GAF TPO Roof Membrane Installation Quality Control Checklist
🔍

GAF TPO Roof Membrane Installation Quality Control Checklist

Optimize the quality of GAF TPO Roof Membrane installations with a comprehensive workflow including inspections, repairs, approvals, and reporting.
1
Verify project scope and specifications
2
Organize the necessary tools, equipment and material
3
Inspect the roof surface condition
4
Prepare the roof surface for GAF TPO membrane installation
5
Lay out the GAF TPO membrane according to manufacturer's instructions
6
Secure the GAF TPO membrane, ensuring proper adhesion
7
Apply seam primer and heat weld seams
8
Perform a visual inspection of the installed membrane for defects or inconsistencies
9
Conduct a probe test
10
Mark areas in need of repair or fixing
11
Carry out necessary repairs and refit any loose areas
12
Approval: Project Manager Testing and Inspection
13
Validate correct installation according to GAF TPO installation guidelines
14
Perform a final quality control check on the installed roof
15
Document the quality control process, noting any challenges or changes made
16
Update project status report
17
Approval: Site Manager Final Report
18
Store all equipment and clean the job site
19
Communicate completion of the project to relevant stakeholders