{"id":36466,"date":"2024-01-18T04:15:02","date_gmt":"2024-01-18T04:15:02","guid":{"rendered":"https:\/\/www.process.st\/templates\/asme-quality-system-review-checklist\/"},"modified":"2024-08-22T13:26:18","modified_gmt":"2024-08-22T13:26:18","slug":"asme-quality-system-review-checklist","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/asme-quality-system-review-checklist\/","title":{"rendered":"ASME Quality System Review Checklist"},"content":{"rendered":"\n<section id=\"identify-the-asme-code-to-be-reviewed\">\n <h2>Identify the ASME code to be reviewed.<\/h2>\n <div class=\"image-content\">\n  <figure>\n   <a href=\"https:\/\/ps-attachments.s3.amazonaws.com\/jHpMOi3y5AWLj2JOmH1BBg\/ASME-Quality-System-Review-Checklist.png\" alt=\"Identify the ASME code to be reviewed.\" target=\"_blank\" rel=\"noopener\"> <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/ps-attachments.s3.amazonaws.com\/jHpMOi3y5AWLj2JOmH1BBg\/ASME-Quality-System-Review-Checklist.png\"> <\/a><!-- No caption -->\n  <\/figure>\n <\/div>\n <div class=\"text-content\">\n  This task involves identifying the specific ASME code that will be reviewed. It is important to select the correct code to ensure compliance and accurate evaluation of the quality system. The task will determine the scope and focus of the review process. What ASME code needs to be reviewed?\n <\/div>\n <div class=\"text-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> ASME Code <\/label> <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\">\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"gather-all-relevant-documentation-and-records-associated-with-the-code\">\n <h2>Gather all relevant documentation and records associated with the code.<\/h2>\n <div class=\"text-content\">\n  To conduct a thorough review, it is essential to gather all documentation and records that are relevant to the identified ASME code. This could include manuals, procedures, drawings, specifications, and any other information related to the quality system. What documents and records are associated with the ASME code being reviewed?\n <\/div>\n <div class=\"file-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Documentation and Records <\/label>\n   <div class=\"file-container\">\n    <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-upload btn-icon\"><\/i> File will be uploaded here <\/button>\n   <\/div>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"evaluate-the-existing-quality-system-against-the-identified-asme-code-requirements\">\n <h2>Evaluate the existing quality system against the identified ASME code requirements.<\/h2>\n <div class=\"text-content\">\n  This task involves assessing the current quality system in place and comparing it to the requirements outlined in the identified ASME code. The evaluation should identify any gaps or areas of non-compliance. This task will help determine the level of compliance and areas for improvement. How does the existing quality system align with the requirements of the ASME code?\n <\/div>\n <div class=\"select-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Level of Compliance <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Highly Compliant\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Partially Compliant\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Non-compliant\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"identification-of-any-noncompliances-with-asme-code\">\n <h2>Identification of any non-compliances with ASME Code.<\/h2>\n <div class=\"text-content\">\n  Based on the evaluation of the existing quality system, any non-compliances with the ASME Code should be identified. This could include deviations from required procedures, missing documentation, or non-compliant processes. Identifying non-compliances is crucial for developing a corrective action plan. Are there any non-compliances with the ASME Code?\n <\/div>\n <div class=\"multi-choice-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Non-compliances <\/label> <select disabled class=\"form-control\"> <option value=\"\">Multiple options can be selected from this list<\/option> <\/select>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Non-Compliant Procedures\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Missing Documentation\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Inadequate Training\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      4\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Non-Compliant Processes\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      5\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Other\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"approval-noncompliance-identification\">\n <h2>Approval: Non-compliance Identification<\/h2>\n<\/section>\n<section id=\"develop-a-corrective-action-plan-for-identified-noncompliances\">\n <h2>Develop a corrective action plan for identified non-compliances.<\/h2>\n <div class=\"text-content\">\n  This task involves creating a plan to address the identified non-compliances with the ASME Code. The corrective action plan should outline specific steps, responsibilities, and timelines for addressing each non-compliance. It is important to develop an effective plan to ensure compliance and improve the quality system. What is the corrective action plan for the identified non-compliances?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Corrective Action Plan <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"implementation-of-corrective-actions\">\n <h2>Implementation of corrective actions.<\/h2>\n <div class=\"text-content\">\n  Once the corrective action plan has been developed, it is important to implement the identified actions. This task involves executing the plan and making the necessary changes to address the non-compliances with the ASME Code. Implementation may involve personnel training, process modifications, or documentation updates. How will the corrective actions be implemented?\n <\/div>\n <div class=\"multi-select-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Corrective Actions <\/label>\n  <\/div>\n  <ul class=\"items\">\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"record-the-changes-made-and-actions-taken\">\n <h2>Record the changes made and actions taken.<\/h2>\n <div class=\"text-content\">\n  To ensure accountability and transparency, it is important to document the changes made and actions taken during the implementation of corrective actions. This task involves recording all the relevant information regarding the modifications made to address the non-compliances. Documentation will serve as evidence of the correction process. What changes and actions have been taken to address the non-compliances?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Changes and Actions <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"reevaluate-the-quality-system-against-the-asme-code-requirements\">\n <h2>Re-evaluate the quality system against the ASME code requirements.<\/h2>\n <div class=\"text-content\">\n  After the implementation of corrective actions, it is crucial to re-evaluate the quality system to determine if it now complies with the ASME code requirements. This task involves assessing the system against the same criteria used in the initial evaluation. Re-evaluation will help to ensure that all non-compliances have been appropriately addressed. Does the quality system now comply with the ASME code requirements?\n <\/div>\n <div class=\"select-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Compliance Status <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Compliant\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Partially Compliant\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Non-compliant\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"check-if-all-noncompliances-have-been-appropriately-addressed\">\n <h2>Check if all non-compliances have been appropriately addressed.<\/h2>\n <div class=\"text-content\">\n  To validate the effectiveness of the corrective actions implemented, it is important to check if all identified non-compliances have been appropriately addressed. This task involves verifying that all necessary changes have been made, documentation is updated, and processes are aligned with the ASME code requirements. Have all non-compliances been appropriately addressed?\n <\/div>\n <div class=\"select-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Addressed Status <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Addressed\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Not Addressed\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"approval-corrective-actions-completion\">\n <h2>Approval: Corrective Actions Completion<\/h2>\n<\/section>\n<section id=\"prepare-a-report-detailing-the-review-process-findings-and-corrective-actions\">\n <h2>Prepare a report detailing the review process, findings, and corrective actions.<\/h2>\n <div class=\"text-content\">\n  After completing the quality system review, it is essential to prepare a detailed report that summarizes the entire process, findings, and corrective actions taken. The report should provide an overview of the review, highlight any non-compliances, and outline the steps taken to address them. It will serve as a reference for future reviews and demonstrate compliance. What are your findings and corrective actions from the review?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Review Report <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"submission-of-the-report-to-the-relevant-department-for-further-review\">\n <h2>Submission of the report to the relevant department for further review.<\/h2>\n <div class=\"text-content\">\n  Once the review report is complete, it should be submitted to the relevant department or individuals for further review. This task involves sharing the report with key stakeholders who will assess the findings and ensure that appropriate actions have been taken. Timely submission is crucial to maintain accountability and facilitate further review. Who should the review report be submitted to?\n <\/div>\n <div class=\"members-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Relevant Department\/Individual <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"approval-report-submission\">\n <h2>Approval: Report Submission<\/h2>\n<\/section>\n<section id=\"communicate-the-results-of-the-review-to-key-stakeholders\">\n <h2>Communicate the results of the review to key stakeholders.<\/h2>\n <div class=\"text-content\">\n  It is important to communicate the results of the review to key stakeholders to ensure proper understanding and awareness of the findings. This task involves sharing the review report and discussing the outcomes with relevant individuals or departments. Effective communication will facilitate cooperation and support for future compliance efforts. How will the review results be communicated to key stakeholders?\n <\/div>\n <div class=\"textarea-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Communication Method <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"schedule-a-followup-review-to-ensure-ongoing-compliance\">\n <h2>Schedule a follow-up review to ensure ongoing compliance.<\/h2>\n <div class=\"text-content\">\n  To maintain ongoing compliance with the ASME code and continuous improvement, it is crucial to schedule a follow-up review. This task involves planning a future review to assess whether the corrective actions have been effective and if the quality system remains compliant. Scheduling regular reviews will help identify any new non-compliances and ensure sustained adherence to the ASME code. When should the follow-up review be scheduled?\n <\/div>\n <div class=\"date-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Follow-up Review Date <\/label>\n   <div class=\"date-container\">\n    <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button>\n   <\/div>\n  <\/div>\n <\/div>\n<\/section>\n<section id=\"update-quality-management-system-documentation-to-reflect-changes-and-improvements\">\n <h2>Update quality management system documentation to reflect changes and improvements.