{"id":38142,"date":"2024-02-23T08:07:27","date_gmt":"2024-02-23T08:07:27","guid":{"rendered":"https:\/\/www.process.st\/templates\/agile-quarterly-planning-template\/"},"modified":"2024-03-05T17:20:38","modified_gmt":"2024-03-05T17:20:38","slug":"agile-quarterly-planning-template","status":"publish","type":"post","link":"https:\/\/www.process.st\/templates\/agile-quarterly-planning-template\/","title":{"rendered":"Agile Quarterly Planning Template"},"content":{"rendered":"\n<section id=\"establish-agile-planning-team\"> \n <h2>Establish Agile planning team<\/h2>\n <div class=\"text-content\">\n   In this task, you will assemble a team of individuals who will be responsible for planning and executing agile projects. The team should consist of individuals with diverse skills and expertise. The objective is to create a team that can effectively collaborate and communicate, ensuring the success of the agile planning process. Key results include a well-rounded team with clearly defined roles and responsibilities, ready to begin the planning phase. \n <\/div> \n <div class=\"members-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Team member(s) <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"define-project-objectives\"> \n <h2>Define project objectives<\/h2>\n <div class=\"text-content\">\n   This task involves clarifying the purpose and goals of the project. Objectives should be specific, measurable, achievable, relevant, and time-bound (SMART). By clearly defining the project objectives, the entire team will have a shared understanding and direction. Successful completion of this task will result in a clear and concise statement of project objectives, laying the foundation for the subsequent planning activities. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Project objectives <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"outline-initiatives-to-achieve-objectives\"> \n <h2>Outline initiatives to achieve objectives<\/h2>\n <div class=\"text-content\">\n   In this task, you will brainstorm and identify the key initiatives that will help you achieve the project objectives. These initiatives should be specific actions or projects that align with and contribute to the overall project goals. The outcome of this task will be a list of initiatives that will serve as the building blocks for the agile planning process. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Initiatives <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"identify-necessary-resources-for-each-initiative\"> \n <h2>Identify necessary resources for each initiative<\/h2>\n <div class=\"text-content\">\n   In order to successfully execute each initiative, you must identify the necessary resources. Resources may include personnel, equipment, tools, technology, or any other assets required for the completion of the initiative. The goal of this task is to ensure that all needed resources are identified and available before moving forward with the planning process. \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Initiative <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Resources needed <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-necessary-resources\"> \n <h2>Approval: Necessary resources<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Identify necessary resources for each initiative<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"assign-roles-to-team-members\"> \n <h2>Assign roles to team members<\/h2>\n <div class=\"text-content\">\n   Assigning roles to team members is essential for effective collaboration and accountability within the agile planning process. In this task, you will assign specific roles to each team member based on their skills, expertise, and interests. The outcome of this task will be a clear distribution of roles and responsibilities, ensuring a smooth workflow throughout the planning phase. \n <\/div> \n <div class=\"members-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Team member <\/label> <select disabled class=\"form-control\"> <option value=\"A member or group will be selected here\">A member or group will be selected here<\/option> <\/select> \n  <\/div> \n <\/div> \n <div class=\"select-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Role <\/label> <select disabled class=\"form-control\"> <option value=\"An option will be selected here\">An option will be selected here<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Product Owner \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Scrum Master \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Team Member \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"determine-timelines-and-milestones\"> \n <h2>Determine timelines and milestones<\/h2>\n <div class=\"text-content\">\n   Establishing timelines and milestones is crucial for tracking progress and ensuring project goals are met. In this task, you will define the specific timelines and milestones for each initiative. The outcome of this task will be a timeline that outlines the start and end dates for each initiative, as well as the milestones that need to be achieved along the way. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Initiative <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Start date <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> End date <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Milestones <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"define-scope-of-tasks-for-each-initiative\"> \n <h2>Define scope of tasks for each initiative<\/h2>\n <div class=\"text-content\">\n   Defining the scope of tasks is crucial to ensure that all necessary activities are identified and included in the planning process. In this task, you will break down each initiative into smaller tasks and outline their specific details. The outcome of this task will be a comprehensive list of tasks and their respective details, providing a clear roadmap for the planning phase. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Initiative <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n <div class=\"multi-select-content form-field-content\"> \n  <div class=\"form-group\"> <label> Tasks <\/label> \n  <\/div> \n  <ul class=\"items\"> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"plan-and-schedule-team-meetings\"> \n <h2>Plan and schedule team meetings<\/h2>\n <div class=\"text-content\">\n   Planning and scheduling team meetings is essential for effective communication and collaboration within the agile planning process. In this task, you will determine the frequency, duration, and agenda of team meetings. The outcome of this task will be a well-defined plan and schedule for team meetings, ensuring regular updates and progress tracking. \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Meeting date <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Agenda <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-initial-agile-plan\"> \n <h2>Approval: Initial Agile plan<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Assign roles to team members<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Determine timelines and milestones<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Define scope of tasks for each initiative<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Plan and schedule team meetings<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"communicate-plan-to-rest-of-the-organization\"> \n <h2>Communicate plan to rest of the organization<\/h2>\n <div class=\"text-content\">\n   Communicating the agile plan to the rest of the organization is important to ensure transparency and alignment. In this task, you will develop a communication strategy and identify the key stakeholders who need to be informed about the plan. The outcome of this task will be a clear plan for communicating the agile plan to the rest of the organization. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Communication strategy <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n <div class=\"multi-choice-content form-field-content\"> \n  <div class=\"form-group\"> <label> Stakeholders <\/label> <select disabled class=\"form-control\"> <option value=\"\">Multiple options can be selected from this list<\/option> <\/select> \n  <\/div> \n  <ul class=\"items\"> \n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       1 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Executives \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       2 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Department Managers \n    <\/div> <\/li>\n   <li class=\"item\"> \n    <div class=\"step-number-container\"> \n     <div class=\"step-number\">\n       3 \n     <\/div> \n    <\/div> \n    <div class=\"step-checkbox-container\"> \n     <div class=\"step-checkbox\"><\/div> \n    <\/div> \n    <div class=\"item-name-static\">\n      Team Members \n    <\/div> <\/li> \n  <\/ul> \n <\/div> \n<\/section> \n<section id=\"schedule-review-meetings-to-monitor-progress\"> \n <h2>Schedule review meetings to monitor progress<\/h2>\n <div class=\"text-content\">\n   Scheduling regular review meetings is essential for monitoring the progress of the agile plan and making necessary adjustments. In this task, you will determine the frequency, duration, and agenda of review meetings. The outcome of this task will be a well-defined schedule for review meetings, ensuring continuous improvement and adaptation. \n <\/div> \n <div class=\"date-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Review meeting date <\/label> \n   <div class=\"date-container\"> <button type=\"button\" disabled class=\"btn btn-default\"> <i class=\"fa fa-calendar btn-icon\"><\/i> Date will be set here <\/button> \n   <\/div> \n  <\/div> \n <\/div> \n <div class=\"text-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Agenda <\/label> \n   <input type=\"text\" placeholder=\"Something will be typed here...\" disabled class=\"form-control\"> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"adjust-plan-based-on-ongoing-feedback\"> \n <h2>Adjust plan based on ongoing feedback<\/h2>\n <div class=\"text-content\">\n   Adjusting the plan based on ongoing feedback is crucial for improving the effectiveness of the agile planning process. In this task, you will collect feedback from team members and stakeholders and incorporate it into the plan. The outcome of this task will be an updated and improved agile plan that reflects the input and insights from all stakeholders. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Feedback <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-adjusted-agile-plan\"> \n <h2>Approval: Adjusted Agile plan<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Schedule review meetings to monitor progress<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Adjust plan based on ongoing feedback<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"manage-and-mitigate-risks\"> \n <h2>Manage and mitigate risks<\/h2>\n <div class=\"text-content\">\n   Identifying and managing risks is essential to ensure the success of the agile planning process. In this task, you will identify potential risks, assess their likelihood and impact, and develop strategies to mitigate them. The outcome of this task will be a comprehensive risk management plan that reduces the likelihood and impact of risks on the project. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Risks <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Mitigation strategies <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"ensure-alignment-with-organizations-strategy\"> \n <h2>Ensure alignment with organization's strategy<\/h2>\n <div class=\"text-content\">\n   Ensuring alignment with the organization's strategy is crucial for the success of the agile planning process. In this task, you will review the organization's strategic goals and objectives and ensure that the agile plan aligns with them. The outcome of this task will be a confirmation that the agile plan is in line with the organization's overall strategy. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Organization's strategy <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"create-contingency-plans\"> \n <h2>Create contingency plans<\/h2>\n <div class=\"text-content\">\n   Creating contingency plans is essential for preparing for potential disruptions or unexpected events. In this task, you will develop backup plans and alternative courses of action to mitigate the impact of unforeseen circumstances. The outcome of this task will be a set of contingency plans that can be implemented if needed. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Contingency plans <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"monitor-changes-in-external-environment\"> \n <h2>Monitor changes in external environment<\/h2>\n <div class=\"text-content\">\n   Monitoring changes in the external environment is crucial for responding quickly to new opportunities or threats. In this task, you will keep an eye on market trends, industry developments, and other external factors that may impact the project. The outcome of this task will be a regularly updated record of external changes and their potential impact on the project. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> External changes <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"realign-plan-based-on-changes-in-external-environment\"> \n <h2>Realign plan based on changes in external environment<\/h2>\n <div class=\"text-content\">\n   Realigning the plan based on changes in the external environment is crucial to ensure continued relevance and effectiveness. In this task, you will evaluate the impact of external changes on the agile plan and make necessary adjustments. The outcome of this task will be an updated agile plan that takes into account the latest external developments. \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Evaluation of impact <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n <div class=\"textarea-field-content form-field-content\"> \n  <div class=\"form-group\"> <label> Adjustments made <\/label> <textarea placeholder=\"Something will be typed here...\" rows=\"3\" disabled class=\"form-control\"><\/textarea> \n  <\/div> \n <\/div> \n<\/section> \n<section id=\"approval-final-agile-quarterly-plan\"> \n <h2>Approval: Final Agile quarterly plan<\/h2>\n <div class=\"approval-content\"> \n  <div class=\"header\"> \n   <div class=\"list-title\">\n    Will be submitted for approval:\n   <\/div> \n  <\/div> \n  <div class=\"approval-rule-subject-tasks-list\"> \n   <ul class=\"list\"> \n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Communicate plan to rest of the organization<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li>\n    <li> \n     <div class=\"approval-rule-subject-tasks-list-item\"> \n      <div class=\"item\"> \n       <div class=\"container\"> <span class=\"title\">Realign plan based on changes in external environment<\/span> \n        <div class=\"body\">\n         Will be submitted\n        <\/div> \n       <\/div> \n      <\/div> \n     <\/div> <\/li> \n   <\/ul> \n  <\/div> \n <\/div> \n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Establish Agile planning team In this task, you will assemble a team of individuals who will be responsible for planning and executing agile projects. The team should consist of individuals with diverse skills and expertise. The objective is to create a team that can effectively collaborate and communicate, ensuring the success of the agile planning [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"ep_exclude_from_search":false,"cover_icon_emoji":"\ud83d\udcc5","cover_icon_url":"","tasks_count":"20","template_description":"Manage your projects effectively with the Agile Quarterly Planning Template, a comprehensive roadmap for establishing