Consider the impact of intended use on the overall validation process, potential challenges, and the desired results. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the intended use of the product or process. <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"choose-and-setup-the-validation-team\"> \n <h2>Choose and Setup the Validation Team<\/h2>\n <div class=\"text-content\">\n   In this task, you will select and set up the validation team responsible for carrying out the process validation. The validation team should consist of individuals with diverse expertise relevant to the validation. Consider the required resources, the roles and responsibilities of team members, and any potential challenges that may arise during team coordination. \n <\/div> \n <div class=\"multi-choice-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select team members <\/label> <select disabled class=\"form-control\"> <option value=\"\">Multiple options can be selected from this list<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Member 1 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Member 2 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Member 3 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       4 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Member 4 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       5 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Member 5 \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"establish-validation-protocol\"> \n <h2>Establish Validation Protocol<\/h2>\n <div class=\"text-content\">\n   This task involves creating a validation protocol that outlines the steps, procedures, and acceptance criteria for the validation process. The protocol ensures consistency and provides a framework for conducting the validation. Consider the required sections and details for the validation protocol, potential challenges in creating the protocol, and resources or tools needed for its development. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the title of the validation protocol <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the sections and details to be included in the validation protocol <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"evaluation-of-product-and-process-characteristics\"> \n <h2>Evaluation of Product and Process Characteristics<\/h2>\n <div class=\"text-content\">\n   In this task, you will evaluate the characteristics of the product or process being validated. This evaluation helps in understanding and documenting the critical aspects that need to be considered during the validation process. Consider the specific characteristics to be evaluated, their impact on the overall validation, potential challenges in the evaluation process, and the required resources or tools. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Product and Process Characteristics <\/label> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Characteristics 1 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Characteristics 2 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Characteristics 3 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       4 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Characteristics 4 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       5 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Characteristics 5 \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"approve-equipment-specification\"> \n <h2>Approve Equipment Specification<\/h2>\n <div class=\"text-content\">\n   This task involves reviewing and approving the equipment specification for the validation process. The equipment used should meet the required standards and specifications to ensure accurate and reliable results. Consider the equipment specifications, their impact on the validation process, potential challenges in approving the specifications, and any required resources or tools. \n <\/div> \n <div class=\"file-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Upload the equipment specification document <\/label> \n   <div class=\"file-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-upload btn-icon\"><\/i> File will be uploaded here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-design-specifications\"> \n <h2>Approval: Design Specifications<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Evaluation of Product and Process Characteristics<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"plan-installation-qualification-iq\"> \n <h2>Plan Installation Qualification (IQ)<\/h2>\n <div class=\"text-content\">\n   In this task, you will plan the installation qualification (IQ) process, which ensures that the equipment and systems are properly installed and meet the intended use requirements. Consider the steps and procedures involved in the IQ process, the know-how and resources needed to plan the qualification, potential challenges in the IQ process, and any required resources or tools. \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Set the date for the installation qualification <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"perform-installation-qualification-iq\"> \n <h2>Perform Installation Qualification (IQ)<\/h2>\n <div class=\"text-content\">\n   This task involves carrying out the installation qualification (IQ) process. It includes verifying that the equipment and systems are installed correctly and in accordance with the requirements. Consider the procedures and tests to be performed during the IQ, potential challenges in conducting the qualification, and the required resources or tools. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the test results <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"conduct-iq-review\"> \n <h2>Conduct IQ Review<\/h2>\n <div class=\"text-content\">\n   In this task, you will conduct a review of the installation qualification (IQ) process. The review ensures that all necessary steps and procedures have been followed and that the test results meet the acceptance criteria. Consider the review process, potential challenges in conducting the review, and any required resources or tools. \n <\/div> \n <div class=\"multi-choice-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select the IQ review outcome <\/label> <select disabled class=\"form-control\"> <option value=\"\">Multiple options can be selected from this list<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Pass \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Fail \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Pending \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"approval-iq-review\"> \n <h2>Approval: IQ Review<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Perform Installation Qualification (IQ)<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Conduct IQ Review<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"plan-operational-qualification-oq\"> \n <h2>Plan Operational Qualification (OQ)<\/h2>\n <div class=\"text-content\">\n   This task involves planning the operational qualification (OQ) process, which verifies that the equipment and systems perform within their operational limits and produce the desired output. Consider the steps and procedures involved in the OQ process, the know-how and resources needed to plan the qualification, potential challenges in the OQ process, and any required resources or tools. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Provide a brief description of the OQ plan <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n <div class=\"select-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select the OQ plan location <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Location 1 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Location 2 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Location 3 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       4 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Location 4 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       5 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Location 5 \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"perform-operational-qualification-oq\"> \n <h2>Perform Operational Qualification (OQ)<\/h2>\n <div class=\"text-content\">\n   This task involves carrying out the operational qualification (OQ) process. It includes performing tests and verifying that the equipment and systems operate within their operational limits. Consider the specific tests and procedures to be performed during the OQ, potential challenges in conducting the qualification, and the required resources or tools. