Explore the Ohio EPA Asset Management Template - a comprehensive tool for managing, enhancing, and maintaining asset performance while mitigating risk.
1
Set review scope and accountability
2
Confirm managerial capacity and continuity
3
Document system profile and operating plan
4
Verify schematics maps and asset inventory
5
Assess condition performance and useful life
6
Evaluate criticality and failure risk
7
Define service levels and performance measures
8
Review operations maintenance and work records
9
Verify emergency and contingency readiness
10
Review source water protection obligations
11
Validate approved capacity and infrastructure needs
12
Prioritize rehabilitation and replacement actions
13
Build the capital improvement plan
14
Confirm long term funding strategy
15
Capture community system annual metrics
16
Capture noncommunity system annual metrics
17
Resolve gaps and prepare owner decision
18
Approval: Responsible owner
19
Close review and schedule next cycle
Set review scope and accountability
Establish the exact public water system, review trigger, accountable people, and evidence period before assessing the program. Use the legal owner and current Ohio EPA system classification. The checklist initiator completes this task; later assignments use the selected coordinator and responsible owner. Do not include security-sensitive infrastructure details in general notes.
1
Community public water system
2
Nontransient noncommunity public water system
1
Existing publicly owned system
2
New publicly owned system
3
Existing non-publicly owned system
4
New non-publicly owned system
1
Annual required review
2
Ohio EPA information request
3
Asset management screening follow-up
4
WSRLA loan readiness review
5
Sanitary survey corrective action
6
Major system or ownership change
Confirm managerial capacity and continuity
Document ownership accountability, authority to construct, operate, maintain, fund, and improve the system, and the continuity arrangements for critical personnel. Confirm that roles cover operations, maintenance, treatment, distribution, management, and financial decisions. Record gaps as corrective actions rather than treating a missing document as complete.
1
Current and documented
2
Scheduled within review cycle
3
Required by director and overdue
4
Not required by director
5
Applicability under review
Document system profile and operating plan
Assemble the managerial description required for the asset management program: system characteristics, operating responsibilities, compliance communications, external resources, and purchasing controls for routine and emergency work. Keep named contacts current and verify that the operating plan matches actual practice.
1
Ground water
2
Surface water
3
Purchased treated water
4
Ground water under direct influence
5
Multiple or blended sources
Verify schematics maps and asset inventory
Verify that the source, treatment, storage, and distribution schematic, asset locations, and inventory are current enough to support decisions. The inventory must identify each asset, installation or estimated age, operating status, and location. Flag incomplete or stale records; do not infer dates or locations without labeling them as estimates.
1
Complete and current
2
Minor gaps with owners assigned
3
Material gaps under correction
4
Major gaps prevent prioritization
5
Not yet assessed
Assess condition performance and useful life
Evaluate asset condition, maintenance and repair history, performance, and estimated remaining useful life using a consistent rating method. Base ratings on inspection or reliable operating evidence. Where data is uncertain, record the confidence level and the inspection needed to resolve it.
Evaluate criticality and failure risk
Rank assets using both likelihood of failure and consequence of failure, including public health, service, environmental, financial, and safety consequences. Preserve the scoring rationale so a reviewer can reproduce the priority. Escalate any unacceptable residual risk into the rehabilitation and capital planning tasks.
1
Public health impact
2
Loss of water service
3
Regulatory compliance impact
4
Environmental impact
5
Financial impact
6
Worker or public safety impact
7
Reputation and customer confidence
Define service levels and performance measures
Confirm the sustainable levels of service expected by customers, regulators, and the governing body, then connect each target to a measurable indicator. Compare current performance with the target and identify gaps that should drive maintenance or investment. Avoid targets that cannot be measured from available records.
Review operations maintenance and work records
Confirm that current standard operating procedures, maintenance schedules, and maintenance logs cover applicable wells, intakes, pump stations, electrical and standby power equipment, treatment facilities, tanks, hydrants, valves, and distribution assets. Reconcile planned work with actual work and capture overdue or repeatedly reactive maintenance.
1
Sources reservoirs and intakes
2
Pump stations
3
Electrical controls and auxiliary power
4
Water treatment facilities
5
Storage tanks
6
Hydrants and valves
7
Distribution piping and appurtenances
Verify emergency and contingency readiness
Check that the applicable contingency planning evidence is current, accessible to authorized personnel, and aligned with the asset risks identified in this review. Community systems should use the Chapter 3745-85 contingency plan; nontransient noncommunity systems should use the current Ohio EPA template or an equally complete alternative.