goals, resources, timelines, and adjustments.","template_id":"pufk1E-ZoeCM35bTQ9BNJA","task_0":"Establish Agile planning team","task_slug_0":"establish-agile-planning-team","task_1":"Define project objectives","task_slug_1":"define-project-objectives","task_2":"Outline initiatives to achieve objectives","task_slug_2":"outline-initiatives-to-achieve-objectives","task_3":"Identify necessary resources for each initiative","task_slug_3":"identify-necessary-resources-for-each-initiative","task_4":"Approval: Necessary resources","task_slug_4":"approval-necessary-resources","task_5":"Assign roles to team members","task_slug_5":"assign-roles-to-team-members","task_6":"Determine timelines and milestones","task_slug_6":"determine-timelines-and-milestones","task_7":"Define scope of tasks for each initiative","task_slug_7":"define-scope-of-tasks-for-each-initiative","task_8":"Plan and schedule team meetings","task_slug_8":"plan-and-schedule-team-meetings","task_9":"Approval: Initial Agile plan","task_slug_9":"approval-initial-agile-plan","task_10":"Communicate plan to rest of the organization","task_slug_10":"communicate-plan-to-rest-of-the-organization","task_11":"Schedule review meetings to monitor progress","task_slug_11":"schedule-review-meetings-to-monitor-progress","task_12":"Adjust plan based on ongoing feedback","task_slug_12":"adjust-plan-based-on-ongoing-feedback","task_13":"Approval: Adjusted Agile plan","task_slug_13":"approval-adjusted-agile-plan","task_14":"Manage and mitigate risks","task_slug_14":"manage-and-mitigate-risks","task_15":"Ensure alignment with organization's strategy","task_slug_15":"ensure-alignment-with-organizations-strategy","task_16":"Create contingency plans","task_slug_16":"create-contingency-plans","task_17":"Monitor changes in external environment","task_slug_17":"monitor-changes-in-external-environment","task_18":"Realign plan based on changes in external environment","task_slug_18":"realign-plan-based-on-changes-in-external-environment","task_19":"Approval: Final Agile quarterly plan","task_slug_19":"approval-final-agile-quarterly-plan","task_20":"","task_slug_20":"","task_21":"","task_slug_21":"","task_22":"","task_slug_22":"","task_23":"","task_slug_23":"","task_24":"","task_slug_24":"","task_25":"","task_slug_25":"","task_26":"","task_slug_26":"","task_27":"","task_slug_27":"","task_28":"","task_slug_28":"","task_29":"","task_slug_29":"","task_30":"","task_slug_30":"","task_31":"","task_slug_31":"","task_32":"","task_slug_32":"","task_33":"","task_slug_33":"","task_34":"","task_slug_34":"","task_35":"","task_slug_35":"","task_36":"","task_slug_36":"","task_37":"","task_slug_37":"","task_38":"","task_slug_38":"","task_39":"","task_slug_39":"","task_40":"","task_slug_40":"","task_41":"","task_slug_41":"","task_42":"","task_slug_42":"","task_43":"","task_slug_43":"","task_44":"","task_slug_44":"","task_45":"","task_slug_45":"","task_46":"","task_slug_46":"","task_47":"","task_slug_47":"","task_48":"","task_slug_48":"","task_49":"","task_slug_49":"","task_50":"","task_slug_50":"","task_51":"","task_slug_51":"","task_52":"","task_slug_52":"","task_53":"","task_slug_53":"","task_54":"","task_slug_54":"","task_55":"","task_slug_55":"","task_56":"","task_slug_56":"","task_57":"","task_slug_57":"","task_58":"","task_slug_58":"","task_59":"","task_slug_59":"","task_60":"","task_slug_60":"","task_61":"","task_slug_61":"","task_62":"","task_slug_62":"","task_63":"","task_slug_63":"","task_64":"","task_slug_64":"","task_65":"","task_slug_65":"","task_66":"","task_slug_66":"","task_67":"","task_slug_67":"","task_68":"","task_slug_68":"","task_69":"","task_slug_69":"","task_70":"","task_slug_70":"","task_71":"","task_slug_71":"","task_72":"","task_slug_72":"","task_73":"","task_slug_73":"","task_74":"","task_slug_74":"","task_75":"","task_slug_75":"","task_76":"","task_slug_76":"","task_77":"","task_slug_77":"","task_78":"","task_slug_78":"","task_79":"","task_slug_79":"","task_80":"","task_slug_80":"","task_81":"","task_slug_81":"","task_82":"","task_slug_82":"","task_83":"","task_slug_83":"","task_84":"","task_slug_84":"","task_85":"","task_slug_85":"","task_86":"","task_slug_86":"","task_87":"","task_slug_87":"","task_88":"","task_slug_88":"","task_89":"","task_slug_89":"","task_90":"","task_slug_90":"","task_91":"","task_slug_91":"","task_92":"","task_slug_92":"","task_93":"","task_slug_93":"","task_94":"","task_slug_94":"","task_95":"","task_slug_95":"","task_96":"","task_slug_96":"","task_97":"","task_slug_97":"","task_98":"","task_slug_98":"","task_99":"","task_slug_99":"","footnotes":""},"categories":[10,83],"tags":[],"class_list":["post-38142","post","type-post","status-publish","format-standard","hentry","category-business","category-project-management"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/38142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/comments?post=38142"}],"version-history":[{"count":0,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/posts\/38142\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/media?parent=38142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/categories?post=38142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.process.st\/templates\/wp-json\/wp\/v2\/tags?post=38142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}