<\/h2>\n <div class=\"text-content\">\n  Based on the findings and corrective actions identified during the review process, it is important to update the quality management system documentation. This task involves revising procedures, manuals, or any other relevant documents to reflect the changes and improvements made. Updating the documentation will ensure that all personnel have access to the latest information and adhere to the revised processes. Which documentation needs to be updated?\n <\/div>\n <div class=\"multi-choice-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Updated Documentation <\/label> <select disabled class=\"form-control\"> <option value=\"\">Multiple options can be selected from this list<\/option> <\/select>\n  <\/div>\n  <ul class=\"items\">\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      1\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Procedures\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      2\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Manuals\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      3\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Specifications\n    <\/div><\/li>\n   <li class=\"item\">\n    <div class=\"step-number-container\">\n     <div class=\"step-number\">\n      4\n     <\/div>\n    <\/div>\n    <div class=\"step-checkbox-container\">\n     <div class=\"step-checkbox\"><\/div>\n    <\/div>\n    <div class=\"item-name-static\">\n     Other\n    <\/div><\/li>\n  <\/ul>\n <\/div>\n<\/section>\n<section id=\"provide-asme-quality-system-review-training-to-key-personnel\">\n <h2>Provide ASME Quality System Review training to key personnel.<\/h2>\n <div class=\"text-content\">\n  To enhance understanding and compliance with the ASME code, it is important to provide training to key personnel involved in the quality system. This task involves conducting training sessions to ensure that all individuals are aware of the code requirements and review process. Training will empower personnel to effectively identify non-compliances and maintain compliance. Who needs to receive the ASME Quality System Review training?\n <\/div>\n <div class=\"members-field-content form-field-content\">\n  <div class=\"form-group\">\n   <label> Key Personnel <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select>\n  <\/div>\n <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Identify the ASME code to be reviewed. This task involves identifying the specific ASME code that will be reviewed. It is important to select the correct code to ensure compliance and accurate evaluation of the quality system. The task will determine the scope and focus of the review process. What ASME code needs to be [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"\ud83d\udccb","cover_icon_url":"","tasks_count":"18","template_description":"Improve ASME code compliance with our systematic Quality System Review Checklist, ensuring constant evaluation, corrective action, and effective communication.","template_id":"h__X3kqvjocwdAHT5H9DYw","task_0":"Identify the ASME code to be reviewed.","task_slug_0":"identify-the-asme-code-to-be-reviewed","task_1":"Gather all relevant documentation and records associated with the code.","task_slug_1":"gather-all-relevant-documentation-and-records-associated-with-the-code","task_2":"Evaluate the existing quality system against the identified ASME code requirements.","task_slug_2":"evaluate-the-existing-quality-system-against-the-identified-asme-code-requirements","task_3":"Identification of any non-compliances with ASME Code.","task_slug_3":"identification-of-any-noncompliances-with-asme-code","task_4":"Approval: Non-compliance Identification","task_slug_4":"approval-noncompliance-identification","task_5":"Develop a corrective action plan for identified non-compliances.","task_slug_5":"develop-a-corrective-action-plan-for-identified-noncompliances","task_6":"Implementation of corrective actions.","task_slug_6":"implementation-of-corrective-actions","task_7":"Record the changes made and actions taken.","task_slug_7":"record-the-changes-made-and-actions-taken","task_8":"Re-evaluate the quality system against the ASME code requirements.","task_slug_8":"reevaluate-the-quality-system-against-the-asme-code-requirements","task_9":"Check if all non-compliances have been appropriately addressed.","task_slug_9":"check-if-all-noncompliances-have-been-appropriately-addressed","task_10":"Approval: Corrective Actions Completion","task_slug_10":"approval-corrective-actions-completion","task_11":"Prepare a report detailing the review process, findings, and corrective actions.","task_slug_11":"prepare-a-report-detailing-the-review-process-findings-and-corrective-actions","task_12":"Submission of the report to the relevant department for further review.","task_slug_12":"submission-of-the-report-to-the-relevant-department-for-further-review","task_13":"Approval: Report Submission","task_slug_13":"approval-report-submission","task_14":"Communicate the results of the review to key stakeholders.","task_slug_14":"communicate-the-results-of-the-review-to-key-stakeholders","task_15":"Schedule a follow-up review to ensure ongoing compliance.","task_slug_15":"schedule-a-followup-review-to-ensure-ongoing-compliance","task_16":"Update quality management system documentation to reflect changes and improvements.","task_slug_16":"update-quality-management-system-documentation-to-reflect-changes-and-improvements","task_17":"Provide ASME Quality System Review training to key personnel.","task_slug_17":"provide-asme-quality-system-review-training-to-key-personnel","task_18":"","task_slug_18":"","task_19":"","task_slug_19":"","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[43,16],"tags":[],"class_list":["post-36466","post","type-post","status-publish","format-standard","hentry","category-inspection","category-quality-assurance"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/36466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=36466"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/36466\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=36466"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=36466"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=36466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}