1
Current and exercised
2
Current but exercise overdue
3
Update in progress
4
Material gaps require action
5
Not yet assessed
Review source water protection obligations
Perform the annual source water assessment review and check the applicable protection plan or accepted checklist review cycle. If revisions are necessary, identify the owner and the regulatory submission date; revised plans or checklists are due within sixty days of revision. Retain the decision evidence even when no revision is needed.
1
Endorsed source protection plan
2
Accepted source protection checklist
3
Assessment report only
4
Plan or checklist under development
5
Not applicable with documented basis
1
No revision needed
2
Minor revision required
3
Material revision required
4
Ohio EPA review requested
5
Decision pending additional evidence
Validate approved capacity and infrastructure needs
Compare written approved capacity with current demand and credible growth projections, using the Ohio EPA criteria that apply to the source and treatment configuration. Identify infrastructure needed to maintain approved service. Distinguish a documented capacity constraint from a planning assumption.
Prioritize rehabilitation and replacement actions
Convert condition, criticality, service, maintenance, and capacity findings into a prioritized schedule for repair, rehabilitation, replacement, or expansion. Record the basis, timing, and funding path for every material action. Address the most critical needs first and show why any high-risk item is deferred.
Build the capital improvement plan
Prepare or update the capital improvement plan using annual projections for a three-to-five-year period and a view of significant projects over five to twenty years. Each project needs its purpose, expected year, design and construction estimate, and funding source. Reconcile the plan to the prioritized action schedule.
1
Three years
2
Four years
3
Five years
Confirm long term funding strategy
Demonstrate how operations, debt service, repair, rehabilitation, replacement, and expansion will be funded over the planning horizon. Apply the evidence requirements for the selected ownership and operating profile, including rate evaluation and financial statements where applicable. Treat an unfunded capital need as a decision item, not an assumption.
1
Operating revenue
2
Dedicated reserve fund
3
Rate adjustment
4
Revenue or general obligation debt
5
State revolving loan
6
Grant funding
7
Owner capital contribution
8
Other documented source
Capture community system annual metrics
For a community public water system, record the annual metrics required by Ohio's long-term implementation rule. Use the same definitions and evidence period each year. Explain unusual movement and reconcile planned versus unplanned maintenance time before approval.
Capture noncommunity system annual metrics
For a nontransient noncommunity public water system, record the annual pressure, work, reserve, and service-availability metrics required by Ohio's long-term implementation rule. Link each result to operating or financial evidence and explain any interruption or emergency work.
Resolve gaps and prepare owner decision
Consolidate every unresolved managerial, technical, financial, and documentation gap into an owned corrective-action register. Confirm that high-risk exceptions, missing evidence, funding shortfalls, and regulatory dates are visible to the responsible owner. Do not mark an item closed without objective evidence.
1
Approve as current
2
Approve with tracked actions
3
Return for missing evidence
4
Escalate material risk
5
Seek Ohio EPA clarification
Approval: Responsible owner
Will be submitted for approval:
Set review scope and accountability
Will be submitted
Confirm managerial capacity and continuity
Will be submitted
Document system profile and operating plan
Will be submitted
Verify schematics maps and asset inventory
Will be submitted
Assess condition performance and useful life
Will be submitted
Evaluate criticality and failure risk
Will be submitted
Define service levels and performance measures
Will be submitted
Review operations maintenance and work records
Will be submitted
Verify emergency and contingency readiness
Will be submitted
Review source water protection obligations
Will be submitted
Validate approved capacity and infrastructure needs
Will be submitted
Prioritize rehabilitation and replacement actions
Will be submitted
Build the capital improvement plan
Will be submitted
Confirm long term funding strategy
Will be submitted
Capture community system annual metrics
Will be submitted
Capture noncommunity system annual metrics
Will be submitted
Resolve gaps and prepare owner decision
Will be submitted
Close review and schedule next cycle
After owner approval, store the controlled program record and supporting evidence in the authorized repository, log the approved changes, and schedule the next annual review. If Ohio EPA requested materials, record the actual submission date and proof of delivery. Protect infrastructure and security records from inappropriate disclosure.