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Operational Qualification Tests <\/label> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Test 1 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Test 2 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Test 3 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       4 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Test 4 \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       5 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Test 5 \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"conduct-oq-review\"> \n <h2>Conduct OQ Review<\/h2>\n <div class=\"text-content\">\n   In this task, you will conduct a review of the operational qualification (OQ) process. The review ensures that all necessary tests and procedures have been performed and that the results meet the acceptance criteria. Consider the review process, potential challenges in conducting the review, and any required resources or tools. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Provide comments and recommendations for the OQ review <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-oq-review\"> \n <h2>Approval: OQ Review<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Perform Operational Qualification (OQ)<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Conduct OQ Review<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"plan-performance-qualification-pq\"> \n <h2>Plan Performance Qualification (PQ)<\/h2>\n <div class=\"text-content\">\n   This task involves planning the performance qualification (PQ) process, which verifies that the equipment and systems consistently perform in accordance with the intended use requirements. Consider the steps and procedures involved in the PQ process, the know-how and resources needed to plan the qualification, potential challenges in the PQ process, and any required resources or tools. \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Set the date for the performance qualification <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"perform-performance-qualification-pq\"> \n <h2>Perform Performance Qualification (PQ)<\/h2>\n <div class=\"text-content\">\n   This task involves carrying out the performance qualification (PQ) process. It includes performing tests and verifying that the equipment and systems consistently meet the intended use requirements. Consider the specific tests and procedures to be performed during the PQ, potential challenges in conducting the qualification, and the required resources or tools. \n <\/div> \n <div class=\"email-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the email address for PQ test results <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"conduct-pq-review\"> \n <h2>Conduct PQ Review<\/h2>\n <div class=\"text-content\">\n   In this task, you will conduct a review of the performance qualification (PQ) process. The review ensures that all necessary tests and procedures have been performed and that the results meet the acceptance criteria. Consider the review process, potential challenges in conducting the review, and any required resources or tools. \n <\/div> \n <div class=\"select-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select the PQ review outcome <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Accept \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Reject \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Needs Further Action \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"approval-pq-review\"> \n <h2>Approval: PQ Review<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Perform Performance Qualification (PQ)<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Conduct PQ Review<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"prepare-validation-summary-report\"> \n <h2>Prepare Validation Summary Report<\/h2>\n <div class=\"text-content\">\n   This task involves preparing a validation summary report that documents the entire validation process, including the results of the IQ, OQ, and PQ. The report provides an overview of the validation outcome and any recommendations for improvement. Consider the sections and details to be included in the summary report, potential challenges in preparing the report, and any required resources or tools. \n <\/div> \n <div class=\"file-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Upload the validation summary report <\/label> \n   <div class=\"file-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-upload btn-icon\"><\/i> File will be uploaded here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n <div class=\"members-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select the person responsible for preparing the report <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-validation-summary-report\"> \n <h2>Approval: Validation Summary Report<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Prepare Validation Summary Report<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Define intended use This task involves clearly defining the intended use of the product or process being validated. It is essential to understand the purpose and scope of the validation to ensure all necessary steps are taken. Consider the impact of intended use on the overall validation process, potential challenges, and the desired results. Describe [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"\ud83d\udd2c","cover_icon_url":"","tasks_count":"20","template_description":"","template_id":"graeeXdCqCma-TrM_7lN8g","task_0":"Define intended use","task_slug_0":"define-intended-use","task_1":"Choose and Setup the Validation Team","task_slug_1":"choose-and-setup-the-validation-team","task_2":"Establish Validation Protocol","task_slug_2":"establish-validation-protocol","task_3":"Evaluation of Product and Process Characteristics","task_slug_3":"evaluation-of-product-and-process-characteristics","task_4":"Approve Equipment Specification","task_slug_4":"approve-equipment-specification","task_5":"Approval: Design Specifications","task_slug_5":"approval-design-specifications","task_6":"Plan Installation Qualification (IQ)","task_slug_6":"plan-installation-qualification-iq","task_7":"Perform Installation Qualification (IQ)","task_slug_7":"perform-installation-qualification-iq","task_8":"Conduct IQ Review","task_slug_8":"conduct-iq-review","task_9":"Approval: IQ Review","task_slug_9":"approval-iq-review","task_10":"Plan Operational Qualification (OQ)","task_slug_10":"plan-operational-qualification-oq","task_11":"Perform Operational Qualification (OQ)","task_slug_11":"perform-operational-qualification-oq","task_12":"Conduct OQ Review","task_slug_12":"conduct-oq-review","task_13":"Approval: OQ Review","task_slug_13":"approval-oq-review","task_14":"Plan Performance Qualification (PQ)","task_slug_14":"plan-performance-qualification-pq","task_15":"Perform Performance Qualification (PQ)","task_slug_15":"perform-performance-qualification-pq","task_16":"Conduct PQ Review","task_slug_16":"conduct-pq-review","task_17":"Approval: PQ Review","task_slug_17":"approval-pq-review","task_18":"Prepare Validation Summary Report","task_slug_18":"prepare-validation-summary-report","task_19":"Approval: Validation Summary Report","task_slug_19":"approval-validation-summary-report","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[29,113],"tags":[],"class_list":["post-32505","post","type-post","status-publish","format-standard","hentry","category-healthcare","category-medical"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/32505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=32505"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/32505\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=32505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=32505"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=32505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}