Explore our comprehensive guide on JIRA asset management, offering an accurate, systematic system for identifying, cataloging, and tracking assets effectively.
1
Confirm scope ownership and success
2
Inventory source systems and owners
3
Define object schema boundaries
4
Model attributes references and labels
5
Define identifiers statuses and lifecycle
6
Configure roles and access controls
7
Prepare source data and mappings
8
Configure and run test import
9
Resolve import and mapping exceptions
10
Validate object data and relationships
11
Configure Jira object field linkage
12
Configure lifecycle controls and monitoring
13
Pilot operational asset scenarios
14
Resolve pilot readiness exceptions
15
Document handover and review cadence
16
Approval: Asset schema readiness
Confirm scope ownership and success
Define the implementation boundary before changing Assets. Agree the business outcome, the schema or asset domain in scope, and the accountable schema manager. Keep the scope to objects that need their own lifecycle, owner, references, reporting, or retained history; record simple descriptive details as attributes instead of separate objects.
1
New schema implementation
2
Existing schema redesign
3
New object type rollout
4
Import source onboarding
5
Jira work linkage change
Inventory source systems and owners
Identify every authoritative source that will create or update the in-scope objects. Confirm who owns each source, how often it changes, and whether another system remains the system of record. Flag conflicting identifiers or unowned feeds now; importing them without an owner creates duplicate and stale objects.
1
Manual object entry
2
CSV file import
3
JSON file import
4
Assets Discovery
5
External connector
6
Data Manager
7
Existing Assets schema
Define object schema boundaries
Design the schema as a coherent workspace for related assets or configuration items. List only object types that teams will manage, reference, report on, or retain independently. Reuse existing types where they already represent the same thing, and document exclusions so later contributors do not recreate duplicate structures.
Model attributes references and labels
For each object type, define the minimum attributes needed to identify, operate, secure, and report on the object. Use references for relationships instead of copying vendor, owner, service, location, or contract data into several types. Choose a clear label attribute and use consistent names so duplicate concepts remain visible.
Define identifiers statuses and lifecycle
Select a stable identifier that incoming records can use to update the correct object rather than creating duplicates. Define lifecycle statuses and the events that move an object between them. Assets has no archive state that removes an object from usage, so distinguish status changes from irreversible deletion and document retention decisions.
1
Planned
2
Ordered
3
In stock
4
Active
5
Under maintenance
6
Retired
7
Disposed
Configure roles and access controls
Apply least-privilege access at the product, schema, and object-type layers. Separate people who only view objects from those who edit objects, alter attributes, manage imports, or change the schema. Check whether sensitive employee, contract, security, or financial attributes require narrower object-type access. Test both permitted and denied access using representative accounts. Jira work-item edit permissions also affect adding or removing linked objects; verify exposure in each relevant context. https://support.atlassian.com/assets/docs/what-are-roles/
1
No sensitive attributes present
2
Schema roles adequately restrict access
3
Object type roles required
4
Attribute design must be reduced
5
Security review required
Prepare source data and mappings
Clean and map the source before importing. Normalize identifiers, names, dates, owners, and status values; decide how references will resolve; and remove records outside the agreed scope. Preserve the mapping evidence so later import changes can be reviewed against the same contract.
1
Ready for controlled test
2
Minor cleansing still required
3
Identifier conflicts unresolved
4
Reference mappings incomplete
5
Source owner decision required
Configure and run test import
Configure the import against the target schema and run a controlled test before scheduling it. Verify object-type mappings, stable identifiers, attribute mappings, missing-value behavior, reference resolution, and any create-or-update rules. Review import history for errors, warnings, and unexpected volume changes. Before enabling recurring imports, test a limited dataset and document matching, missing-object handling, recovery and source ownership. Do not run a destructive full import until the owner approves the outcome.
