Templates
ISO
FSSC 22000: ISO/TS 22002-1 Internal Audit Checklist

FSSC 22000: ISO/TS 22002-1 Internal Audit Checklist

Run this checklist to perform a comprehensive internal audit and gap analysis for FSSC 22000 (Food Processing) certification
1
Introduction:
2
Enter basic details
3
Construction & layout of buildings:
4
Check environment is suitable
5
Check locations of establishments are suitable
6
Summarize construction & layout of buildings
7
Approval: Construction & layout of buildings
8
Layout of premises workspace:
9
Check internal design and layout
10
Check internal structures and fittings
11
Check location of equipment
12
Inspect laboratory facilities
13
Inspect temporary/mobile premises
14
Check food storage and packaging materials
15
Summarize layout of premises workspace
16
Approval: Layout of premises workspace
17
Utilities (air, water, energy):
18
Check water supply
19
Check boiler chemicals
20
Check air quality and ventilation
21
Check compressed air and other gases
22
Check lighting
23
Summarize utilities
24
Approval: Utilities
25
Waste disposal:
26
Check containers for waste and hazardous substances
27
Check waste management and removal
28
Inspect drains and drainage
29
Summarize waste disposal systems
30
Approval: Waste disposal
31
Equipment, cleaning & maintenance:
32
Inspect product contact surfaces
33
Check temperature control and monitoring equipment
34
Check cleaning plant, utensils and equipment
35
Check preventive and corrective maintenance
36
Summarize equipment suitability, cleaning and maintenance
37
Approval: Equipment, cleaning & maintenance
38
Management of purchased materials:
39
Evaluate selection and management of suppliers
40
Evaluate handling of incoming materials
41
Summarize management of purchased materials
42
Approval: Management of purchased materials
43
Prevention of cross contamination:
44
Evaluate microbiological cross contamination management
45
Evaluate allergen management
46
Summarize measures for preventing cross contamination
47
Approval: Prevention of cross-contamination
48
Cleaning & sanitizing:
49
Check cleaning and sanitizing agents and tools
50
Evaluate cleaning in place (CIP) systems
51
Evaluate monitoring of sanitation effectiveness
52
Summarize cleaning and sanitizing
53
Approval: Cleaning & sanitizing
54
Pest control:
55
Evaluate pest control program
56
Check access prevention systems
57
Check for harbourage and infestations
58
Evaluate monitoring and detection systems
59
Summarize pest control
60
Approval: Pest control
61
Personnel hygiene & employee facilities:
62
Check hygiene facilities and toilets
63
Inspect staff canteens and eating areas
64
Evaluate personal hygiene and protective clothing
65
Summarize personnel hygiene and employee facilities
66
Approval: Personnel hygiene & facilities
67
Rework:
68
Evaluate storage, identification and traceability
69
Evaluate rework usage
70
Summarize rework
71
Approval: Rework
72
Product recall procedures:
73
Evaluate product recall procedure
74
Summarize product recall procedures
75
Approval: Product recall procedures
76
Warehousing:
77
Inspect vehicles, conveyances and containers
78
Summarize warehousing practices
79
Approval: Warehousing
80
Final steps:
81
Make overall comment on internal audit
82
Approval: Internal audit successfully completed
83
Sources:
84
Related checklists: