Establish the boundary, horizon, decision owners, and evidence sources for this asset management planning cycle. Confirm that the named lead can coordinate operations, engineering, finance, and compliance input. Record exclusions explicitly so later risk and funding decisions are not based on an assumed scope.
1
One year
2
Three years
3
Five years
4
Ten years
5
Twenty years
Validate asset inventory and data
Reconcile the asset register against maps, work history, finance records, and operator knowledge. Check identifiers, locations, ownership, age, condition evidence, remaining life, and replacement-cost assumptions. Do not treat an inventory as decision-ready when material gaps or duplicate records remain.
1
Complete and reconciled
2
Minor gaps documented
3
Material gaps require remediation
4
Inventory unavailable
5
Independent validation required
1
Verified for planning
2
Usable with documented limitations
3
Needs targeted remediation
4
Needs full reconciliation
5
Blocked by missing source records
Resolve material inventory gaps
Use this exception path when the asset register is not yet reliable enough for risk and investment decisions. Assign each gap, identify the authoritative source, correct duplicates or missing attributes, and preserve evidence of the reconciliation. Escalate unresolved gaps rather than inventing values.
Define required service levels
Translate customer, public-health, regulatory, environmental, and operational expectations into measurable service commitments. Compare current performance with each target and document the source and tolerance. Keep aspirational statements separate from funded commitments.
1
Drinking water quality
2
Supply continuity and pressure
3
Customer response and restoration
4
Environmental performance
5
Safety and security
6
Affordability and financial sustainability
Establish asset decision framework
Define how the utility will balance cost, risk, performance, resilience, compliance, and opportunity before rating assets or projects. Use consistent likelihood and consequence definitions across asset classes. Document weighting choices and decision thresholds so priorities can be reproduced and challenged.
1
Service performance
2
Public health and safety
3
Regulatory compliance
4
Environmental impact
5
Lifecycle cost
6
Resilience and redundancy
7
Customer and community impact
1
Three-level qualitative
2
Five-level qualitative
3
Five-by-five matrix
4
Quantitative expected loss
5
Hybrid quantitative and qualitative
Assess condition and performance
Apply an appropriate evidence method to the in-scope assets or representative cohorts. Distinguish observed condition, performance history, age-based assumptions, and remaining useful life. Record confidence and exceptions, because poor evidence should reduce decision certainty rather than create false precision.
1
Visual inspection
2
Performance testing
3
Maintenance history analysis
4
Failure history analysis
5
Remote monitoring or sensor data
6
Engineering model or desktop review
1
Excellent
2
Good
3
Fair
4
Poor
5
Very poor or failed
Rate failure risk and criticality
Identify credible failure modes, estimate likelihood, and assess consequences for service, health, safety, environment, cost, and compliance. Consider dependencies and lack of redundancy. Use the approved scoring framework and explain uncertainty; a high consequence with weak evidence still requires management attention.
1
Rare
2
Unlikely
3
Possible
4
Likely
5
Almost certain
1
Insignificant
2
Minor
3
Moderate
4
Major
5
Catastrophic
1
Low
2
Moderate
3
High
4
Critical
5
Extreme
Stabilize critical asset risks
Use this exception path for critical or extreme risks that cannot wait for the normal capital cycle. Define an interim operating control, contingency, inspection, repair, isolation, or emergency action; assign an accountable owner and verify the residual risk. Do not close the task on a proposed control without implementation evidence.
1
Low
2
Moderate
3
High
4
Critical
5
Extreme
Evaluate demand and resilience needs
Test the asset plan against demand change, source constraints, climate and hazard exposure, power or supply-chain interruption, cyber or physical disruption, and single points of failure. Record the scenario assumptions and the service consequences. Separate resilience needs from general wish-list improvements.
1
Stable demand
2
Moderate growth
3
Rapid growth
4
Declining demand
5
High uncertainty scenario
1
Drought or source constraint
2
Flood or extreme precipitation
3
Extreme heat or freeze
4
Power or fuel interruption
5
Supply chain disruption
6
Cyber or physical security event
7
Critical dependency failure
1
Strong redundancy
2
Adequate redundancy
3
Partial redundancy
4
Single point of failure
5
Not yet assessed
Compare lifecycle intervention strategies
Compare do-nothing, monitor, maintain, rehabilitate, replace, and non-asset alternatives over the planning horizon. Include operating cost, risk reduction, service benefit, timing, residual value, and uncertainty. Select the lowest lifecycle-cost approach that achieves the required service at an acceptable risk, not simply the lowest upfront price.
1
Monitor and defer
2
Optimize preventive maintenance
3
Rehabilitate or renew
4
Replace asset
5
Add redundancy or capacity
6
Apply non-asset solution
1
Monitor and defer
2
Optimize maintenance
3
Rehabilitate or renew
4
Replace asset
5
Non-asset or operational solution
Optimize operations and maintenance
Turn condition and failure evidence into specific operating, inspection, preventive, predictive, and corrective maintenance changes. Define triggers, skills, spares, documentation, and feedback to the asset register. Avoid adding routine work without explaining the risk or service benefit it controls.
1
Reactive with safeguards
2
Time-based preventive
3
Condition-based preventive
4
Predictive maintenance
5
Reliability-centered maintenance
Prioritize capital improvement program
Convert the risk and lifecycle analysis into a sequenced capital program. For every proposed project, record the service outcome, risk reduction, lifecycle cost, dependencies, delivery window, and accountable owner. Explain the consequence of deferral and avoid ranking solely by asset age.
1
Immediate safety or compliance
2
Near-term critical risk
3
Planned service improvement
4
Lifecycle optimization
5
Monitor for future cycle
Confirm long-term funding capacity
Compare the prioritized program and O&M requirements with forecast revenue, reserves, debt capacity, grants, affordability constraints, and timing. Record the funding gap and the actions needed to close it. Do not mark a plan funded when sources are only speculative.
1
One year
2
Three years
3
Five years
4
Ten years
5
Twenty years
1
Operating revenue or rates
2
Dedicated reserves
3
Debt or bond proceeds
4
State revolving fund
5
Grants or subsidies
6
Developer or partner contributions
Verify compliance and assurance controls
Map asset decisions to applicable drinking-water, environmental, safety, permit, financial, and local requirements. Verify evidence and ownership for open findings. This task records the utility-specific obligations; it does not assume one jurisdiction's rules apply everywhere.
1
Compliant with evidence
2
Compliant with minor actions
3
Corrective action required
4
Material noncompliance escalated
5
Legal or regulatory review required
Set performance measures and reporting
Choose measures that show whether the plan is protecting service, reducing risk, improving asset condition, controlling lifecycle cost, and delivering investments. Define a baseline, target, owner, source, and cadence for each measure. Prefer a small decision-useful set over a large unowned dashboard.
1
Service interruptions and restoration
2
Water quality compliance
3
Asset failure rate
4
Condition and criticality trend
5
Planned versus reactive maintenance
6
Capital delivery performance
7
Lifecycle cost and funding gap
8
Customer impact
1
Monthly
2
Quarterly
3
Semiannual
4
Annual
5
Event-triggered
Build implementation and communication roadmap
Translate the approved strategies into owned actions with dates, dependencies, resources, success measures, and stakeholder communication. Align near-term work with the capital, O&M, funding, data, and compliance decisions already recorded. Surface resource conflicts before approval.
Verify plan completeness and recommendation
Perform a final cross-check before management approval. Confirm that the inventory, service levels, risk, lifecycle strategies, funding, compliance, performance measures, and implementation roadmap agree with one another. List every unresolved assumption or exception and recommend approval only when ownership is clear.