1
Passed without errors
2
Passed with accepted warnings
3
Failed attribute mapping
4
Failed source availability
5
Not run pending prerequisite
Resolve import and mapping exceptions
Use this exception path when the controlled import is not clean. Diagnose whether the problem is source quality, identifiers, mappings, references, permissions, or availability. Correct the smallest safe cause, rerun the controlled test, and retain the before-and-after result rather than masking warnings.
1
Duplicate or unstable identifiers
2
Attribute type mismatch
3
Unresolved object references
4
Missing required source values
5
Import permission failure
6
Source unavailable or stale
1
Passed without errors
2
Passed with accepted warnings
3
Failed again and escalated
4
Blocked by source owner
5
Blocked by platform limitation
Validate object data and relationships
Inspect a representative sample after the test import. Confirm identifiers, labels, owners, statuses, dates, and references match the source and that relationships point to the intended objects. Search for duplicates, orphans, blank required attributes, and implausible counts; reconcile every material discrepancy.
1
Validated with no discrepancies
2
Validated after corrections
3
Minor accepted exceptions documented
4
Material discrepancies require rework
5
Validation blocked by missing evidence
Configure Jira object field linkage
Connect Assets objects to the Jira work where people need their context. Configure the Assets object custom field against the correct schema, use AQL scope to limit choices to relevant objects, and test the two-way link from work item to object. Confirm portal exposure and multi-object behavior only where the use case requires them. Filter scope uses object attributes; filter work scope can use other work-item values. Test both authorized and unintended selections. Portal exposure applies to Jira Service Management where relevant. https://support.atlassian.com/assets/docs/set-up-the-assets-object-field/
1
Jira work item create
2
Jira work item edit
3
Jira work item view
4
Service portal request
5
Assets linked work items panel
1
Passed in every required context
2
Passed with documented display limitation
3
Field scope returns excess objects
4
Required objects cannot be selected
5
Permissions block intended users
Configure lifecycle controls and monitoring
Choose only the controls needed to keep the schema accurate after launch. Schedule imports only after a manual test succeeds, align the schedule with source readiness and time zone, and record where import history or automation audits will be reviewed. Use status updates for lifecycle changes and avoid creating a second current object.
1
Scheduled source import
2
Assets automation rule
3
Saved AQL quality filter
4
Import history review
5
Object count usage review
6
Manual lifecycle review
1
Daily
2
Weekly
3
Monthly
4
Quarterly
5
Event driven only
Pilot operational asset scenarios
Run realistic scenarios with the people who will use the schema. Test finding an object, linking it to work, changing its owner or status, tracing references, and handling an import or permission exception. Capture observed friction and confirm that the data supports operational decisions without exposing unnecessary information. Do not mark readiness as approved while material data, access or linkage issues remain open. Retest affected scenarios after corrections.
1
Find object by stable identifier
2
Link object to Jira work
3
Change object owner or status
4
Trace related objects and dependencies
5
Review restricted object access
6
Investigate import exception
1
Ready for approval
2
Ready with minor documented limitations
3
Workflow or field changes required
4
Access model changes required
5
Pilot blocked by missing prerequisite
Resolve pilot readiness exceptions
Use this path when the pilot is not ready. Assign each issue to data design, field configuration, access, import, or operating procedure; make only changes supported by the observed evidence; and repeat the affected scenarios. Escalate plan or platform limitations instead of representing them as completed.
1
Schema or attribute design
2
Jira field or AQL scope
3
Roles and permissions
4
Import or source behavior
5
Operating procedure gap
6
Platform or plan limitation
1
Ready for approval
2
Ready with accepted limitation
3
Further configuration required
4
Blocked by external owner
5
Blocked by platform limitation
Document handover and review cadence
Package the operating model for the people who will maintain the schema. Record the source owner, schema manager, update method, import and automation monitoring, quality checks, access review, lifecycle review, escalation route, and deletion authority. Make the next review explicit so the schema does not become an unmanaged inventory. Confirm the paid plan and enabled product capabilities for this tenant; Data Manager and service-portal features may have separate plan requirements. https://support.atlassian.com/assets/docs/assets-in-jira-vs-assets-in-jira-service-management/