Electrical Inspection Checklist: Hospitals and Health Care
Electrical Inspection Checklist: Hospitals and Health Care

Electrical Inspection Checklist: Hospitals and Health Care

Run this Electrical Inspection Checklist: Hospitals and Health Care when you perform your on site inspection.
1
Intro to Hospitals and Health Care:
2
Record inspection details
3
Run general inspection safety checklist
4
Determine the proper classifications for areas to be inspected
5
Make sure correct wiring is used in patient care spaces
6
Check for bonding between panelboards
7
Verify each patient bed location has two or more branch circuits
8
Verify each patient bed location has eight or more receptacles
9
Check for tamper-resistant coverings in pediatric spaces
10
Verify each critical care bed has two or more branch circuits
11
Verify each critical care bed has a critical branch receptacle
12
Verify each critical care bed has fourteen or more receptacles
13
Verify each critical care bed has receptacle connected to separate source
14
Make sure there are 36 receptacles or more in operating rooms
15
Make sure all bed location receptacles are hospital-grade
16
Check wet procedure locations for GFCI device protection
17
Hospitals and Ambulatory Care Facilities with Critical Care Areas:
18
Review the essential electrical systems
19
Review load calculations for the essential electrical systems
20
Verify life safety and critical branches are wired separately
21
Check the mechanical protection for critical branch wiring
22
Verify the independence of the life safety branch
23
Make sure two independent sources for essential electrical system
24
Determine the coordination of the overcurrent devices
25
Nursing Homes and Limited Care Facilities:
26
Review the essential electrical system
27
Review load calculations for the essential electrical system
28
Verify that the life safety wiring is separate from other wiring
29
Make sure the essential electrical system has two sources
30
Clinics, Medical, and Dental Offices:
31
Check an essential electrical system is present where necessary
32
Check an alternative power source is present
33
Further Checks Applicable to All Health Care Facilities:
34
Determine whether hazardous anesthetizing locations exist
35
Check for appropriate wiring in hazardous anesthetizing locations
36
Verify power circuits in flammable locations are isolated
37
Check for battery powered lights in anesthetizing locations
38
Check the supply circuits to X-ray equipment
39
Check capacity and disconnecting means for X-ray equipment
40
Verify supply currents to X-rays meet ampacity
41
Make sure enclosures for high voltage parts are grounded
42
Make sure systems in patient care areas have proper insulation
43
Check isolated power systems for proper installation
44
Verify second level GFPE where applicable
45
Write down overall notes regarding inspection
46
Send report via email to key stakeholders