Templates
Quality Assurance
Control Design Effectiveness Review Checklist
🔍

Control Design Effectiveness Review Checklist

1
Identify Control Design Effectiveness Review Objectives
2
Prepare a draft of the control design
3
Ensure all relevant control elements are included in the draft design
4
Approval: Draft Design
5
Perform a Preliminary Analysis of the Control Design
6
Scrutinize the Control Measures and Procedures
7
Consult with Relevant Stakeholders
8
Approval: Stakeholder Inputs
9
Assess the Potential Risks Associated with the Control Design
10
Review Regulatory Compliance Requirements
11
Evaluate the Control Design Against Set Objectives
12
Approval: Control Design Evaluation
13
Update the Control Design Based on Evaluation
14
Approval: Updated Control Design
15
Conduct a Final Overview of the Control Design
16
Prepare a Final Draft of the Control Design
17
Approval: Final Draft of Control Design
18
Implement the Control Design
19
Perform Post-Implementation Review
20
Approval: Post-Implementation Review