{"id":37391,"date":"2024-02-06T06:10:48","date_gmt":"2024-02-06T06:10:48","guid":{"rendered":"https:\/\/www.process.st\/templates\/project-management-raci-template\/"},"modified":"2024-03-05T17:02:28","modified_gmt":"2024-03-05T17:02:28","slug":"project-management-raci-template","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/project-management-raci-template\/","title":{"rendered":"Project Management RACI Template"},"content":{"rendered":"\n<section id=\"identify-project-scope\"> \n <h2>Identify project scope<\/h2>\n <div class=\"text-content\">\n   This task involves determining the boundaries and objectives of the project. It sets the stage for the entire project and helps define what will and will not be included. The project scope will guide decision-making, resource allocation, and ultimately, project success. Use this task to gather all the necessary information and clarify any uncertainties about the project scope. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the project scope <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"establish-objective-and-deliverables\"> \n <h2>Establish objective and deliverables<\/h2>\n <div class=\"text-content\">\n   In this task, you will define the project's objectives and deliverables. Objectives are the specific outcomes or results that the project aims to achieve, while deliverables are the tangible products or services that will be produced or provided. Clearly establishing the objectives and deliverables is crucial for project success as it provides a clear focus for the team and stakeholders. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the project objectives <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> List the project deliverables <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"identify-stakeholders\"> \n <h2>Identify stakeholders<\/h2>\n <div class=\"text-content\">\n   Stakeholders are individuals or groups who have an interest or influence in the project. Identifying stakeholders is important for effective communication, involvement, and commitment throughout the project. Use this task to collect information about the stakeholders and understand their needs, expectations, and potential impact on the project. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the names of primary stakeholders <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"identify-team-members\"> \n <h2>Identify team members<\/h2>\n <div class=\"text-content\">\n   The project team consists of individuals who will be responsible for executing the project tasks and achieving the project objectives. Identifying team members is crucial for resource allocation, task assignments, and overall coordination. Use this task to gather information about the team members and their roles in the project. \n <\/div> \n <div class=\"members-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select team members <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"define-roles-and-responsibilities\"> \n <h2>Define roles and responsibilities<\/h2>\n <div class=\"text-content\">\n   In this task, you will define the roles and responsibilities of each team member. Clearly defining roles ensures that everyone knows what is expected of them and who is responsible for each task. This promotes accountability, effective collaboration, and reduces the likelihood of misunderstandings or duplication of efforts. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter team member's role <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe their responsibilities <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"create-initial-raci-chart\"> \n <h2>Create initial RACI chart<\/h2>\n <div class=\"text-content\">\n   A RACI chart is a project management tool that defines the roles and responsibilities for each task or deliverable. It clarifies who is Responsible, Accountable, Consulted, and Informed for each task. Use this task to create the initial RACI chart, ensuring that all team members and stakeholders are assigned appropriate roles. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Tasks or deliverables to be included in the RACI chart <\/label> \n  <\/div> \n  <ul class=\"items\"> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"define-communication-plan\"> \n <h2>Define communication plan<\/h2>\n <div class=\"text-content\">\n   Effective communication is essential for successful project management. In this task, you will define a communication plan that outlines how information will be shared, who will be responsible for communication, and the preferred communication channels. This ensures that all relevant stakeholders are informed and engaged throughout the project. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the communication plan <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"obtain-team-input-and-feedback-on-proposed-raci-chart\"> \n <h2>Obtain team input and feedback on proposed RACI chart<\/h2>\n <div class=\"text-content\">\n   Once the initial RACI chart is created, it is important to gather input and feedback from the team members. This ensures that everyone's perspective and expertise are considered, and any necessary adjustments or clarifications can be made. Use this task to gather feedback on the proposed RACI chart and make revisions as needed. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Tasks or deliverables for feedback <\/label> \n  <\/div> \n  <ul class=\"items\"> \n  <\/ul> \n <\/div> \n <div class=\"members-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Select team members for input <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-raci-chart\"> \n <h2>Approval: RACI Chart<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Create initial RACI chart<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Obtain team input and feedback on proposed RACI chart<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"finalize-raci-chart\"> \n <h2>Finalize RACI chart<\/h2>\n <div class=\"text-content\">\n   This task involves reviewing and finalizing the RACI chart based on the feedback and input received from the team. Ensure that all tasks and deliverables are assigned the appropriate roles and responsibilities and that any conflicts or gaps are addressed. The finalized RACI chart will serve as a reference for project execution and decision-making. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Tasks or deliverables in the final RACI chart <\/label> \n  <\/div> \n  <ul class=\"items\"> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"execute-project-plan-following-raci-outline\"> \n <h2>Execute project plan following RACI outline<\/h2>\n <div class=\"text-content\">\n   With the finalized RACI chart in hand, it's time to put the project plan into action. Use this task to execute the project plan following the assigned roles and responsibilities as outlined in the RACI chart. Regularly update the progress and ensure effective coordination and collaboration among the team members. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the project plan execution details <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"monitor-progress-of-tasks-and-responsibilities\"> \n <h2>Monitor progress of tasks and responsibilities<\/h2>\n <div class=\"text-content\">\n   Monitoring progress is essential to ensure that tasks are being completed as planned and responsibilities are being fulfilled. Use this task to regularly track and update the progress of tasks and responsibilities as outlined in the RACI chart. Identify any issues or delays and take necessary actions to keep the project on track. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Tasks or deliverables to monitor <\/label> \n  <\/div> \n  <ul class=\"items\"> \n  <\/ul> \n <\/div> \n <div class=\"select-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Progress status <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Not Started \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      In Progress \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Completed \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"update-raci-chart-as-needed\"> \n <h2>Update RACI chart as needed<\/h2>\n <div class=\"text-content\">\n   As the project progresses, it is common for adjustments to be made to the RACI chart. New tasks may arise, roles may change, or responsibilities may shift. Use this task to update the RACI chart as needed to ensure it accurately reflects the current state of the project. Communicate any changes to the team members and stakeholders to avoid confusion or misunderstandings. \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Tasks or deliverables to update in the RACI chart <\/label> \n  <\/div> \n  <ul class=\"items\"> \n  <\/ul> \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the changes made <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"routine-project-status-updates\"> \n <h2>Routine project status updates<\/h2>\n <div class=\"text-content\">\n   In this task, you will provide routine project status updates to keep stakeholders informed about the project's progress. Use this task to gather the necessary information and provide updates on key milestones, deliverables, and any issues or risks that may impact the project. Ensure that the communication channels and frequency of updates align with the communication plan. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the project status update <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"project-completion-review\"> \n <h2>Project completion review<\/h2>\n <div class=\"text-content\">\n   Once the project is completed, it is important to conduct a review to assess its overall success, identify areas for improvement, and capture lessons learned. Use this task to review the project's performance, gather feedback from the team members and stakeholders, and document the key findings and recommendations for future projects. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the project completion review <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n <div class=\"multi-choice-content form-field-content\"> \n  <div class=\"form-group\"> <label> Lessons learned <\/label> <select disabled class=\"form-control\"> <option value=\"\">Multiple options can be selected from this list<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Poor communication \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Inadequate resource allocation \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Unrealistic timelines \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       4 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Scope creep \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       5 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Lack of stakeholder engagement \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"approval-completed-project\"> \n <h2>Approval: Completed Project<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Project completion review<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"document-lessons-learned\"> \n <h2>Document lessons learned<\/h2>\n <div class=\"text-content\">\n   Lessons learned capture valuable insights and experiences gained during the project. Use this task to document the lessons learned, including what worked well, what could have been improved, and any recommendations for future projects. This information can be used to enhance project management practices and avoid repeating past mistakes. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> List the lessons learned <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"update-raci-template-based-on-feedback-and-lessons-learned\"> \n <h2>Update RACI template based on feedback and lessons learned<\/h2>\n <div class=\"text-content\">\n   Based on the feedback and lessons learned from the completed project, it is important to update the RACI template to incorporate any improvements or changes. This ensures that future projects benefit from the knowledge and insights gained. Use this task to update the RACI template based on the feedback and lessons learned from the project. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Describe the updates made to the RACI template <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"archive-completed-raci-chart-for-reference\"> \n <h2>Archive completed RACI chart for reference<\/h2>\n <div class=\"text-content\">\n   Once the project is completed and the RACI chart has served its purpose, it is important to archive the completed RACI chart for future reference. Archiving the RACI chart ensures that it can be easily accessed and reviewed in future projects or for reference purposes. \n <\/div> \n <div class=\"file-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Upload the completed RACI chart <\/label> \n   <div class=\"file-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-upload btn-icon\"><\/i> File will be uploaded here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"close-the-project\"> \n <h2>Close the project<\/h2>\n <div class=\"text-content\">\n   Closing the project involves formally ending all project activities, documenting the final project outcomes, and ensuring a smooth transition of deliverables or services. Use this task to ensure that all necessary closure activities are completed and the project is officially closed. \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Enter the project closure date <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Identify project scope This task involves determining the boundaries and objectives of the project. It sets the stage for the entire project and helps define what will and will not be included. The project scope will guide decision-making, resource allocation, and ultimately, project success. Use this task to gather all the necessary information and clarify [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"\ud83d\udcca","cover_icon_url":"","tasks_count":"20","template_description":"Maximize project outcomes with our Project Management RACI Template, a comprehensive guideline to define roles, responsibilities, and streamline communication.","template_id":"n6zZundAUMLsBjom4FRPEg","task_0":"Identify project scope","task_slug_0":"identify-project-scope","task_1":"Establish objective and deliverables","task_slug_1":"establish-objective-and-deliverables","task_2":"Identify stakeholders","task_slug_2":"identify-stakeholders","task_3":"Identify team members","task_slug_3":"identify-team-members","task_4":"Define roles and responsibilities","task_slug_4":"define-roles-and-responsibilities","task_5":"Create initial RACI chart","task_slug_5":"create-initial-raci-chart","task_6":"Define communication plan","task_slug_6":"define-communication-plan","task_7":"Obtain team input and feedback on proposed RACI chart","task_slug_7":"obtain-team-input-and-feedback-on-proposed-raci-chart","task_8":"Approval: RACI Chart","task_slug_8":"approval-raci-chart","task_9":"Finalize RACI chart","task_slug_9":"finalize-raci-chart","task_10":"Execute project plan following RACI outline","task_slug_10":"execute-project-plan-following-raci-outline","task_11":"Monitor progress of tasks and responsibilities","task_slug_11":"monitor-progress-of-tasks-and-responsibilities","task_12":"Update RACI chart as needed","task_slug_12":"update-raci-chart-as-needed","task_13":"Routine project status updates","task_slug_13":"routine-project-status-updates","task_14":"Project completion review","task_slug_14":"project-completion-review","task_15":"Approval: Completed Project","task_slug_15":"approval-completed-project","task_16":"Document lessons learned","task_slug_16":"document-lessons-learned","task_17":"Update RACI template based on feedback and lessons learned","task_slug_17":"update-raci-template-based-on-feedback-and-lessons-learned","task_18":"Archive completed RACI chart for reference","task_slug_18":"archive-completed-raci-chart-for-reference","task_19":"Close the project","task_slug_19":"close-the-project","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[23,83],"tags":[],"class_list":["post-37391","post","type-post","status-publish","format-standard","hentry","category-operations","category-project-management"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/37391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=37391"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/37391\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=37391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=37391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=37391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}